CN202373906U - 一种用于跨越带电线路的施工跨越装置 - Google Patents

一种用于跨越带电线路的施工跨越装置 Download PDF

Info

Publication number
CN202373906U
CN202373906U CN2011205362918U CN201120536291U CN202373906U CN 202373906 U CN202373906 U CN 202373906U CN 2011205362918 U CN2011205362918 U CN 2011205362918U CN 201120536291 U CN201120536291 U CN 201120536291U CN 202373906 U CN202373906 U CN 202373906U
Authority
CN
China
Prior art keywords
insulation
line
spanning
construction
support level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011205362918U
Other languages
English (en)
Inventor
王友国
邢文圣
盖鹏宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Binzhou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Binzhou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Binzhou Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Binzhou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN2011205362918U priority Critical patent/CN202373906U/zh
Application granted granted Critical
Publication of CN202373906U publication Critical patent/CN202373906U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Emergency Protection Circuit Devices (AREA)

Abstract

本实用新型提供了一种用于跨越带电线路的施工跨越装置的技术方案,该方案的装置,包括带有横担的杆塔,还有用于跨越横担的绝缘支撑线,所述的绝缘支撑线带有绝缘引导线,在绝缘支撑线下方设置有绝缘遮拦,绝缘遮拦的一端有导向线,绝缘遮拦的另一端有固定线。该方案的跨越装置,可以在不停电的情况下施工,并且结构简单,操作方便。

Description

一种用于跨越带电线路的施工跨越装置
技术领域
本实用新型涉及的是一种电力施工装置,尤其是一种用于跨越带电线路的施工跨越装置。 
背景技术
在现有技术中,公知的技术是随着电力的发展,线路施工越来越多,很多线路施工需要跨越带电的线路。停电申请受理困难,制约了施工进度,影响人们使用。这是现有技术所存在的不足之处。 
发明内容
本实用新型的目的,就是针对现有技术所存在的不足,而提供一种用于跨越带电线路的施工跨越装置的技术方案,该方案的跨越装置,可以在不停电的情况下施工,并且结构简单,操作方便。
本方案是通过如下技术措施来实现的:一种用于跨越带电线路的施工跨越装置,包括带有横担的杆塔,本方案的特点是:还有用于跨越横担的绝缘支撑线,所述的绝缘支撑线带有绝缘引导线,在绝缘支撑线下方设置有绝缘遮拦,绝缘遮拦的一端有导向线,绝缘遮拦的另一端有固定线。所述的绝缘支撑线为两根。
本方案的有益效果可根据对上述方案的叙述得知,由于在该方案中可以有带有横担的杆塔,可以支撑绝缘支撑线;绝缘支撑线下方设置有绝缘遮拦,可以有效的阻隔带电线与施工导线,避免了短路。由此可见,本实用新型与现有技术相比,具有实质性特点和进步,其实施的有益效果也是显而易见的。
附图说明
图1为本实用新型具体实施方式的结构示意图。
图中,1为杆塔,2为横担,3为绝缘支撑线,4为绝缘引导线,5为绝缘遮拦,6为导向线,7为固定线,8为地钻。
具体实施方式
为能清楚说明本方案的技术特点,下面通过一个具体实施方式,并结合其附图,对本方案进行阐述。
通过附图可以看出,本方案的用于跨越带电线路的施工跨越装置,包括带有横担2的杆塔1,还有用于跨越横担2的绝缘支撑线3,所述的绝缘支撑线3带有绝缘引导线4,在绝缘支撑线3下方设置有绝缘遮拦5,绝缘遮拦5的一端有导向线6,绝缘遮拦5的另一端有固定线7。所述的绝缘支撑线3为两根。使用时,杆塔1可以直接使用架设线路的杆塔1,通过绝缘引导线4可以将绝缘支撑线3拉起,跨越带电的导线,然后通过地钻8固定,此时,拉动导向线6,带动绝缘遮拦5运动,当绝缘遮拦5到达带电导线上方时,停止拉动,并且将导向6线和固定线7都固定在地钻上,这样绝缘遮拦5的位置就固定了,就避免了要架设的电线与带电导线接触,避免短路。

Claims (2)

1.一种用于跨越带电线路的施工跨越装置,包括带有横担的杆塔,其特征是:还有用于跨越横担的绝缘支撑线,所述的绝缘支撑线带有绝缘引导线,在绝缘支撑线下方设置有绝缘遮拦,绝缘遮拦的一端有导向线,绝缘遮拦的另一端有固定线。
2.根据权利要求1所述的用于跨越带电线路的施工跨越装置,其特征是:所述的绝缘支撑线为两根。
CN2011205362918U 2011-12-20 2011-12-20 一种用于跨越带电线路的施工跨越装置 Expired - Lifetime CN202373906U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205362918U CN202373906U (zh) 2011-12-20 2011-12-20 一种用于跨越带电线路的施工跨越装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205362918U CN202373906U (zh) 2011-12-20 2011-12-20 一种用于跨越带电线路的施工跨越装置

Publications (1)

Publication Number Publication Date
CN202373906U true CN202373906U (zh) 2012-08-08

Family

ID=46597597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205362918U Expired - Lifetime CN202373906U (zh) 2011-12-20 2011-12-20 一种用于跨越带电线路的施工跨越装置

Country Status (1)

Country Link
CN (1) CN202373906U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106025923A (zh) * 2016-07-05 2016-10-12 绍兴市大兴电气承装有限公司 一种张力式电力线路保护网的施工方法
CN106451228A (zh) * 2016-07-01 2017-02-22 浙江浙电经济技术研究院 一种用于输电线路不停电架线的剪刀式自展跨越系统
CN107437766A (zh) * 2017-03-08 2017-12-05 晋江市东坤电子实业有限公司 一种电力抢修用的撑线装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106451228A (zh) * 2016-07-01 2017-02-22 浙江浙电经济技术研究院 一种用于输电线路不停电架线的剪刀式自展跨越系统
CN106025923A (zh) * 2016-07-05 2016-10-12 绍兴市大兴电气承装有限公司 一种张力式电力线路保护网的施工方法
CN107437766A (zh) * 2017-03-08 2017-12-05 晋江市东坤电子实业有限公司 一种电力抢修用的撑线装置

Similar Documents

Publication Publication Date Title
CN202373906U (zh) 一种用于跨越带电线路的施工跨越装置
CN103046791A (zh) 一种采用双回路电缆t接引下的输电线路直线塔
CN201904593U (zh) 一种两分裂预绞式间隔棒
CN202632574U (zh) 一种配电线路带电作业地面实训装置
CN202073353U (zh) 单回路钻跨式钢管杆
CN203412353U (zh) 一种取消绝缘子串的输电线路复合耐张杆塔
CN201502207U (zh) 架空线路高压塔杆
CN202677921U (zh) 一种电缆线及双芯结构
CN201576916U (zh) 输电线路防鸟装置
CN105155916A (zh) 一种单回路正逆相序变换角钢塔
CN205046907U (zh) 双回路开断四回电缆引下塔
CN201857793U (zh) 带有驱鸟器的铁塔
CN201765868U (zh) 弹性导线
CN203179361U (zh) 一种配电线路终端杆地面培训装置
CN204126354U (zh) 一种高压输电塔
CN203932932U (zh) 一种耐雷输电杆塔
CN202662362U (zh) 一种抗拉性电线
CN203932929U (zh) 一种电杆上水平防坠导轨的安装装置
CN202840449U (zh) 杆塔分流拉线及铜接地结构
CN201549830U (zh) 一种带电作业专用扎线器
CN203924856U (zh) 一种1000kV/500kV耐张钢管塔
CN203262124U (zh) 一种驱鸟装置
CN202954611U (zh) 一种采用双回路电缆t接引下的输电线路直线塔
CN203369303U (zh) 一种输电线路用引鸟架
CN202337941U (zh) 预应力混凝土用钢绞线放线时的固定装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120808