CN202418197U - 一种隧道工程中防破坏监控量测收敛测点辅助装置 - Google Patents
一种隧道工程中防破坏监控量测收敛测点辅助装置 Download PDFInfo
- Publication number
- CN202418197U CN202418197U CN2011205695579U CN201120569557U CN202418197U CN 202418197 U CN202418197 U CN 202418197U CN 2011205695579 U CN2011205695579 U CN 2011205695579U CN 201120569557 U CN201120569557 U CN 201120569557U CN 202418197 U CN202418197 U CN 202418197U
- Authority
- CN
- China
- Prior art keywords
- measured
- measuring point
- connecting rod
- auxiliary device
- screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本实用新型涉及一种隧道工程中防破坏监控量测收敛测点辅助装置,包括嵌入式固定杆、螺纹卡钳止脱槽、螺纹头、测点连接杆、测点挂钩、防尘保护盖,嵌入式固定杆一端为圆锥形钻凿头,使用时将其放入钻孔中,然后用锚固剂加固,便可固定在隧道边墙之中,另一端设有螺纹卡钳止脱槽,可以和测点连接杆的螺纹头紧密连接;测点连接杆一端设有测点挂钩,用于连接钢尺收敛计测量,用于测量时和钢尺收敛计上的收敛钩相连;另一端为螺纹头。由于本实用新型的嵌入式固定杆在不进行测量时,全部嵌入在隧道边墙内,所以可以有效防止测点被爆破飞石或铲车破坏,同时,本实用新型还具有制作材料成本低,布设方法简单等优点。
Description
技术领域
本实用新型涉及一种监控量测领域,具体地说是一种隧道工程中防破坏监控量测收敛测点辅助装置。
背景技术
监控量测技术是现代隧道施工的重要组成部分,是监控围岩与结构稳定性的重要手段,当进行隧道施工时,尤其是对于Ⅳ级以上围岩隧道施工监控量测是必不可少的,它是确保初期支护安全合理,确定二次衬砌施作时间的关键工序,并对洞内各施工工序衔接有重要的指导意义。通过监控量测和及时信息反馈来修正设计参数,以达到设计合理、施工高效的目的。地下洞室开挖后,围岩周边收敛和拱顶下沉是反映围岩与支护系统力学性态的最直接、最明显的物理量,通过围岩收敛和拱顶下沉监测可了解围岩和支护系统的稳定状态。监控量测可以在隧道的施工过程中,对围岩和支护、衬砌受力变形状态的量测,通过对量测结果的分析来判断围岩支护的稳定性和应力应变状态,判断隧道和围岩是否稳定和安全,并由此来校正、修改设计和指导施工,评定初期支护和二衬设计的合理性,从而指导施工、反馈设计和对设计进行优化。
为了及时得到掌子面开挖时的围岩变形数据,监测点往往布设在距离开挖断面不远处,而且以往布设的收敛测点钩,很大一部分裸露在边墙外,这样做的弊端是,由于掌子面的爆破,碎石有可能会砸到布设的测点,或者除渣车和铲车会碰到测点,从而导致测点钩变形。
实用新型内容
本实用新型的目的是为克服上述现有技术的不足,提供一种结构简单、成本低的隧道工程中防破坏监控量测收敛测点辅助装置,由于本实用新型的嵌入式固定杆在不进行测量时,全部嵌入在隧道边墙内,所以可以有效防止测点被爆破飞石或铲车破坏。
为实现上述目的,本实用新型采用下述技术方案:
一种隧道工程中防破坏监控量测收敛测点辅助装置,包括嵌入式固定杆、螺纹卡钳止脱槽、螺纹头、测点连接杆、测点挂钩、防尘保护盖,所述嵌入式固定杆一端为圆锥形钻凿头,另一端设有螺纹卡钳止脱槽,测点连接杆一端设有用于连接钢尺收敛计测量的测点挂钩,另一端为与螺纹卡钳止脱槽相配合的螺纹头。
所述嵌入式固定杆上设置螺纹卡钳止脱槽的端面上设有一放置防尘保护盖的环形凹槽。
所述测点连接杆的螺纹头与嵌入式固定杆上螺纹卡钳止脱槽内螺纹形状要一致,保证 每次连接完毕时连接处无空隙。
所述嵌入式固定杆整体都在隧道边墙内。
本实用新型在使用时,先将嵌入式固定杆的圆锥形钻凿头插入隧道侧壁的围岩之中,然后添加锚固剂,使嵌入式固定杆充分固定,并保证嵌入式固定杆整体都在隧道边墙内,最后,将防尘保护盖盖好。测量时,取出测点连接杆,打开防尘保护盖,将测点连接杆的螺纹头一端与嵌入式固定杆的螺纹卡钳止脱槽充分连接,并保证连接完毕时连接处无空隙。然后可将钢尺收敛计的测量钩与测点连接杆上的测点挂钩连接,进行收敛测量,测量完毕后将测点连接杆卸下、收起,将防尘保护盖盖好。由于本实用新型的嵌入式固定杆在不进行测量时,全部嵌入在隧道边墙内,所以可以有效防止测点被爆破飞石或铲车破坏,同时,本实用新型还具有制作材料成本低,布设方法简单等优点。
附图说明
图1是本实用新型结构示意图;
其中1.测点连接杆,2.测点挂钩,3.螺纹头,4.嵌入式固定杆,5.圆锥形钻凿头,6.螺纹卡钳止脱槽,7.防尘保护盖。
具体实施方式
下面结合附图和实施例对本实用新型进一步说明。
如图1所示,一种隧道工程中防破坏监控量测收敛测点辅助装置,嵌入式固定杆4一端为圆锥形钻凿头5,使用时将其放入钻孔中,添加锚固剂,便可固定在隧道边墙之中,另一端设有螺纹卡钳止脱槽6,测点连接杆1一端设有测点挂钩2,用于连接钢尺收敛计测量,另一端为螺纹头3。嵌入式固定杆4上设置螺纹卡钳止脱槽6的端面上设有一放置防尘保护盖7的环形凹槽。
测点连接杆1的螺纹头3与嵌入式固定杆4上螺纹卡钳止脱槽6内螺纹形状要一致,保证每次连接完毕时连接处无空隙。嵌入式固定杆4整体都在隧道边墙内。
具体的工作流程如下:
⑴将嵌入式固定杆4的圆锥形钻凿头5插入隧道侧壁的围岩之中,添加锚固剂,使其固定在围岩内部。最后,将防尘保护盖7盖好。
⑵测量时,取出测点连接杆1,打开防尘保护盖7,然后将测点连接杆1的螺纹头3一端与嵌入式固定杆4的螺纹卡钳止脱槽6充分连接,并保证连接完毕时连接处无空隙。
⑶将钢尺收敛计的测量钩与测点连接杆1上的测点挂钩2连接,进行收敛测量。
⑷测量完毕后,将测点连接杆卸下、收起,将防尘保护盖盖好。
Claims (3)
1.一种隧道工程中防破坏监控量测收敛测点辅助装置,其特征在于:包括嵌入式固定杆、螺纹卡钳止脱槽、螺纹头、测点连接杆、测点挂钩、防尘保护盖,所述嵌入式固定杆一端为圆锥形钻凿头,另一端设有螺纹卡钳止脱槽,测点连接杆一端设有用于连接钢尺收敛计测量的测点挂钩,另一端为与螺纹卡钳止脱槽相配合的螺纹头。
2.根据权利要求1所述的一种隧道工程中防破坏监控量测收敛测点辅助装置,其特征在于:所述嵌入式固定杆上设置螺纹卡钳止脱槽的端面上设有一放置防尘保护盖的环形凹槽。
3.根据权利要求1所述的一种隧道工程中防破坏监控量测收敛测点辅助装置,其特征在于:所述测点连接杆的螺纹头与嵌入式固定杆上螺纹卡钳止脱槽内螺纹形状一致。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205695579U CN202418197U (zh) | 2011-12-30 | 2011-12-30 | 一种隧道工程中防破坏监控量测收敛测点辅助装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205695579U CN202418197U (zh) | 2011-12-30 | 2011-12-30 | 一种隧道工程中防破坏监控量测收敛测点辅助装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202418197U true CN202418197U (zh) | 2012-09-05 |
Family
ID=46742967
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011205695579U Expired - Fee Related CN202418197U (zh) | 2011-12-30 | 2011-12-30 | 一种隧道工程中防破坏监控量测收敛测点辅助装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202418197U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102494007A (zh) * | 2011-12-30 | 2012-06-13 | 山东大学 | 隧道工程中防破坏监控量测收敛测点辅助装置及埋设方法 |
CN103604341A (zh) * | 2013-11-22 | 2014-02-26 | 山东大学 | 一种用于隧道监控量测中的收敛辅助装置及使用方法 |
-
2011
- 2011-12-30 CN CN2011205695579U patent/CN202418197U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102494007A (zh) * | 2011-12-30 | 2012-06-13 | 山东大学 | 隧道工程中防破坏监控量测收敛测点辅助装置及埋设方法 |
CN103604341A (zh) * | 2013-11-22 | 2014-02-26 | 山东大学 | 一种用于隧道监控量测中的收敛辅助装置及使用方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102493989A (zh) | 隧道crd法施工中监控量测收敛测点辅助装置及埋设方法 | |
CN204436476U (zh) | 基于衬砌应变的隧道塌方自动监测装置 | |
CN102494598A (zh) | 一种隧道监控量测中拱顶沉降点测量装置及埋设方法 | |
CN109405815B (zh) | 一种用于隧道内测量周边收敛的快速固定装置及方法 | |
CN102494007B (zh) | 隧道工程中防破坏监控量测收敛测点辅助装置及埋设方法 | |
CN103205937B (zh) | 一种万能杆件预埋节点的安装方法 | |
CN105179017B (zh) | 位移应变锚杆综合预警系统 | |
CN104061871A (zh) | 一种新型隧道非接触变形监测方法 | |
CN102889428A (zh) | 顶管施工后管道中心线偏差的非开挖纠正方法及设备 | |
CN104929647A (zh) | 顶管机止退装置及其安装方法 | |
CN102926413A (zh) | 一种灌注桩桩端取样预埋管 | |
CN202418197U (zh) | 一种隧道工程中防破坏监控量测收敛测点辅助装置 | |
CN108072363A (zh) | 一种隧道工程监控量测测点保护装置及安装方法 | |
CN104047611A (zh) | 软弱破碎围岩隧道二衬施作的最佳时机判别方法 | |
CN207703214U (zh) | 一种隧道工程监控量测测点保护装置 | |
CN105627986A (zh) | 基于全站仪法的地下工程拱顶沉降量测装置 | |
CN202418148U (zh) | 一种隧道crd法施工中监控量测收敛测点辅助装置 | |
CN110644492B (zh) | 陡倾角宽大裂隙地层综合灌浆施工方法 | |
CN112815144A (zh) | 人工顶管施工工艺 | |
CN202420416U (zh) | 一种隧道监控量测中拱顶沉降点测量装置 | |
CN204514516U (zh) | 一种用于监测坝基应力的装置 | |
CN104790369A (zh) | 一种用于监测坝基应力的装置及方法 | |
CN110159308A (zh) | 一种隧道长管棚定位方法 | |
CN204532429U (zh) | 一种可拆卸及精度高的隧道收敛监测挂钩 | |
CN102777169A (zh) | 瓦斯压力俯角测量方法及系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120905 Termination date: 20151230 |
|
EXPY | Termination of patent right or utility model |