CN202405666U - Plane arrangement structure of electrical equipment in pump brake transformer substation - Google Patents

Plane arrangement structure of electrical equipment in pump brake transformer substation Download PDF

Info

Publication number
CN202405666U
CN202405666U CN2012200077866U CN201220007786U CN202405666U CN 202405666 U CN202405666 U CN 202405666U CN 2012200077866 U CN2012200077866 U CN 2012200077866U CN 201220007786 U CN201220007786 U CN 201220007786U CN 202405666 U CN202405666 U CN 202405666U
Authority
CN
China
Prior art keywords
cabinet
distribution chamber
low
voltage
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200077866U
Other languages
Chinese (zh)
Inventor
陈肖宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI YOUWEI ENGINEERING DESIGN Co Ltd
Original Assignee
SHANGHAI YOUWEI ENGINEERING DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI YOUWEI ENGINEERING DESIGN Co Ltd filed Critical SHANGHAI YOUWEI ENGINEERING DESIGN Co Ltd
Priority to CN2012200077866U priority Critical patent/CN202405666U/en
Application granted granted Critical
Publication of CN202405666U publication Critical patent/CN202405666U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Patch Boards (AREA)

Abstract

The utility model discloses a plane arrangement structure of electrical equipment in a pump brake transformer substation. The electrical equipment is respectively arranged in a high-voltage soft-start control chamber (1), a high-voltage distribution chamber (4), a control chamber (15) and a low-voltage distribution chamber (16), wherein a high-voltage capacitance compensation cabinet (5) and a high-voltage soft-start cabinet (6) are arranged in the high-voltage soft-start control chamber (1); a gear oil pump control cabinet (8), a maintenance drainage pump cabinet (9), a circulation water supply cabinet (10), a cooling water supply cabinet (11), a fire-fighting water supply cabinet (12), a leakage drainage pump cabinet (13) and a programmable logic controller (14) are arranged in the control chamber (15); a low-voltage switching cabinet (17) and a transformer (18) for the substation are arranged in the low-voltage distribution chamber (16); and a high-voltage switching cabinet (19), a metering cabinet (20) and a direct current screen (21) are arranged in the high-voltage distribution chamber (4). The electrical equipment is installed and integrated in a partitioning mode according to high voltage, low voltage and self-function, operation management and maintenance are facilitated, and safety risk in operation is reduced.

Description

Pump lock transformer station electric equipment plane arrangement structure
Technical field
The utility model relates to hydraulic engineering or Electrical Control Technology field, especially pump lock transformer station electric equipment plane arrangement structure.
Background technology
In the known technology, often extensive use Electrical Control Technology in the hydraulic engineering, especially transformer station's electric equipment are installed, and have relatively high expectations for engineering economy operation and safe operation, and relevant improved targetedly technology is not seen open.
Summary of the invention
The order of the utility model provides a kind of pump lock transformer station electric equipment plane arrangement structure.
The goal of the invention measure that realizes the utility model is: electric equipment is installed between high pressure soft starting control respectively, high voltage power distribution chamber, control room and low-voltage distribution chamber; Wherein high-pressure capacitance compensation cabinet and high pressure soft starting cabinet are installed between high pressure soft starting control; Gear oil pump control cubicle, drainage for overhaul pump cabinet, periodical feeding cabinet, cooling supply tank, fire fighting supply cabinet, seepage draining pump cabinet and programmable logic controller (PLC) are installed on the control room; Low-tension switch cabinet is installed on the low-voltage distribution chamber with the station with transformer, and high-tension switch cabinet, metering cabinet and direct current cabinet are installed on the high voltage power distribution chamber.
The advantage of the utility model is; Electric equipment is according to high and low pressure; And function is carried out subregion and is installed integratedly separately, is convenient to Operations,Administration And Maintenance, reduces the security of operation risk; Only need to start exhaust blower and frequency control air conditioner after installing for long-time running equipment subregion simultaneously, greatly reduce and to manage it with the zone.Simple, energy-conserving and environment-protective safety.
Description of drawings
Fig. 1 is the structural representation of the utility model
Reference numeral: between high pressure soft starting control 1, exhaust blower 2, frequency control air conditioner 3, high voltage power distribution chamber 4, high-pressure capacitance compensation cabinet 5, high pressure soft starting cabinet 6; Chamber door 7, gear oil pump control cubicle 8, drainage for overhaul pump cabinet 9, periodical feeding cabinet 10, cooling supply tank 11; Fire fighting supply cabinet 12, seepage draining pump cabinet 13, programmable logic controller (PLC) 14, control room 15, low-voltage distribution chamber 16; Low-tension switch cabinet 17 is stood with transformer 18, high-tension switch cabinet 19, metering cabinet 20, direct current cabinet 21.
Embodiment
Below in conjunction with specific embodiment, describe:
Electric equipment in the utility model is installed between high pressure soft starting control 1 respectively, high voltage power distribution chamber 4, control room 15 and low-voltage distribution chamber 16; Wherein high-pressure capacitance compensation cabinet 5 and high pressure soft starting cabinet 6 are installed between high pressure soft starting control 1; Gear oil pump control cubicle 8, drainage for overhaul pump cabinet 9, periodical feeding cabinet 10, cooling supply tank 11, fire fighting supply cabinet 12, seepage draining pump cabinet 13 and programmable logic controller (PLC) 14 are installed on control room 15; Low-tension switch cabinet 17 is installed on low-voltage distribution chamber 16 with the station with transformer 18, and high-tension switch cabinet 19, metering cabinet 20 and direct current cabinet 21 are installed on high voltage power distribution chamber 4.
Between high pressure soft starting control 1, high voltage power distribution chamber 4, control room 15 and low-voltage distribution chamber 16 install 2 exhaust blowers 2 respectively.
Between high pressure soft starting control 1, high voltage power distribution chamber 4, control room 15 and low-voltage distribution chamber 16 install 1 frequency control air conditioner 3 respectively.
Between high pressure soft starting control 1, high voltage power distribution chamber 4, control room 15 and low-voltage distribution chamber 16 adjacent regions and exterior wall installation room door 7.
Exhaust blower 2 is AC220V, 0.1KW.
Frequency control air conditioner 3 is AC380V, 2.4KW.
Low-tension switch cabinet 17 is the MNS type.
Stand and use transformer 18 to be 315KVA, the 10/0.4KVSCB10 type.
High-tension switch cabinet 19 is a gas-filled type 10KV N2X type.
Direct current cabinet 21 is 220V, 40Ah.
It is with a western exposure that ventilating window is avoided.
In the utility model; Electric equipment is according to high and low pressure; And function is carried out subregion and is installed integratedly separately, is convenient to Operations,Administration And Maintenance, reduces the security of operation risk; Only need to start exhaust blower 2 and frequency control air conditioner 3 after installing for long-time running equipment subregion simultaneously, greatly reduce and to manage it with the zone.
In above embodiment, do not reach the employing prior aries such as other necessary technologies that relate to enforcement of narration, enumerate detailed description no longer successively.

Claims (4)

1. pump lock transformer station electric equipment plane arrangement structure; It is characterized in that: electric equipment is installed on (1), high voltage power distribution chamber (4), control room (15) and low-voltage distribution chamber (16) between high pressure soft starting control respectively; Wherein high-pressure capacitance compensation cabinet (5) and high pressure soft starting cabinet (6) are installed between high pressure soft starting control (1); Gear oil pump control cubicle (8), drainage for overhaul pump cabinet (9), periodical feeding cabinet (10), cooling supply tank (11), fire fighting supply cabinet (12), seepage draining pump cabinet (13) and programmable logic controller (PLC) (14) are installed on control room (15); Low-tension switch cabinet (17) and station are installed on low-voltage distribution chamber (16) with transformer (18), and high-tension switch cabinet (19), metering cabinet (20) and direct current cabinet (21) are installed on high voltage power distribution chamber (4).
2. pump lock as claimed in claim 1 transformer station electric equipment plane arrangement structure is characterized in that, (1), high voltage power distribution chamber (4), control room (15) and low-voltage distribution chamber (16) are installed 2 exhaust blowers (2) respectively between high pressure soft starting control.
3. pump lock as claimed in claim 1 transformer station electric equipment plane arrangement structure is characterized in that, (1), high voltage power distribution chamber (4), control room (15) and low-voltage distribution chamber (16) are installed 1 frequency control air conditioner (3) respectively between high pressure soft starting control.
4. pump lock as claimed in claim 1 transformer station electric equipment plane arrangement structure is characterized in that, (1), high voltage power distribution chamber (4), control room (15) and low-voltage distribution chamber (16) adjacent regions and exterior wall installation room door (7) between high pressure soft starting control.
CN2012200077866U 2012-01-10 2012-01-10 Plane arrangement structure of electrical equipment in pump brake transformer substation Expired - Fee Related CN202405666U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200077866U CN202405666U (en) 2012-01-10 2012-01-10 Plane arrangement structure of electrical equipment in pump brake transformer substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200077866U CN202405666U (en) 2012-01-10 2012-01-10 Plane arrangement structure of electrical equipment in pump brake transformer substation

Publications (1)

Publication Number Publication Date
CN202405666U true CN202405666U (en) 2012-08-29

Family

ID=46703283

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200077866U Expired - Fee Related CN202405666U (en) 2012-01-10 2012-01-10 Plane arrangement structure of electrical equipment in pump brake transformer substation

Country Status (1)

Country Link
CN (1) CN202405666U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318563A (en) * 2019-06-18 2019-10-11 佛山电力设计院有限公司 A kind of 3 buildings arrangement formula substation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318563A (en) * 2019-06-18 2019-10-11 佛山电力设计院有限公司 A kind of 3 buildings arrangement formula substation

Similar Documents

Publication Publication Date Title
CN204558957U (en) A kind of high-voltage ring main unit
CN204558959U (en) A kind of ring main unit
CN204558958U (en) A kind of outdoor high-voltage ring main unit
CN206401773U (en) A kind of novel high tension switchgear
CN204179544U (en) A kind of 35kV box-type substation used for wind power generation
CN204231176U (en) A kind of integral structure compact high-voltage variable frequency device
CN202405666U (en) Plane arrangement structure of electrical equipment in pump brake transformer substation
CN202503206U (en) Compact box-type transformer station
CN207150252U (en) A kind of water conservancy bureau's DC power supply panel
CN206302058U (en) A kind of practical low voltage drawing-out switching carbinet
CN201884294U (en) Combined type mobile pump station
CN203260930U (en) Novel transformer substation structure arrangement
CN205489248U (en) Novel SF6 gas -insulated PT cabinet for looped netowrk
CN204832290U (en) Electric meter box
CN204045371U (en) A kind of Novel box becomes transformer
CN203326445U (en) Frame type intelligent transformer station
CN101707327A (en) One-piece integrated cabinet of electric quantity calculation, leakage protection and phase splitting compensation
CN205231731U (en) Green building electric energy electric system
CN104477715B (en) The Moveable high-pressure frequency conversion electrical control equipment of sinking hoist
CN107930369A (en) One kind is based on box type transformation manufacture waste gas treatment equipment
CN204496192U (en) Handpiece Water Chilling Units electric control system
CN204481340U (en) Electrical power distribution room rat preventing device
CN204190211U (en) Transformer station box
CN104617494A (en) Rat-proof device of electric switching room
CN201956594U (en) High-low-high power transmission and distribution box type switch equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120829

Termination date: 20210110

CF01 Termination of patent right due to non-payment of annual fee