CN202377293U - Die structure for manufacturing dual-alloy composite aluminium pipe by forward extruder - Google Patents

Die structure for manufacturing dual-alloy composite aluminium pipe by forward extruder Download PDF

Info

Publication number
CN202377293U
CN202377293U CN2011205520305U CN201120552030U CN202377293U CN 202377293 U CN202377293 U CN 202377293U CN 2011205520305 U CN2011205520305 U CN 2011205520305U CN 201120552030 U CN201120552030 U CN 201120552030U CN 202377293 U CN202377293 U CN 202377293U
Authority
CN
China
Prior art keywords
alloy
die
aluminum pipe
utility
gold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205520305U
Other languages
Chinese (zh)
Inventor
严荣庆
郑晓军
王建营
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANGZHOU RISE-AL COMPOSITE METAL MATERIAL CO., LTD.
Original Assignee
JIANGSU ZHENXING ALUMINUM CO Ltd
XINSHI ALUMINUM (SHANGHAI) CO Ltd
SHANGHAI RUISILE COMPOSITE METAL MATERIALS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ZHENXING ALUMINUM CO Ltd, XINSHI ALUMINUM (SHANGHAI) CO Ltd, SHANGHAI RUISILE COMPOSITE METAL MATERIALS CO Ltd filed Critical JIANGSU ZHENXING ALUMINUM CO Ltd
Priority to CN2011205520305U priority Critical patent/CN202377293U/en
Application granted granted Critical
Publication of CN202377293U publication Critical patent/CN202377293U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a die structure for manufacturing a dual-alloy composite aluminium pipe by a forward extruder, which comprises a lower die, an outer layer die and a core part die. The outer layer die is arranged between the lower die and the core part die; the core part die is used for extruding and forming an inner alloy layer of the dual-alloy composite aluminium pipe by a hole; and the outer layer die is used for extruding and forming an outer alloy layer of the dual-alloy composite aluminium pipe by a hole. According to the utility model, the repeated intermediate annealing of a conventional rolling and high frequency welding method and the high frequency welding of a welded tube are not adopted, so that the production cost can be greatly reduced.

Description

The forward extrusion machine is made the mould structure of the compound aluminum pipe of pairing gold
Technical field
The utility model relates to a kind of mould structure, and particularly a kind of forward extrusion machine is made the mould structure of the compound aluminum pipe of pairing gold.
Background technology
Along with air conditioner refrigerating development of technology and development; The extensive use of the soldering tech of especially full aluminium micro-channel condenser and evaporimeter; Cause also increasing as the demand of the pairing of the header compound aluminum pipe of gold (as shown in Figure 1); The compound aluminum pipe processing method of the pairing of comparative maturity gold is earlier two kinds of different aluminium alloys (first aluminium alloy 1 and second aluminium alloy 2) to be combined into two alloy plate strips with rolling method at present, is curled into pipe then and adopts the method for high-frequency welding to be made into pairing gold (3 Al alloy 3 and the 4th aluminium alloy 4) compound aluminum pipe (as shown in Figure 2).Adopt the pairing gold clad aluminum pipe of this method manufacturing to have all even stay-in-grade advantage of composite bed thickness; But, because processing capacity is big, need carry out repeatedly intermediate annealing during especially rolling pair of alloy plate strip because process route is long; So production cost is higher; Add the weld defect that exists high-frequency welding to have often,, thereby also have the low defective of soldering yield rate like pore, slag inclusion or the like.
Also has a kind of processing method that adopts indirect extrusion machine to make the compound aluminum pipe of pairing gold at present; This method is to connect together after the hollow ingot casting turning processing with two kinds of aluminium alloys; In indirect extrusion machine, carry out hot extrusion processing then, directly be made into the seamless compound aluminum pipe of pairing gold through special mould structure.This method need not be rolled the repeatedly intermediate annealing of method because process route is short, need not carry out high-frequency welding yet, so production efficiency is high, cost is relatively low.But because two kinds of aluminium alloys that connect together exist the difference of aspects such as hardness and non-deformability and metal flow also to have nothing in common with each other in each different phase of extruding; Therefore this method exists the serious uneven defective of alloy layer thickness; This brings very big problem for the condenser soldering in road, back; Can cause leakage like the composite bed deficiency, then can stop up concurrent flow pore etc. because of the scolder trickling again as composite bed is blocked up.The complicacy because two kinds of alloy raw material plumbers of this method plant, and needs in addition adopts rare indirect extrusion machine production, so its manufacturing cost is comparatively speaking still than higher.
The utility model content
The utility model technical problem to be solved provides the mould structure that a kind of forward extrusion machine is made the compound aluminum pipe of pairing gold, and it can simplify production technology, and reduces production costs significantly.
For solveing the technical problem; The utility model provides a kind of forward extrusion machine to make the mould structure of the compound aluminum pipe of pairing gold; It is characterized in that it comprises counterdie, outer mould, core mold, outer mould is located between counterdie and the core mold; Core mold is passed through the outer alloy-layer of the compound aluminum pipe of type hole extrusion modling pairing gold through the interior alloy-layer of the compound aluminum pipe of type hole extrusion modling pairing gold in the outer mould.
The positive progressive effect of the utility model is: the utility model does not have the conventional rolling rolling multiple tracks intermediate annealing of high frequency welding and the high-frequency welding of welded tube of adding that adopt; Need not adopt the complicated production technology of two kinds of alloy cast tubes of socket of reverse extrusion yet, thereby can reduce production costs significantly.
Description of drawings
Fig. 1 is the structural representation of the compound aluminum pipe of pairing gold.
Fig. 2 is the existing rolling structural representation that the high frequency welding is produced the compound aluminum pipe of pairing gold that adds.
Fig. 3 is the structural representation of the utility model configuration alloy aluminium bar.
Fig. 4 is the structural representation that the utility model forward extrusion machine is made the compound aluminum pipe of pairing gold.
Fig. 5 is the cutaway view along the A-A direction of Fig. 4.
The specific embodiment
Lift a preferred embodiment below, and combine accompanying drawing to come the clearer the utility model of intactly explaining.
The utility model at first is an aluminium alloy round cast ingot of the proportioning proportion requirement of two kinds of aluminium alloys being designed two kinds of suitable sizes according to the compound aluminum pipe of pairing gold; For example; If pentahapto is golden: six directions gold=1: 10; Then the diameter of six directions gold aluminium bar roughly should be 3.16 times of diameter of pentahapto gold aluminium bar, is 229mm like the diameter of six directions gold aluminium bar, and then the diameter of pentahapto gold aluminium bar should be 72mm.For present embodiment; Pentahapto gold aluminium bar 5 that press should be 72mm by diameter of structure configuration as shown in Figure 3 and the six directions gold aluminium bar 6 of a 229mm; Corresponding with it, ingot-containing tube is also by the structure configuration like figure, and the general configuration of mould such as Fig. 4 and shown in Figure 5.The mould structure that the utility model forward extrusion machine is made the compound aluminum pipe of pairing gold comprises counterdie 7, outer mould 8, core mold 9, the 5th alloy material hole 10, the 6th alloy material hole 11; Outer mould 8 is located between counterdie 7 and the core mold 9; Core mold is passed through the outer alloy-layer of the compound aluminum pipe of type hole extrusion modling pairing gold through the interior alloy-layer of the compound aluminum pipe of type hole extrusion modling pairing gold in the outer mould.Add the man-hour mold temperature and be generally about 480 ℃, the aluminium bar temperature is generally about 500 ℃, and the ingot-containing tube temperature is generally about 400 ℃.Two aluminium bars that heat place in the ingot-containing tube; Two alloy aluminium bars apply specified extruding force from the rear portion to aluminium bar; The interior alloy-layer 13 of core is at first shunted seam again through core mold and is formed the inner alloy pipe; Peripheral simultaneously outer alloy-layer 12 converges through in established, managing the top layer behind the outer mould water conservancy diversion; Under the high-temperature and high-pressure conditions in mould, inside and outside two-layer different aluminium alloy be compressed in together with the form of metallurgical bonding interface, thereby form the compound aluminum pipe of needed pairing gold.The compound aluminum pipe of this pairing gold draws through suitable back road, can obtain the compound aluminum pipe of pairing gold of required size.
The utility model has the advantages that: flow owing to the alloy of various piece all is limited to be extruded in the die cavity separately; Therefore the ectonexine alloy proportion of the compound aluminum pipe of its formed pairing gold is accurately controlled; Two kinds of alloy disorder fluxion straps come the thin uneven problems of compound bed thickness when having avoided aforementioned reverse extrusion to make the compound aluminum pipe of pairing gold, so constant product quality.Because large tonnage forward extrusion machine is more common, investment of devices is also relatively easy with transformation in addition, so the utility model is convenient to promote very much.Make the compound aluminum pipe of pairing gold through the utility model, because technological process is short, the no rolling multiple tracks intermediate annealing and the high-frequency welding of welded tube, so production cost is also lower.
Though more than described the specific embodiment of the utility model; But those skilled in the art is to be understood that; These only illustrate, and under the prerequisite of principle that does not deviate from the utility model and essence, can make numerous variations or modification to these embodiments.Therefore, the protection domain of the utility model is limited appended claims.

Claims (1)

1. a forward extrusion machine is made the mould structure of the compound aluminum pipe of pairing gold; It is characterized in that; It comprises counterdie, outer mould, core mold; Outer mould is located between counterdie and the core mold, and core mold is passed through the outer alloy-layer of the compound aluminum pipe of type hole extrusion modling pairing gold through the interior alloy-layer of the compound aluminum pipe of type hole extrusion modling pairing gold in the outer mould.
CN2011205520305U 2011-12-26 2011-12-26 Die structure for manufacturing dual-alloy composite aluminium pipe by forward extruder Expired - Fee Related CN202377293U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205520305U CN202377293U (en) 2011-12-26 2011-12-26 Die structure for manufacturing dual-alloy composite aluminium pipe by forward extruder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205520305U CN202377293U (en) 2011-12-26 2011-12-26 Die structure for manufacturing dual-alloy composite aluminium pipe by forward extruder

Publications (1)

Publication Number Publication Date
CN202377293U true CN202377293U (en) 2012-08-15

Family

ID=46625813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205520305U Expired - Fee Related CN202377293U (en) 2011-12-26 2011-12-26 Die structure for manufacturing dual-alloy composite aluminium pipe by forward extruder

Country Status (1)

Country Link
CN (1) CN202377293U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102527764A (en) * 2011-12-26 2012-07-04 上海瑞斯乐复合金属材料有限公司 Die structure for manufacturing dual-alloy compound aluminum tube by forward extruder

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102527764A (en) * 2011-12-26 2012-07-04 上海瑞斯乐复合金属材料有限公司 Die structure for manufacturing dual-alloy compound aluminum tube by forward extruder

Similar Documents

Publication Publication Date Title
CN102154599B (en) Short-flow high-efficiency production method for white brass alloy pipes
CN102226486B (en) CuAl bimetallic composite pipe and die extrusion molding method thereof
CN101704055B (en) Hot pressing forming mould and hot pressing forming method of super long branch pipe three-way pipe fitting
CN105499304A (en) Semi-solid forming method of composite pipe
CN101579703A (en) New technique for manufacturing high alloy steel seamless pipe with heavy calibre by adopting pilger mill
CN104668305A (en) Method for molding dual-layer alloy-steel pipe
CN103982711A (en) Corrosion-resisting aluminum alloy composite pipe and processing method thereof
CN202377293U (en) Die structure for manufacturing dual-alloy composite aluminium pipe by forward extruder
CN103978060A (en) Dual-layer metal composite pipe semi-solid inverted extrusion molding die and applications thereof
CN102441585A (en) Preparation method of aluminium alloy composite pipe
CN101716616B (en) Method for producing seamless steel tube by combination of drawing and expanding and device thereof
CN103143622A (en) Medium forming method for improving forming property of thick-wall metal pipe fittings
CN202984317U (en) Seamless steel pipe integral forming die
CN202411356U (en) Device for casting aluminum alloy composite round ingot blanks
CN102527764A (en) Die structure for manufacturing dual-alloy compound aluminum tube by forward extruder
CN102172660A (en) Once-extrusion molding process of copper/aluminum composite section for radiator and device thereof
CN102009090A (en) Reforming mould during extrusion molding of bent pipe
CN106623488B (en) A kind of processing method of rectangle diplopore silver-bearing copper pipe
CN101633115A (en) Novel method for producing high-grade alloy steel seamless steel tube
CN203817082U (en) Semi-solid backward extrusion forming mold for double-layer metal composite pipe
CN103447770A (en) Method for manufacturing pipe clamp, pipe clamp and pipeline
CN103386585A (en) Shell platform or tube platform forming technology and backward extruding die used by same
CN102489535A (en) Method for preparing and processing cupronickel capillary with high efficiency
CN110202018A (en) A kind of dissimilar metal multi-layered composite pipe preparation facilities and method
CN202015747U (en) Segment die for automatic cold drawing machine for non-ferrous metal tubes

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGSU ZHENXING ALUMINUM CO., LTD. XINSHI ALUMINU

Free format text: FORMER OWNER: JIANGSU ZHENXING ALUMINUM CO., LTD. XINSHI ALUMINUM (SHANGHAI) CO., LTD.

Effective date: 20140729

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140729

Address after: 201611 Shanghai Songjiang District Chedun Town Xin Lang Road No. 155 -3

Patentee after: Shanghai Ruisile Composite Metal Materials Co., Ltd.

Patentee after: Jiangsu Zhenxing Aluminum Co.,Ltd.

Patentee after: Xinshi Aluminum (Shanghai) Co., Ltd.

Patentee after: YANGZHOU RISE-AL COMPOSITE METAL MATERIAL CO., LTD.

Address before: 201611 Shanghai Songjiang District Chedun Town Xin Lang Road No. 155 -3

Patentee before: Shanghai Ruisile Composite Metal Materials Co., Ltd.

Patentee before: Jiangsu Zhenxing Aluminum Co.,Ltd.

Patentee before: Xinshi Aluminum (Shanghai) Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120815

Termination date: 20191226