CN202416701U - Combined pre-stressed concrete beam with binder and no binder - Google Patents

Combined pre-stressed concrete beam with binder and no binder Download PDF

Info

Publication number
CN202416701U
CN202416701U CN2011205642730U CN201120564273U CN202416701U CN 202416701 U CN202416701 U CN 202416701U CN 2011205642730 U CN2011205642730 U CN 2011205642730U CN 201120564273 U CN201120564273 U CN 201120564273U CN 202416701 U CN202416701 U CN 202416701U
Authority
CN
China
Prior art keywords
hinge line
steel hinge
prestressing
prestress
binder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205642730U
Other languages
Chinese (zh)
Inventor
王平
牟广涛
杨建新
刘明周
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN2011205642730U priority Critical patent/CN202416701U/en
Application granted granted Critical
Publication of CN202416701U publication Critical patent/CN202416701U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model relates to a pre-stressed concrete beam of buildings. The combined pre-stressed concrete beam with a binder and no the binder comprises a frame beam of the building, and is characterized in that a pre-stressed stranded steel wire without a binder and a pre-stressed stranded steel wire with the binder are arranged in the same frame beam. The combined pre-stressed concrete beam can exert individual advantages of the pre-stressed stranded steel wire with the binder and the pre-stressed stranded steel wire without the binder.

Description

Bonding is arranged and do not have bonding combined prestress concrete beam
Technical field
The utility model relates to a kind of prestressed concrete beam of building.
Background technology
The use of new material and new technology is that country widelys popularize in building trade; Building energy-saving (economize steel, economize cement) design is widelyd popularize; The prestressed structure form of large span is used in various building structure in a large number; Become the direction of modern designs research, construction technology research tracking, and progressively obtain promotion and application.But in practical project is used, employing be single have bonding or prestressing without bondn form of structure, though reached the certain designed effect, there is a following engineering difficult problem in single prestressed structure form:
1, the bonded prestress steel strand are because of the friction in bellows (friction between steel strand friction, steel strand and the tube wall each other, steel strand and the friction of bellows bleeding), and loss of prestress is bigger when stress application;
2, the bonded prestress effect is relatively good, but fluctuating stress loss in time is bigger;
Though it is 3, un-bonded prestressed steel strand has protective sleeve and loss of prestress is less, should technology higher to stretch-draw end ground tackle quality, performance demands;
4, un-bonded prestressed steel strand is because the sheath protection can be slided, and its intensity can not play one's part to the full in beam.
Summary of the invention
The purpose of the utility model is to be to provide a kind of bonding to be arranged and do not have bonding combined prestress concrete beam, and this combined prestress concrete beam can be brought into play bonded prestress steel hinge line and prestressing without bondn steel hinge line advantage separately.
For realizing above-mentioned purpose; The technical scheme that the utility model is taked is: bonding is arranged and do not have bonding combined prestress concrete beam; It comprises the Vierendeel girder of building, it is characterized in that being provided with in the same Vierendeel girder prestressing without bondn steel hinge line and bonded prestress steel hinge line.
Described prestressing without bondn steel hinge line is 4, and described bonded prestress steel hinge line is 2 bundles (24).
The utility model belongs to the civil construction project field, and the steel hinge line of bonded prestress to the effect that of research and prestressing without bondn steel hinge line are tied two-in-one combined prestress concrete beam, and first, prestressing technique at home and abroad is used widely.But be the single application structure form of bonded prestress steel hinge line and prestressing without bondn steel hinge line; With single prestressing force form relatively this combined prestress concrete beam technology have remarkable advantages, bonding is arranged and do not have the two-in-one combined prestress concrete beam of bonding and more can embody both advantages; The second, the method for installation of the layout of combined prestress concrete beam and stretch-draw is more flexible, greatly reduces construction difficulty and construction cost.
Solved following problem in the construction: 1. there is bonding at ater-casting place and does not have the two-in-one prestressed concrete beam of bonding and use, and fully complementation has bonding and prestressing without bondn advantage separately, and the minimizing beam is the degree of disturbing under the load action in use; Solved the big (40kN/m of preloading load 2) a designing requirement difficult problem; This method can reduce the loss of prestress of prestressed concrete, gives full play to bonding and un-bonded prestressed steel strand advantage separately.2. place, ater-casting bonded prestress steel hinge line stretch-draw end layout, installation, stretch-draw problem have been solved; 3. solved the problem of place, ater-casting prestressing without bondn steel hinge line layout, installation, stretch-draw; 4. combined prestress concrete beam construction speed and cost problem have been solved.
The beneficial effect of the utility model is: adopt and be provided with prestressing without bondn steel hinge line and bonded prestress steel hinge line in the same Vierendeel girder, this combined prestress beam can be brought into play bonded prestress steel hinge line and prestressing without bondn steel hinge line advantage separately.
Description of drawings
Fig. 1 is bonding being arranged and not having the arrangement diagram (among the figure main frame beam be the combined prestress beam) in length and breadth of bonding combined prestress concrete beam of the utility model;
Fig. 2 is that the utility model embodiment 1 has the profile that bonds and do not have bonding combined prestress concrete beam;
Fig. 3 is that the utility model embodiment 2 has the profile that bonds and do not have bonding combined prestress concrete beam;
Among the figure: A, B, C, D district are that two floor plates are divided block by the ater-casting; 1-prestressing without bondn steel hinge line; 2-bonded prestress steel hinge line, 3-ater-casting, 4-floor (or claiming floor plate), 5-Vierendeel girder.
The specific embodiment
Embodiment 1:
Like Fig. 1, shown in Figure 2; Bonding is arranged and do not have bonding combined prestress concrete beam; It comprises Vierendeel girder 5, prestressing without bondn steel hinge line 1 and the bonded prestress steel hinge line 2 of building; Be provided with prestressing without bondn steel hinge line 1 and bonded prestress steel hinge line 2 (prestressing without bondn steel hinge line 1 and bonded prestress steel hinge line 2 are cast in the Vierendeel girder) in the same Vierendeel girder 5 when pouring into a mould the concrete of Vierendeel girder.The two ends of prestressing without bondn steel hinge line 1 and bonded prestress steel hinge line 2 link to each other with ground tackle respectively (after the bonded prestress steel hinge line passes bellows by the prestressing force steel hinge line; Bellows interior is carried out slip casting, and injecting cement paste is linked to be integral body with bellows and prestress wire).
Described prestressing without bondn steel hinge line is 4 and is arranged to two rows; Form first row and second row; Described bonded prestress steel hinge line is that 2 bundles are arranged in the 3rd row, and it is (inner, or claim the middle part that the prestressing without bondn steel hinge line is positioned at the inner edge in the cross section of Vierendeel girder; Between the 2 bundle bonded prestress steel hinge lines), the bonded prestress steel hinge line is positioned at the both sides (a branch of) in the cross section of Vierendeel girder on one side.
Embodiment 2:
As shown in Figure 3; Bonding is arranged and do not have bonding combined prestress concrete beam; It comprises Vierendeel girder 5, prestressing without bondn steel hinge line 1 and the bonded prestress steel hinge line 2 of building, is provided with prestressing without bondn steel hinge line 1 and bonded prestress steel hinge line 2 in the same Vierendeel girder 5.The two ends of prestressing without bondn steel hinge line 1 and bonded prestress steel hinge line 2 link to each other with ground tackle respectively.
Described prestressing without bondn steel hinge line is 4 and is arranged to first row; Described bonded prestress steel hinge line is that 2 bundles are arranged to second row; It is (inner that the prestressing without bondn steel hinge line is positioned at the inner edge in cross section of Vierendeel girder; Or claim the middle part, and between the 2 bundle bonded prestress steel hinge lines), the bonded prestress steel hinge line is positioned at the both sides (a branch of) in the cross section of Vierendeel girder on one side.
Being provided with of ground tackle can have various ways, all can be fixed in like ground tackle on the side column or side bar of building; Perhaps ground tackle just is arranged on the Vierendeel girder.Being provided with of ground tackle can also be adopted: the haunch concrete (back-up block) that an end of bonded prestress steel hinge line 2 is arranged on the floor 4 below Vierendeel girders 5 is located; One end of prestressing without bondn steel hinge line 1 be fixed in floor 4 above, the other end of bonded prestress steel hinge line 2 and prestressing without bondn steel hinge line 1 all is fixed on the side column or side bar of building.

Claims (3)

1. bonding is arranged and do not have bonding combined prestress concrete beam, it comprises the Vierendeel girder of building, it is characterized in that being provided with in the same Vierendeel girder prestressing without bondn steel hinge line and bonded prestress steel hinge line.
2. according to claim 1 have bonding and do not have bonding combined prestress concrete beam; It is characterized in that: described prestressing without bondn steel hinge line is 4 and is arranged to two rows; Form first row and second row; Described bonded prestress steel hinge line is that 2 bundles are arranged in the 3rd row, and the prestressing without bondn steel hinge line is positioned at the inner edge in the cross section of Vierendeel girder, and the bonded prestress steel hinge line is positioned at the both sides in the cross section of Vierendeel girder.
3. according to claim 1 have bonding and do not have bonding combined prestress concrete beam; It is characterized in that: described prestressing without bondn steel hinge line is 4 and is arranged to first row; Described bonded prestress steel hinge line is that 2 bundles are arranged to second row; The prestressing without bondn steel hinge line is positioned at the inner edge in the cross section of Vierendeel girder, and the bonded prestress steel hinge line is positioned at the both sides in the cross section of Vierendeel girder.
CN2011205642730U 2011-12-29 2011-12-29 Combined pre-stressed concrete beam with binder and no binder Expired - Fee Related CN202416701U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205642730U CN202416701U (en) 2011-12-29 2011-12-29 Combined pre-stressed concrete beam with binder and no binder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205642730U CN202416701U (en) 2011-12-29 2011-12-29 Combined pre-stressed concrete beam with binder and no binder

Publications (1)

Publication Number Publication Date
CN202416701U true CN202416701U (en) 2012-09-05

Family

ID=46741479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205642730U Expired - Fee Related CN202416701U (en) 2011-12-29 2011-12-29 Combined pre-stressed concrete beam with binder and no binder

Country Status (1)

Country Link
CN (1) CN202416701U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924683A (en) * 2014-04-14 2014-07-16 北京工业大学 Prestress connected concrete beam rectangular steel tube concrete column node
CN113529940A (en) * 2021-06-25 2021-10-22 吉林建筑大学 Prestress assembly type manual hinge, self-adaptive damping structure system and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924683A (en) * 2014-04-14 2014-07-16 北京工业大学 Prestress connected concrete beam rectangular steel tube concrete column node
CN113529940A (en) * 2021-06-25 2021-10-22 吉林建筑大学 Prestress assembly type manual hinge, self-adaptive damping structure system and construction method thereof

Similar Documents

Publication Publication Date Title
CN203729193U (en) Low tower stay cable reinforced T-type rigid framework system with suspension beams
CN202202577U (en) Post disassembly structure of pre-stressed support beam
CN103132708B (en) Beam-column joint reinforcing method and beam-column joint reinforcing device
CN2477701Y (en) Connecting structure of bridge having simple support varied as continuation
CN202416701U (en) Combined pre-stressed concrete beam with binder and no binder
CN103898834A (en) Concrete-filled steel tube composite beam and trussed cable tower cable-stayed bridge and construction method thereof
CN204645348U (en) Reinforced mesh composite roof truss prestressing force self-compacting concrete superimposed sheet
CN204715195U (en) A kind of Gang Liang – concrete slab composite continuous bridge hogging moment area cracking resistance structure
CN102535861B (en) Tensioning method for bonded and unbonded combination prestress concrete beams at post-cast strip
CN203188112U (en) Steel-concrete rigid-connection combined beam
CN108360359A (en) A kind of raw bamboo fills out core bamboo-concrete slab
CN205116013U (en) Empty core plate beam bridge structure of horizontal reinforced (rfd) assembled
CN209339015U (en) It is constructed using the old T-type bridge reinforcement of steel strand wires and polymer-modified concrete
CN204645347U (en) The laminated floor slab that two-way abdomen gusset steel bar girder is formed
CN208088108U (en) A kind of Simply supported non-uniform bridge structure construction
CN203174892U (en) Pre-stressed tendon single pole multi-thread connector for field processing
CN109898423A (en) A kind of king-tower lower beam pre-stress stretching method and structure
CN215366875U (en) Concrete bridge structure with external vertical prestress
CN202401384U (en) Ballasting structure of steel-truss cable-stayed bridge
CN201778276U (en) Integrally assembled hollow slab bridge
CN111455819B (en) Support between pre-compaction steel pipe concrete rib
CN204715222U (en) A kind of external prestressing strengthening structure of pier cap beam
CN201212126Y (en) Reinforced concrete lining masonry combined main arch ring bridge
CN204703350U (en) A kind of assembling composite floor
CN202969622U (en) Anti-seismic reinforced structure of pre-cast floor slab

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120905

Termination date: 20191229