CN202399516U - Rod end scratching mechanism for cotton swab manufacturing machine - Google Patents

Rod end scratching mechanism for cotton swab manufacturing machine Download PDF

Info

Publication number
CN202399516U
CN202399516U CN201120569509XU CN201120569509U CN202399516U CN 202399516 U CN202399516 U CN 202399516U CN 201120569509X U CN201120569509X U CN 201120569509XU CN 201120569509 U CN201120569509 U CN 201120569509U CN 202399516 U CN202399516 U CN 202399516U
Authority
CN
China
Prior art keywords
cut piece
cut
following
last
cotton
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201120569509XU
Other languages
Chinese (zh)
Inventor
郑汉杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANTOU TAIENKANG MEDICAL EQUIPMENT FACTORY CO Ltd
Original Assignee
SHANTOU TAIENKANG MEDICAL EQUIPMENT FACTORY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANTOU TAIENKANG MEDICAL EQUIPMENT FACTORY CO Ltd filed Critical SHANTOU TAIENKANG MEDICAL EQUIPMENT FACTORY CO Ltd
Priority to CN201120569509XU priority Critical patent/CN202399516U/en
Application granted granted Critical
Publication of CN202399516U publication Critical patent/CN202399516U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Media Introduction/Drainage Providing Device (AREA)

Abstract

A rod end scratching mechanism for a cotton swab manufacturing machine comprises a machine frame, an upper lifting cylinder, an upper scratch block installing seat, an upper scratch block, a lower lifting cylinder, a lower scratch block installing seat and a lower scratch block. A cylinder body of the upper lifting cylinder and a cylinder body of the lower lifting cylinder are both installed on the machine frame, a piston rod of the upper lifting cylinder is connected with the upper scratch block installing seat, the upper scratch block is installed on the upper scratch block installing seat, a piston rod of the lower lifting cylinder is connected with the lower scratch block installing seat, and the lower scratch block is installed on the lower scratch block installing seat. The upper scratch block and the lower scratch block are provided with heating devices, the upper scratch block is arranged above the lower scratch block, the lower end of the upper scratch block is provided with at least one upper scratch protrusion, and the upper end of the lower scratch block is provided with at least one lower scratch protrusion. The rod end scratching mechanism for the cotton swab manufacturing machine is simple and compact in structure, can scratch plastic rods continuously and is high in working efficiency, dents can be formed at the ends of the plastic rods, part of cotton fiber of cotton lumps can be embedded in the dents, and accordingly the cotton lumps can be firmly wound on the plastic rods.

Description

Cotton swab is made the rod end cut mechanism of machine
Technical field
The utility model relates to cotton swab and makes machine, specifically, relates to the rod end cut mechanism that a kind of cotton swab is made machine.
Background technology
In life of today, the use amount of cotton swab is increasing and since sticking plaster have cost low, be easy to advantages such as machine-shaping, shape and dimensional uniformity are good, therefore most of cotton swabs adopt sticking plasters as the label bar.Existing a kind of cotton swab that adopts sticking plaster to make cotton swab is made machine; Sticking plaster gets into the cotton swab conveying mechanism from the sticking plaster outlet of sticking plaster hopper; The cotton swab conveying mechanism is delivered to cotton-winding mechanism, glue-spraying mechanism, cotton-wool shaping mechanism, drying mechanism successively with sticking plaster, twines cotton-wool in the sticking plaster end by cotton-winding mechanism earlier, on cotton-wool, sprays glue by glue-spraying mechanism again; Then by the cotton-wool shaping mechanism with the cotton-wool moulding and cotton-wool is wrapped on the sticking plaster end; After the drying mechanism oven dry, cotton-wool is attached on the sticking plaster end, forms cotton swab.But because rod end cut mechanism is set, can't form cut in the sticking plaster end, the sticking plaster end surface is smooth, so cotton-wool twines firmly inadequately on sticking plaster, and cotton-wool comes off from sticking plaster easily.
China utility model patent specification CN201384631Y discloses an a kind of cotton impression device of cotton swab volume cotton machine; This cotton impression device have the cotton wheel of volume and with the cotton wheel of volume excircle be separated by certain interval arc washboard and be positioned at the other cotton moulding arc plate of the cotton wheel of volume side; On the outer convex surface of a cotton moulding arc plate back segment; Also be fixed with at least two impression silks or two impression sheets, the plane at the plane at every impression silk place or every impression sheet place and the axis normal of the cotton wheel of volume.A this cotton impression device can be in the final stage of a cotton moulding; Impression silk or impression sheet with pressure is big are implemented powerful extruding to the root of in type cotton head (being cotton-wool); Make impression; And might some cotton silk be pressed in the impression, thereby make cotton head sign twine tightlier on the bar, more firm.But a this cotton impression device only be applicable to manufacturing with bamboo let or peg wood as the cotton swab of signing bar; And for sticking plaster as the cotton swab of signing bar; Because sticking plaster is generally hollow bar, extruding force more then can be damaged sticking plaster by pressure, and extruding force is less then can resilience to be taken place and reset; Therefore adopt a this cotton impression device, can't form effective indenture in the sticking plaster end and make that cotton-wool is firm to be wrapped on the sticking plaster.
Summary of the invention
The utility model technical problem to be solved provides the rod end cut mechanism that a kind of cotton swab is made machine; This rod holds cut mechanism to process indenture in the end of sticking plaster; Thereby cotton-wool can firmly be wrapped on the sticking plaster, prevent that cotton-wool from coming off from sticking plaster.The technical scheme that adopts is following:
A kind of cotton swab is made the rod end cut mechanism of machine; It is characterized in that comprising frame, go up lift cylinder, go up cut piece mount pad, go up the cut piece, lift cylinder, cut piece mount pad and following cut piece down down; The cylinder body of the cylinder body of last lift cylinder and following lift cylinder is installed on the frame; The piston rod of last lift cylinder is connected with last cut piece mount pad; Last cut piece is installed on the cut piece mount pad, and the piston rod of following lift cylinder is connected with following cut piece mount pad, and following cut piece is installed in down on the cut piece mount pad; Be equipped with heater on last cut piece and the following cut piece; Last cut piece is located at down cut piece top, and last cut piece lower end is provided with cut projection at least one, and following cut piece upper end is provided with at least one cut projection down.
The above-mentioned lift cylinder of going up can drive cut piece mount pad and goes up the cut piece and together go up and down, following lift cylinder can drive down cut piece mount pad reach under the cut piece together go up and down.In order to make cut piece mount pad and to go up the cut piece and go up and down more steady; The upper rail of trend up and down can be set on frame; Last cut piece mount pad and upper rail are slidingly matched, and the piston rod of last lift cylinder can drive cut piece mount pad and go up the cut piece and together go up and down along upper rail; The cut piece goes up and down more steady in order to make down cut piece mount pad reach down; The lower guideway of trend up and down can be set on frame; Following cut piece mount pad and lower guideway are slidingly matched, and the piston rod of following lift cylinder can drive down cut piece mount pad and following cut piece together goes up and down along lower guideway.
Last cut piece adopts the metal or alloy material to process with following cut piece usually.In a kind of concrete scheme, the heater on the last cut piece is the conduction oil passage of being located in the cut piece, through in this conduction oil passage, feeding the conduction oil that flows, to last cut piece heating; Heater on the following cut piece is the conduction oil passage of being located at down in the cut piece, through in this conduction oil passage, feeding the conduction oil that flows, to cut piece heating down.In the concrete scheme of another kind, the heater on the last cut piece is the heating of being located in the cut piece, generate heat after this heating energized, and to last cut piece heating; Heater on the following cut piece is the heating of being located at down in the cut piece, generates heat after this heating energized, and to cut piece heating down.In the concrete scheme of another kind, the heater on the last cut piece is the heating that contacts with last cut piece outer surface, generate heat after this heating energized, and to last cut piece heating; Heater on the following cut piece is the heating that contacts with following cut piece outer surface, generates heat after this heating energized, and to cut piece heating down.
Usually adopt chain to carry sticking plaster; The chain equal intervals is provided with a plurality of grooves that can hold sticking plaster; Sticking plaster is in the groove and is perpendicular with the direction of advance of chain, and the sticking plaster end is with last cut projection, the cut projection position is corresponding down.Usually going up cut projection lower end aligns with following cut projection upper end; Distance between last cut projection lower end and the following cut projection upper end is less than the diameter of sticking plaster; Make when sticking plaster passes through rod end cut mechanism; Last cut projection lower end all can touch the sticking plaster end with following cut projection upper end, and upside, downside in the sticking plaster end all mark indenture.The quantity of cut projection had determined the indenture quantity of sticking plaster end behind the cut under last cut projection reached, and generally was provided with 1-4 on the last cut piece and went up the cut projection, generally was provided with cut projection under 1-4 on the following cut piece.In a concrete scheme, the above-mentioned cut projection that goes up is to go up cut projection piece, and last cut projection piece lower end is normally sharp-pointed; Above-mentioned following cut projection is following cut projection piece, and following cut projection piece upper end is normally sharp-pointed.In another concrete scheme, the above-mentioned cut projection that goes up is to go up the cut protuberant bar, and last cut protuberant bar extends along the throughput direction of sticking plaster, and last cut protuberant bar lower end is normally sharp-pointed; Above-mentioned following cut projection is following cut protuberant bar, and following cut protuberant bar extends along the throughput direction of sticking plaster, and following cut protuberant bar upper end is normally sharp-pointed.
When only needing at sticking plaster one end parcel cotton-wool, cut piece and cut piece once only need be set on one, cut piece and following cut piece position are corresponding with the end that sticking plaster need wrap up cotton-wool on this.When needs all wrap up cotton-wool at the sticking plaster two ends; Cut piece and twice cut pieces on two are set; The cut piece is corresponding one by one with twice cut pieces on two; Wherein a pair of upward the cut piece is corresponding with sticking plaster one end position with following cut piece position, and another is corresponding with sticking plaster other end position with following cut piece position to last cut piece.
In order to prevent that sticking plaster drops out from chain in the cut process; On frame, be provided with upper limit plate and lower limiting board; Gapped between upper limit plate and the lower limiting board, the height and position in this gap is corresponding with the groove on the chain, and the sticking plaster in the cut process on the chain passes through from this gap; The lower surface of upper limit plate and the upper surface of lower limiting board have limited moving of sticking plaster in the vertical direction jointly, and sticking plaster is in the groove on the chain all the time.Gap between upper limit plate and the lower limiting board is set according to the thickness of sticking plaster, and the width in this gap is slightly larger than the diameter of sticking plaster usually.
The utility model utilizes heater to last cut piece and following cut piece heating; Make impression piece and following impression piece reach sufficiently high temperature; When sticking plaster during, touch upside, the downside of sticking plaster end on last cut projection lower end and the following cut projection respectively, the partial melting of cut projections contact and form indenture under sticking plaster end and last cut projection reach through the gap between last cut piece and the following cut piece; Sticking plaster leaves cooling and shaping after the rod end cut mechanism; Thereby upside, downside in the sticking plaster end form stable indenture, and like this, the part cotton-wool of cotton-wool can embed in the indenture; Thereby cotton-wool can firmly be wrapped on the sticking plaster, prevent that cotton-wool from coming off from sticking plaster.The utility model is simple and compact for structure, can carry out cut, high efficiency to sticking plaster continuously.
Description of drawings
Fig. 1 is the structural representation of the utility model preferred embodiment;
Fig. 2 is the left view of rod end cut shown in Figure 1 mechanism when in running order.
The specific embodiment
As depicted in figs. 1 and 2; The rod end cut mechanism that this cotton swab is made machine comprises frame, goes up lift cylinder 2, goes up cut piece mount pad 1, goes up cut piece 3, lift cylinder 4, cut piece mount pad 5 and following cut piece 6 down down; The cylinder body 21 of last lift cylinder 2 and the cylinder body 41 of following lift cylinder 4 are installed on the frame; The piston rod 22 of last lift cylinder 2 is connected with last cut piece mount pad 1; Last cut piece 3 is installed on the cut piece mount pad 1, and the piston rod 42 of following lift cylinder 4 is connected with following cut piece mount pad 5, and following cut piece 6 is installed in down on the cut piece mount pad 5; Be equipped with heater on last cut piece 3 and the following cut piece 6; Last cut piece 3 is located at down cut piece 6 tops.
With reference to figure 2; In the present embodiment; Last cut piece mount pad 1 is provided with cut piece 3 on two, and it is corresponding one by one with twice cut pieces 6 that following cut piece mount pad 5 is provided with on twice cut pieces 6, two cut piece 3; It is wherein a pair of that upward cut piece 3 is corresponding with sticking plaster 7 one end positions with following cut piece 6 positions; Another is corresponding with sticking plaster 7 other end positions with following cut piece 6 positions to last cut piece 3, can process indenture at sticking plaster 7 both ends simultaneously, is fit to the situation that needs all wrap up cotton-wool at sticking plaster 7 two ends.Last cut piece 3 lower ends are provided with three and go up cut projection 8; Following cut piece 6 upper ends are provided with three following cut projections 9; Last cut projection 8 lower ends align with following cut projection 9 upper ends, and the distance between last cut projection 8 lower ends and following cut projection 9 upper ends is less than the diameter of sticking plaster 7; Last cut projection 8 is to go up the cut protuberant bar, and last cut protuberant bar extends along the throughput direction (being the direction of advance of chain 10) of sticking plaster 7, and last cut protuberant bar lower end is sharp-pointed; Following cut projection 9 is following cut protuberant bars, and following cut protuberant bar extends along the throughput direction of sticking plaster 7, and following cut protuberant bar upper end is sharp-pointed.
In the present embodiment, the heater on the last cut piece 3 is the heating of being located in the cut piece 3; Heater on the following cut piece 6 is the heating of being located at down in the cut piece 6.
Adopt chain 10 to carry sticking plaster 7 in the present embodiment; Chain 10 equal intervals are provided with a plurality of grooves 11 that can hold sticking plaster 7 (in the present embodiment; Groove 11 is made up of the left groove of being located at chain 10 left side carrier bars and the right groove of being located at chain 10 right side carrier bars; Left side groove is corresponding with right groove location, can hold a sticking plaster 7), sticking plaster 7 is in the groove 11 and is perpendicular with the direction of advance of chain 10.Frame is provided with upper limit plate 12 and lower limiting board 13; Gapped between upper limit plate 12 and the lower limiting board 13; The height and position in this gap is corresponding with the groove 11 on the chain 10; Sticking plaster 7 in the cut process on the chain 10 passes through from this gap, and the upper surface of the lower surface of upper limit plate 12 and lower limiting board 13 has limited moving of sticking plaster 7 in the vertical directions jointly, and sticking plaster 7 is in the groove 11 all the time.
Brief description is the operation principle of this rod end cut mechanism once:
The piston rod 22 of last lift cylinder 2 stretches out, and makes cut piece mount pad 1 and go up cut piece 3 together to descend, and simultaneously, the piston rod 42 of following lift cylinder 4 stretches out, and cut piece 6 together rises to make down cut piece mount pad 5 reach down, makes rod end cut mechanism in running order.Through the piston rod 22 of regulating lift cylinder 2, the stroke that descends the piston rod 42 of lift cylinder 4, can make the suitable distance of maintenance between cut projection 8 lower ends and following cut projection 9 upper ends.
Generate heat after the heating energized in the last cut piece 3, and, make impression piece 3 reach sufficiently high temperature last cut piece 3 heating; Generate heat after the heating energized in the following cut piece 6, and, make down impression piece 6 reach sufficiently high temperature cut piece 6 heating down.
Sticking plaster 7 advances under the drive of chain 10; When the gap between sticking plaster 7 last cut pieces 3 of process and the following cut piece 6; Last cut projection 8 lower ends and following cut projection 9 upper ends touch upside, the downside of sticking plaster 7 ends respectively; The partial melting that sticking plaster 7 ends contact with last cut projection 8 and following cut projection 9 also forms indenture, and sticking plaster 7 leaves cooling and shaping after the rod end cut mechanism, thereby forms stable indenture at upside, the downside of sticking plaster 7 ends.
During shutdown; Piston rod 22 retractions of last lift cylinder 2; Cut piece 3 together rises to make cut piece mount pad 1 reach upward, simultaneously, and piston rod 42 retractions of following lift cylinder 4; Cut piece 6 together descends to make down cut piece mount pad 5 reach down, so that the staff cleans with following cut projection 9 last cut projection 8.
In other embodiments, when only needing at sticking plaster one end parcel cotton-wool, cut piece and cut piece once only need be set on one, cut piece and following cut piece position are corresponding with the end that sticking plaster need wrap up cotton-wool on this.
In other embodiments; In order to make cut piece mount pad and to go up the cut piece and go up and down more steady; The upper rail of trend up and down can be set on frame; Last cut piece mount pad and upper rail are slidingly matched, and the piston rod of last lift cylinder can drive cut piece mount pad and go up the cut piece and together go up and down along upper rail; The cut piece goes up and down more steady in order to make down cut piece mount pad reach down; The lower guideway of trend up and down can be set on frame; Following cut piece mount pad and lower guideway are slidingly matched, and the piston rod of following lift cylinder can drive down cut piece mount pad and following cut piece together goes up and down along lower guideway.
In other embodiments, the heater on the last cut piece also can be the conduction oil passage of being located in the cut piece, through in this conduction oil passage, feeding the conduction oil that flows, to last cut piece heating; Heater on the following cut piece also can be the conduction oil passage of being located at down in the cut piece, through in this conduction oil passage, feeding the conduction oil that flows, to cut piece heating down.
In other embodiments, the heater on the last cut piece also can be the heating that contacts with last cut piece outer surface, generate heat after this heating energized, and to last cut piece heating; Heater on the following cut piece also can be the heating that contacts with following cut piece outer surface, generates heat after this heating energized, and to cut piece heating down.
In other embodiments, last cut projection also can be to go up cut projection piece, and last cut projection piece lower end is normally sharp-pointed; Following cut projection also can be following cut projection piece, and following cut projection piece upper end is normally sharp-pointed.

Claims (1)

1. a cotton swab is made the rod end cut mechanism of machine; It is characterized in that comprising frame, go up lift cylinder, go up cut piece mount pad, go up the cut piece, lift cylinder, cut piece mount pad and following cut piece down down; The cylinder body of the cylinder body of last lift cylinder and following lift cylinder is installed on the frame; The piston rod of last lift cylinder is connected with last cut piece mount pad; Last cut piece is installed on the cut piece mount pad, and the piston rod of following lift cylinder is connected with following cut piece mount pad, and following cut piece is installed in down on the cut piece mount pad; Be equipped with heater on last cut piece and the following cut piece; Last cut piece is located at down cut piece top, and last cut piece lower end is provided with cut projection at least one, and following cut piece upper end is provided with at least one cut projection down.
CN201120569509XU 2011-12-29 2011-12-29 Rod end scratching mechanism for cotton swab manufacturing machine Expired - Lifetime CN202399516U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120569509XU CN202399516U (en) 2011-12-29 2011-12-29 Rod end scratching mechanism for cotton swab manufacturing machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120569509XU CN202399516U (en) 2011-12-29 2011-12-29 Rod end scratching mechanism for cotton swab manufacturing machine

Publications (1)

Publication Number Publication Date
CN202399516U true CN202399516U (en) 2012-08-29

Family

ID=46697190

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120569509XU Expired - Lifetime CN202399516U (en) 2011-12-29 2011-12-29 Rod end scratching mechanism for cotton swab manufacturing machine

Country Status (1)

Country Link
CN (1) CN202399516U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114654751A (en) * 2022-03-25 2022-06-24 何泽盛 Cotton swab former of anticreep is cotton

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114654751A (en) * 2022-03-25 2022-06-24 何泽盛 Cotton swab former of anticreep is cotton

Similar Documents

Publication Publication Date Title
CN102166679B (en) Soldering lamp and soldering method for solar cell
CN205130586U (en) Web press is counterpointed and is met paper storage device
CN102756597A (en) Sheet material graining machine with gap adjusting mechanism
CN202399516U (en) Rod end scratching mechanism for cotton swab manufacturing machine
CN202367109U (en) Device for bending LED (Light Emitting Diode) lamp pin
CN209064431U (en) A kind of aluminum profile film pasting mechanism
CN203699533U (en) Elastic material automatic typesetting and forming machine
CN207273447U (en) A kind of bamboo frame rapid forming equipment
CN208881157U (en) A kind of plate moulding shaping tooling
CN208787358U (en) A kind of panel computer shell stainless steel pressing and bending shaping mould
CN206011806U (en) Periphery material hold down gag in a kind of carpet class cold moudling
CN208801709U (en) A kind of hot-press arrangement being used to prepare certain thickness adhesive film
CN205470077U (en) Capsule plastic -aluminum packagine machine's forming device
CN204845079U (en) Hydraulic pressure type press mold machine
CN103042718A (en) Common jig base
CN203093096U (en) Public jig base
CN107498663A (en) A kind of bamboo frame rapid forming equipment
CN203332636U (en) Movable type spinning cake support
CN104282447B (en) Capacitor winding core flatting mill
CN201737835U (en) Novel heating device for automatic forming machine of spiral energy-saving lamp
CN202291207U (en) Riveting machine for clamping shell of transformer
CN207629942U (en) A kind of semiconductor laser feeding mould item and shrapnel one mounting tool
CN201620105U (en) Cross rod span adjusting mechanism of glass slide frame
CN201423683Y (en) Edge heating device for heating edge of movable band steel used for edge cutting machine unit
CN202805633U (en) Self-regulating fabric clamping frame device of hot press mould

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20120829

CX01 Expiry of patent term