CN202400602U - Improved conveying device for smashed rim charge of strip steel - Google Patents

Improved conveying device for smashed rim charge of strip steel Download PDF

Info

Publication number
CN202400602U
CN202400602U CN2011205193163U CN201120519316U CN202400602U CN 202400602 U CN202400602 U CN 202400602U CN 2011205193163 U CN2011205193163 U CN 2011205193163U CN 201120519316 U CN201120519316 U CN 201120519316U CN 202400602 U CN202400602 U CN 202400602U
Authority
CN
China
Prior art keywords
rim charge
smashed
conveying device
roller
strip steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205193163U
Other languages
Chinese (zh)
Inventor
胡涛
韩文锋
孔贞峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Bayi Iron and Steel Co Ltd
Original Assignee
Xinjiang Bayi Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Bayi Iron and Steel Co Ltd filed Critical Xinjiang Bayi Iron and Steel Co Ltd
Priority to CN2011205193163U priority Critical patent/CN202400602U/en
Application granted granted Critical
Publication of CN202400602U publication Critical patent/CN202400602U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Accessories And Tools For Shearing Machines (AREA)

Abstract

The utility model belongs to a conveying device for smashed rim charge produced when edges of strip steel are sheared and finished during the production of a rolling steel sheet, in particular to an improved conveying device for smashed rim charge of strip steel. The improved conveying device provided by the utility model comprises a shearing device for finishing the edges of the strip steel; a smashed rim charge chute is arranged on an smashed rim charge outlet of the shearing device; a belt conveyer provided with a groove-shaped carrier roller is arranged below the smashed rim charge chute; the groove-shaped roller is formed by a flat roller and guide rollers arranged at two sides of the flat roller, and the outer ends of the guide rollers incline upwards; and upward-raised well-shaped skidding resistance reinforcing ribs are uniformly arranged on a receiving and bearing surface of a conveyer belt. According to the improved conveying device provided by the utility model, the labor intensity of the workers is alleviated and a continuous operation mode of people and hoisting equipment is converted to an interval operation mode, so that the usage cost of man power and equipment can be lowered.

Description

The load transfer device of the broken rim charge of a kind of improved band steel
Technical field
The utility model belongs to the broken rim charge load transfer device that strip edge portion secateur downcuts in the production of steel rolling thin plate, the load transfer device of the broken rim charge of particularly a kind of improved band steel.
Background technology
In the steel rolling thin plate is produced; Usually all can shear and repair the strip edge portion width dimensions before rolling; Shear so in the pickling process of band steel, accomplish the limit portion of band steel, the side cut material of formation carries out broken section and reclaim melting through cropping cut equipment, utilizes once more.The particle of present side cut directly gets into crop disposal bin through guiding device, and broken rim charge is deposited in the particle collection pit, and the magnetic chuck of utilization driving adsorbs particle from the hole that gathers materials after, and entrucking is transported to the appointment stock ground.There is the problem of two aspects in this operation: the one, need the continual operation of driving, and the hanging device operating load is high; The 2nd, need special messenger's operation of determining a post, human resources expenditure and labour intensity are bigger, are unfavorable for practicing thrift human cost.
Summary of the invention
The purpose of the utility model is to provide the load transfer device of the broken rim charge of a kind of improved band steel, can reduce labor strength, and personnel and hanging device are converted into batch operation by continuous working, reduces the use cost of manpower and equipment.
The purpose of the utility model is achieved in that the load transfer device of the broken rim charge of a kind of improved band steel; The shearing equipment that comprises finishing strip edge portion; Broken rim charge chute is being set in the outlet of the broken rim charge of shearing equipment; Band conveyor with flute profile carrying roller is being set below broken rim charge chute, and the flute profile carrying roller lifts the acclivitous guide reel in roller both sides and outer end and constitutes with being positioned at by lifting roller, on the carrying surface that connects material of belt conveyor, is uniformly distributed with the anti-skidding reinforced rib of the groined type that raises up is being set.
The utility model is being provided with broken rim charge chute at the broken rim charge discharging opening of shearing equipment, below broken rim charge chute, band conveyor is being set, and mainly is made up of driving motor, load-transfer device guide reel, equipment supporter and special-shaped flexible conveyer belt.Driving motor adopts variable frequency regulating speed control, convenient adjusting and control to the particle delivery speed; The load-transfer device guide reel mainly plays the support and the guiding of load-transfer device, level is arranged, dual mode is in tilted layout; Equipment supporter is used to arrange the takeoff output of guide reel and drive of motor; The abnormity flexible conveyer belt has intensity and elasticity preferably, and the carrying surface that connects material of belt conveyor has been made the protruding anti-skidding reinforced rib of well word again, is beneficial in the transmission of particle face of slope to have good attached function.
Give full play to man-machine combination advantage; Reduce labor strength, convert part-time, batch operation into, solve the high expenditure of human cost by the sole duty operation of determining a post; And the activity of original driving continuous working also is converted into timer-operated batch operation; Can make full use of this driving after the loading and unloading of completion hopper and carry out other regional operation lifting, enlarge the scope of work of driving, the cost of investment of minimizing hanging device.
The utility model has been realized the reduction labor strength, makes personnel and hanging device be converted into batch operation by continuous working, has reduced the use cost of manpower and equipment.
Description of drawings
To combine accompanying drawing that the utility model is done further to describe below,
Fig. 1 is the utility model master TV structure scheme drawing;
Fig. 2 is the left TV structure scheme drawing of Fig. 1.
The specific embodiment
The load transfer device of the broken rim charge of a kind of improved band steel; Like Fig. 1, shown in Figure 2; Comprise the shearing equipment 1 of finishing strip edge portion, broken rim charge chute 2 is being set in the outlet of shearing equipment 1 broken rim charge, the band conveyor 3 with flute profile carrying roller is being set below broken rim charge chute 2; The flute profile carrying roller lifts the acclivitous guide reel 5 in roller 4 both sides and outer end and constitutes with being positioned at by lifting roller 4, on the carrying surface that connects material of belt conveyor 6, is uniformly distributed with the anti-skidding reinforced rib of the groined type that raises up is being set.Band conveyor 3 is promoted to the height of appointment with the transportation of broken rim charge, is provided with receiving hopper at the end of band conveyor, stored the particle of a constant volume when receiving hopper after, carry out discharging by driving handling to transport vehicle.After the production period receiving hopper is filled, just need personnel, lifting appliance and transport vehicle carry out the short time operation and accomplish discharging work, have practiced thrift expending of manpower and equipment.

Claims (1)

1. the load transfer device of the broken rim charge of improved band steel; The shearing equipment (1) that comprises finishing strip edge portion; It is characterized in that: broken rim charge chute (2) is being set in the outlet of the broken rim charge of shearing equipment (1); Band conveyor (3) with flute profile carrying roller is being set in the below of broken rim charge chute (2); The flute profile carrying roller lifts the acclivitous guide reels in roller (4) both sides and outer end (5) formation by lifting roller (4) and being positioned at, and on the carrying surface that connects material of belt conveyor (6), is uniformly distributed with the anti-skidding reinforced rib of the groined type that raises up is being set.
CN2011205193163U 2011-12-13 2011-12-13 Improved conveying device for smashed rim charge of strip steel Expired - Fee Related CN202400602U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205193163U CN202400602U (en) 2011-12-13 2011-12-13 Improved conveying device for smashed rim charge of strip steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205193163U CN202400602U (en) 2011-12-13 2011-12-13 Improved conveying device for smashed rim charge of strip steel

Publications (1)

Publication Number Publication Date
CN202400602U true CN202400602U (en) 2012-08-29

Family

ID=46698268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205193163U Expired - Fee Related CN202400602U (en) 2011-12-13 2011-12-13 Improved conveying device for smashed rim charge of strip steel

Country Status (1)

Country Link
CN (1) CN202400602U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020134211A1 (en) * 2018-12-29 2020-07-02 中冶南方工程技术有限公司 Strip steel edge wire processing device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020134211A1 (en) * 2018-12-29 2020-07-02 中冶南方工程技术有限公司 Strip steel edge wire processing device

Similar Documents

Publication Publication Date Title
CN211392693U (en) Lifting device depending on slitting mechanism and belt
CN202988082U (en) Rice mill machine bucket elevator
CN206108117U (en) Before turn over formula dustbin equipment
CN202400602U (en) Improved conveying device for smashed rim charge of strip steel
CN103662622A (en) Bucket elevator for smashed materials
CN203045543U (en) Automatic loading and unloading device of sand blasting machine
CN210527577U (en) Iron leftover material conveying and collecting system
CN205526230U (en) C type induction type lifting machine
CN214800935U (en) Reducing mechanism is used in straw fermentation
CN202191945U (en) Waste tire lifting and feeding device
CN211660738U (en) Cold rolling continuous annealing unit slitter edge recovery plant
CN203726633U (en) Small mobile cement slurry charging car
CN102550233A (en) Unloading device of feed grass cutter
CN202848748U (en) Composite board waste recovery device
CN202321594U (en) Automatic feeding device
CN217578122U (en) Material lifting device of organic fermentation equipment
CN210527756U (en) Machine head chute device of strip mine belt conveyor
CN206901282U (en) A kind of beverage can fast lifting pusher
CN206447109U (en) A kind of belt feeder movement bucket
CN206502427U (en) Material paves conveying arrangement
CN206782842U (en) Lower stockline take-up
CN205953072U (en) Push pedal formula feedway
CN200971464Y (en) Front material feeding equipment for highway maintenance vehicle
CN205888879U (en) Race ring feedway
CN214003401U (en) Ore conveying device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120829

Termination date: 20131213