Material loading rubbish from cooking case before a kind of
Technical field
The utility model relates to a kind of rubbish container, particularly a kind of preceding material loading rubbish from cooking case.
Background technology
In the prior art; The casing upper front end of preceding material loading rubbish from cooking case is provided with the rubbish pour spout; The both sides of rubbish pour spout are provided with breast board; The upper end of rubbish pour spout is provided with able to turn on or off top cover, and the root of top cover is hinged on the rear end of rubbish pour spout, and sewage disposer clamping bont is installed on the front end face of casing.The structure of sewage disposer clamping bont and operating principle such as publication number are described in the Chinese invention patent application of CN101972762A.Place the sewage disposer bung on the turning rack up; The cylinder rod of folder bucket cylinder stretches out; The push rod groove that promotes push rod frame along the turning rack both sides moves up; Movable stand moves up thereupon, and the mobile chuck on movable stand withstands on the lower edge of sewage disposer bung flange, and this moment, this side bung flange of sewage disposer was sandwiched between the fixed chuck of mobile chuck and turning rack on the movable stand; The cylinder rod of folder bucket cylinder continues upwards top, makes this firmly clamping of side bung flange with sewage disposer of fixed chuck and mobile chuck.
The top cover of conventional garbage case open and the sewage disposer tilting structure complicated, and sewage disposer is splashed in the outside of rubbish container when toppling over easily.
The utility model content
The purpose of the utility model is, overcomes the problem that exists in the prior art, provide a kind of simple in structure, topple over easily before material loading rubbish from cooking case.
For solving above technical matters; A kind of preceding material loading rubbish from cooking case that the utility model provided comprises casing, and the upper front end of said casing is provided with the rubbish pour spout; The both sides of said rubbish pour spout are provided with breast board; The upper end of said rubbish pour spout is provided with able to turn on or off top cover, and the root of said top cover is hinged on the rear end of rubbish pour spout, and sewage disposer clamping bont is installed on the front end face of said casing; Be separately installed with top cover on the both sides wallboard of said rubbish pour spout and open and close oil cylinder; The piston rod part of said top cover keying oil cylinder is hinged on the middle part at said top cover edge, and the front end both sides of said top cover are hinged with pull bar respectively, and the lower end of said pull bar is hinged on the bottom of said sewage disposer clamping bont respectively; The back side of said sewage disposer clamping bont respectively through roller be supported on two be parallel to each other and guide rail that shape is identical on, said guide rail be fixed on the front end face of said casing and top in said rubbish pour spout progressively crooked until the termination down.
With respect to prior art; The utility model has been obtained following beneficial effect: sewage disposer is clamped on the sewage disposer clamping bont, and the piston rod of top cover keying oil cylinder stretches out top cover is started, and the front end of top cover moves up through pull bar pulling sewage disposer clamping bont; Sewage disposer clamping bont is along the up and final upset of guide rail; The sewage disposer bung is poured over rubbish in the bucket in the rubbish container down, accomplishes to the whole action of dumping rubbish is coherent from opening top cover, efficiently.
As the preferred version of the utility model, said sewage disposer clamping bont and said guide rail are set side by side with two covers.Once can topple over two sewage disposers simultaneously.
Description of drawings
Fig. 1 removes the front view behind the breast board of rubbish pour spout right side for the utility model.
Fig. 2 is the left view of Fig. 1.
Fig. 3 removes the block diagram behind the breast board of rubbish pour spout right side for the utility model.
Among the figure: 1 casing; 2 top covers; 3 top covers open and close oil cylinder; 4 sewage disposer clamping bonts; 5 guide rails; 6 pull bars; 7 hauling hooks.
The specific embodiment
Like Fig. 1, Fig. 2 and shown in Figure 3; The preceding material loading rubbish from cooking case of the utility model; The upper front end of casing 1 is provided with the rubbish pour spout, and the both sides of rubbish pour spout are provided with breast board, and the upper end of rubbish pour spout is provided with able to turn on or off top cover 2; The root of top cover 2 is hinged on the rear end of rubbish pour spout; Sewage disposer clamping bont 4 is installed on the front end face of casing, is separately installed with top cover on the both sides wallboard of rubbish pour spout and opens and closes oil cylinder 3, the piston rod part of top cover keying oil cylinder 3 is hinged on the middle part at top cover 2 edges; The front end both sides of top cover 2 are hinged with pull bar 6 respectively; The lower end of pull bar 6 is hinged on the bottom of sewage disposer clamping bont 4 respectively, the back side of sewage disposer clamping bont 4 respectively through roller be supported on two be parallel to each other and guide rail 5 that shape is identical on, guide rail 5 be fixed on the front end face of casing 1 and top in the rubbish pour spout progressively crooked until the termination down.Sewage disposer clamping bont 4 and guide rail 5 are set side by side with two covers, once can topple over two sewage disposers simultaneously.
In the work; Sewage disposer is clamped on the sewage disposer clamping bont 4; The piston rod of top cover keying oil cylinder 3 stretches out top cover 2 is started; The front end of top cover 2 moves up through pull bar 6 pulling sewage disposer clamping bonts 4, and sewage disposer clamping bont 4 is along guide rail 5 up and final upsets, and the sewage disposer bung is poured over rubbish in the bucket in the rubbish container down.
Except that the foregoing description, the utility model can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop in the protection domain of the utility model requirement.