CN202395378U CN2011204646791U CN201120464679U CN202395378U CN 202395378 U CN202395378 U CN 202395378U CN 2011204646791 U CN2011204646791 U CN 2011204646791U CN 201120464679 U CN201120464679 U CN 201120464679U CN 202395378 U CN202395378 U CN 202395378U
Authority
CN
China
Prior art keywords
tool
cable
stringing
cabinet body
placing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2011204646791U
Other languages
Chinese (zh)
Inventor
潘奡旻
蔡恒
吴杰
闵继威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiaxing Electric Power Bureau
Original Assignee
Jiaxing Electric Power Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaxing Electric Power Bureau filed Critical Jiaxing Electric Power Bureau
Priority to CN2011204646791U priority Critical patent/CN202395378U/en
Application granted granted Critical
Publication of CN202395378U publication Critical patent/CN202395378U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Details Of Indoor Wiring (AREA)

Abstract

The utility model provides a container dedicated for power distribution network bypass working. The container comprises a framed cabinet body, wherein the framed cabinet body is formed by shape steel in mode of welding; at least a plurality of T-branching bracket platforms, stringing tool brackets, surplus cable tool shelf brackets, a tool placing shelf, a cable support rope and a cable connecting rope placing shelf are arranged inside the cabinet; at least one row of surplus cable tool shelf brackets are arranged at one side of the top of the framed cabinet body; a plurality of T-branching bracket platforms and stringing tool brackets are arranged at the adjacent row; the tool placing shelf is arranged at the middle part of the framed cabinet body; at least a direct connection joint placing disc, a stringing tool wrench disc and a stringing tool main body disc are arranged on the tool placing shelf; a placing shelf on which the cable support rope is placed is arranged at one side at the lower part of the framed cabinet body; and the placing shelf on which the cable connecting rope is placed is arranged at the other side of the framed cabinet body. The container has the advantages that the structure is simple, the use is convenient, not only can the transporting time during the work saved, but also collision of devices is avoided, and the working field is in order, etc.

Description

The special-purpose counter that power matching network bypass operation is used
Technical field
The utility model relates to a kind of special-purpose counter that power matching network bypass operation is used that is exclusively used in, especially be exclusively used in the special-purpose counter that bypass cable and specific purpose tool are put fixation.
Background technology
The bypass operation is the live line working project of a complicacy, and the main problem that exists is that bypass cable and auxiliary device are many, in the work handling process, as there not being putting of specific purpose tool case, is easy to cause the wearing and tearing of cable.Deposit with handling process in as not fixation put, be easy to cause confusion.So the FIXED MANAGEMENT in warehouse is very important, rationally arrange existence conditions to carry out the reasonable distribution space, accomplish scientific standardization, operating efficiency is improved.
Auxiliary device quantity is many in the bypass operation, adds that special-purpose unwrapping wire shelf in handling process, can collide bypass cable unavoidably, brings beyond thought damage to equipment.
Summary of the invention
The purpose of the utility model is to overcome the deficiency that prior art exists; And provide a kind of simple in structure, and easy to use, the handling time in can not only saving work; And can not cause the collision of equipment, the special-purpose counter that operation field can power matching network bypass operation in good order be used.
The purpose of the utility model is accomplished through following technical scheme; It comprises the frame cabinet that is welded with shaped steel, in cabinet, is provided with a plurality of T at least and divides the pallet of drawing, stringing tool holder, surplus cable tool shelf support, instrument rest stand, cable support rope and cable connection cord rack.
Described frame cabinet top one side is provided with at least one exhaust cable tool shelf support, and adjacent row's setting is respectively arranged with a plurality of T and divides draw pallet and stringing tool holder.
The centre of described frame cabinet is provided with an instrument rest stand, is provided with straight coupling holding tray (frame), stringing tool wrench dish (frame) and stringing tool body dish (frame) on this instrument rest stand at least.
Bottom one side of described frame cabinet is provided with the rack of placing the cable support rope, and opposite side is provided with the rack of placing the cable connection cord.
The utlity model has simple in structure, easy to use, the handling time in can not only saving work, and can not cause the collision of equipment, operation field can be in good order etc. characteristics.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Fig. 2 is that the A of Fig. 1 is to structural representation.
Fig. 3 is that the B of Fig. 1 is to structural representation.
Embodiment
To combine below accompanying drawing to the utility model make detailed introduction: Fig. 1,2, shown in 3; The utility model comprises the frame cabinet 2 that is welded with shaped steel 1, in cabinet 2, is provided with a plurality of T at least and divides the pallet 3 of drawing, stringing tool holder 4, surplus cable tool shelf support 5, instrument rest stand 6, cable support rope and cable connection cord rack 7,8.
Shown in the figure, described frame cabinet 2 tops one side is provided with at least one exhaust cable tool shelf support 5, and adjacent row's setting is respectively arranged with a plurality of T and divides draw pallet 3 and stringing tool holder 4.
The centre of described frame cabinet 2 is provided with an instrument rest stand 6; At least be provided with straight coupling holding tray (frame) 61, stringing tool wrench dish (frame) 62 and stringing tool body dish (frame) 63 on this instrument rest stand 6, be respectively applied for and place straight coupling, stringing tool wrench and stringing tool body.
Bottom one side of described frame cabinet 2 is provided with the rack 7 of placing the cable support rope, is used to place the cable support rope, and opposite side is provided with the rack 8 of placing the cable connection cord, is used to place the cable connection cord.
The utility model is all put fixation in the counter of special use with bypass cable and specific purpose tool, the handling time in the saving work not only, and can not cause the grazing of equipment, operation field also can be in good order.
Through fixation and improvement, mainly be to improve working efficiency and the input of saving equipment funds to bypass cable unwrapping wire equipment.At first, the preliminary preparation of teams and groups, put with round-off work and will shorten to the exhibition of operation field equipment; Next is that the Work tool situation is had comprehensive understanding, and the maintenance management of bypass implement is all had very big lifting.

Claims (4)

1. special-purpose counter that power matching network bypass operation is used; It comprises the frame cabinet that is welded with shaped steel, it is characterized in that in cabinet, being provided with at least a plurality of T and divides the pallet of drawing, stringing tool holder, surplus cable tool shelf support, instrument rest stand, cable support rope and cable connection cord rack.
2. the special-purpose counter that power matching network bypass operation according to claim 1 is used; It is characterized in that described frame cabinet top one side is provided with at least one exhaust cable tool shelf support, adjacent row's setting is respectively arranged with a plurality of T and divides draw pallet and stringing tool holder.
3. the special-purpose counter that power matching network bypass operation according to claim 2 is used; The centre that it is characterized in that described frame cabinet is provided with an instrument rest stand, is provided with straight coupling rack, stringing tool wrench frame and stringing tool body frame on this instrument rest stand at least.
4. the special-purpose counter of using according to claim 1 or 2 or 3 described power matching network bypass operations is characterized in that bottom one side of described frame cabinet is provided with the rack of placing the cable support rope, and opposite side is provided with the rack of placing the cable connection cord.
CN2011204646791U 2011-11-22 2011-11-22 Container dedicated for power distribution network bypass working Withdrawn - After Issue CN202395378U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204646791U CN202395378U (en) 2011-11-22 2011-11-22 Container dedicated for power distribution network bypass working

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204646791U CN202395378U (en) 2011-11-22 2011-11-22 Container dedicated for power distribution network bypass working

Publications (1)

Publication Number Publication Date
CN202395378U true CN202395378U (en) 2012-08-22

Family

ID=46670280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204646791U Withdrawn - After Issue CN202395378U (en) 2011-11-22 2011-11-22 Container dedicated for power distribution network bypass working

Country Status (1)

Country Link
CN (1) CN202395378U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102522714A (en) * 2011-11-22 2012-06-27 嘉兴电力局 Special counter used for electric power network distribution bypass operation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102522714A (en) * 2011-11-22 2012-06-27 嘉兴电力局 Special counter used for electric power network distribution bypass operation
CN102522714B (en) * 2011-11-22 2014-06-04 嘉兴电力局 Special counter used for electric power network distribution bypass operation

Similar Documents

Publication Publication Date Title
CN202395378U (en) Container dedicated for power distribution network bypass working
CN203698848U (en) Oxygen tank tooling
CN102522714B (en) Special counter used for electric power network distribution bypass operation
CN203698952U (en) Oxygen tank tooling device
CN203698847U (en) Oxygen tank tooling
CN202964622U (en) Tool shelf
CN202924576U (en) Lifting tool for totally enclosed bus conductor
CN102295247A (en) Erector hoist
CN210189705U (en) Overhauling and assembling workbench
CN205125725U (en) High strength plywood for goods shelves
CN203650470U (en) Distribution box workbench
CN202353158U (en) Cable rack used for electric power distribution network bypass operation
CN202728274U (en) Multifunctional test car for maintaining relaying protection device
CN210416782U (en) Train type edible mushroom bag cleaning vehicle
CN201294362Y (en) Device for supporting cable joint of large cross section cable tunnel
CN103708107A (en) Oxygen tank tool
CN103708106A (en) Oxygen tank tool
CN202564867U (en) Multifunctional rack for preassembling and assembling automobile wire harness
CN211729059U (en) Turnover workbench for display frame
CN202317536U (en) Welding tool for sweeping board hook of multi-story parking equipment
CN212980218U (en) Logistics information management device
CN201891396U (en) Drill rod containing bracket
CN203021261U (en) Non-pallet fruit basket assembling and disassembling accessory
CN104842332B (en) A kind of mould placing rack
CN201703994U (en) Crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20120822

Effective date of abandoning: 20140604

RGAV Abandon patent right to avoid regrant