CN202367128U - Upsetting forming production line for pointed cone part of spiral pile - Google Patents
Upsetting forming production line for pointed cone part of spiral pile Download PDFInfo
- Publication number
- CN202367128U CN202367128U CN2011205321496U CN201120532149U CN202367128U CN 202367128 U CN202367128 U CN 202367128U CN 2011205321496 U CN2011205321496 U CN 2011205321496U CN 201120532149 U CN201120532149 U CN 201120532149U CN 202367128 U CN202367128 U CN 202367128U
- Authority
- CN
- China
- Prior art keywords
- upsetting
- pipe fitting
- pointed cone
- production line
- upsetter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forging (AREA)
Abstract
The utility model discloses an upsetting forming production line for a pointed cone part of a spiral pile. The upsetting forming production line comprises a plurality of groups of upsetting equipment which are arranged to form multi-station grading upsetting; each group of upsetting equipment comprises a heating device and an upsetting machine which are sequentially arranged; one end of an upsetting machine tool body is provided with a forming die, and the other end of the upsetting machine tool body is provided with a clamping mechanical arm for clamping a pipe fitting; a conveying device which conveys the pipe fitting in a grading mode is crossed and erected above the upsetting machine tool bodies of a plurality of groups of the upsetting equipment; and the conveying device is provided with a plurality of clamping claws for positioning the pipe fitting. According to the technical scheme, a multi-station grading upsetting forming method is adopted, the closed forming of the pointed cone part can be guaranteed, and the upsetting forming production line has the advantages of automation, high processing quality, and high intensity of the pointed cone part, and the pointed cone part can be formed quickly.
Description
Technical field
The utility model belongs to the process equipment field of spiral pile, relates in particular to a kind of spiral pile pointed cone portion upsetting forming production line.
Background technology
The application of the central pile of engineering construction is very big, and it is widely used in many fields such as building construction, railway engineering, billboard, fence, wind-power electricity generation and solar electrical energy generation.Pile is building load-bearing and firm key.Existing pile is underground in order to be embedded in, and general bottom all is taper, is provided with helical blade above.The inventor has designed a kind of spiral pile; As shown in Figure 1, comprise tubulose pile body 3, pointed cone portion 6 is formed on tubulose pile body 3 bottoms; Tubulose pile body 3 tops are provided with 3 through holes along same circle distribution; These three through hole outside welded nuts 1, through hole 2 is used for exhaust with through hole 7, and tubulose pile body 3 middle parts and bottom are welded with one section helical blade 4,5 respectively.The utility model aims to provide the former of a kind of above-mentioned spiral pile pointed cone portion, and an end closed moulding of pipe fitting is formed pointed cone portion.
Summary of the invention
In order to solve above-mentioned technical problem; The purpose of the utility model provides a kind of spiral pile pointed cone portion upsetting forming production line; Adopt the progressive upsetting method of forming of multistation; Not only can guarantee pointed cone portion closed moulding, and have automation, moulding is fast, crudy good, pointed cone portion intensity advantages of higher.
In order to reach above-mentioned purpose, the technical scheme below the utility model has adopted:
Spiral pile pointed cone portion upsetting forming production line; Comprise the many groups upsetting equipment that constitutes the progressive upsetting of multistation of arranging; Every group of upsetting equipment comprises successively arranges a heater and a upsetter that is provided with, and an end of upsetter lathe bed is arranged to pattern, and the other end is provided with the clamping mechanical hand of clamping pipe fitting; The upsetter lathe bed top of said many group upsetting equipment is across setting up the transport that adopts progressive mode to transport pipe fitting, and this transport is provided with the jaw of a plurality of location pipe fitting.
As preferably, said heater is a thermatron, and this heater is connected with radio-frequency generator.High-frequency heating is pollution-free rapidly.As for the heating tube arrangement; Heating tube can be set respectively in the above and below of pipe fitting to be heated the upsetting end of pipe fitting; But preferred heating tube helical buckling circularizes structure; After pipe fitting puts in place, see heating ring off ring set and heat at the upsetting end of pipe fitting, heating ring withdraws from pipe fitting again after accomplishing, and can fully guarantee the pipe fitting thermally equivalent like this.
As preferably, said upsetter comprises lathe bed, and lathe bed one end horizontal slip is provided with slide block, is fixed into pattern on the slide block, and slide block is driven through crankshaft connecting rod system by motor and slides, and the lathe bed other end is provided with block, and the clamping mechanical hand is set on the block.Through slide block and go up seesawing of shaping mould and realize upsetting processing, add the man-hour pipe fitting other end and vibrate to limit it by the clamping of clamping mechanical hand to pipe fitting one end.Further preferred, said clamping mechanical hand comprise one be fixed on the pipe fitting below fixed block and one with fixed block about the movable block of corresponding setting, this movable block is fixed on the piston rod of many guide rod cylinder lower end.
As preferably; Said transport comprises across the carriage above the upsetter lathe bed of described many group upsetting equipment; Rotate the two circle chains that are provided with around the upsetter lathe bed of described many group upsetting equipment on the carriage; The fixed interval distance is provided with said jaw on the chain, and described two circle chains drive synchronous transport by servomotor through gear, power transmission shaft.
The utility model adopts the progressive upsetting method of forming of multistation owing to adopted above technical scheme, not only can guarantee pointed cone portion closed moulding, and have automation, moulding is fast, crudy good, pointed cone portion intensity advantages of higher.
Description of drawings
Fig. 1 is the structural representation of spiral pile;
Fig. 2 is the utility model upsetting schematic flow sheet;
Fig. 3 is the stereogram of the utility model;
Fig. 4 is the structural representation of the utility model;
Fig. 5 is the right view of Fig. 4.
The specific embodiment
Below in conjunction with accompanying drawing the specific embodiment of the utility model is done a detailed explanation.
Embodiment 1:
Like Fig. 3, Fig. 4, spiral pile pointed cone portion upsetting forming production line shown in Figure 5; Comprise the four groups of upsetting equipment (being followed successively by first to fourth 4 group equipment among Fig. 4 from left to right) that constitute the progressive upsetting of multistation of arranging; Every group of upsetting equipment comprises successively arranges a heater 406 and a upsetter 401 that is provided with; One end of upsetter 401 lathe beds is arranged to pattern 403; The other end is provided with the clamping mechanical hand 405 of clamping pipe fitting, and the upsetter 401 lathe beds top of said four groups of upsetting equipment is across setting up the transport that adopts progressive mode to transport pipe fitting, and this transport is provided with the jaw 404 of a plurality of location pipe fitting.
In the present embodiment, said heater 406 is a thermatron, and this heater 406 is connected with radio-frequency generator 402; As shown in Figure 5, said upsetter 401 comprises lathe bed, and lathe bed one end horizontal slip is provided with slide block, is fixed into pattern 403 on the slide block, and slide block is driven through crankshaft connecting rod system by motor and slides, and the lathe bed other end is provided with block, and clamping mechanical hand 405 is set on the block; Said clamping mechanical hand 405 comprise one be fixed on pipe fitting below fixed block and one with fixed block about the movable block of corresponding setting, this movable block is fixed on the piston rod of many guide rod cylinder lower end.Like Fig. 3, shown in Figure 4; Said transport comprises across the carriage 409 above upsetter 401 lathe beds of described four groups of upsetting equipment; Rotate the two circle chains 407 that are provided with around upsetter 401 lathe beds of described four groups of upsetting equipment on the carriage 409; The fixed interval distance is provided with said jaw 404 on the chain 407, and described two circle chains 407 drive synchronous transport by servomotor 408 through gear, power transmission shaft.
Pipe fitting 3 is placed on the jaw 404 of chain 407, is carried with progressive mode by chain 407, and pipe fitting pointed cone portion moulding flow process is as shown in Figure 2; At first; Pipe fitting 3 on first heater to upsetting end heating, station of chain feeding then, pipe fitting 3 moves into first upsetter; 405 actions of clamping mechanical hand clamp the non-upsetting end of pipe fitting, and the upsetting end of pipe fitting divides three sections to carry out reducing upsetting processing by the action of first upsetter; Chain station of feeding more then; Pipe fitting 3 moves into second heater and the upsetting end is heated; Chain station of feeding more then; Pipe fitting 3 moves into second upsetter, and 405 actions of clamping mechanical hand clamp the non-upsetting end of pipe fitting, and the upsetting end of pipe fitting carries out further reducing upsetting processing by the action of second upsetter to above-mentioned three sections reducing positions; Chain station of feeding more then; Pipe fitting 3 moves into the 3rd heater and the upsetting end is heated; Chain station of feeding more then; Pipe fitting 3 moves into the 3rd upsetter, and 405 actions of clamping mechanical hand clamp the non-upsetting end of pipe fitting, and the upsetting end of pipe fitting carries out further reducing upsetting processing again by the action of the 3rd upsetter to above-mentioned three sections reducing positions; Chain station of feeding more then; Pipe fitting 3 moves into the 4th heater and the upsetting end is heated; Chain station of feeding more then, pipe fitting 3 moves into the 4th upsetter, and 405 actions of clamping mechanical hand clamp the non-upsetting end of pipe fittings; The upsetting end of pipe fitting forms pointed cone portion with above-mentioned reducing position through upsetting processing closed moulding by the 4th upsetter action, best chain again station general of feeding the pipe fitting of moulding pointed cone portion see off to the following process operation.
Claims (5)
1. spiral pile pointed cone portion upsetting forming production line; It is characterized in that; Comprise the many groups upsetting equipment that constitutes the progressive upsetting of multistation of arranging; Every group of upsetting equipment comprises successively arranges a heater (406) and a upsetter (401) that is provided with, and an end of upsetter (401) lathe bed is arranged to pattern (403), and the other end is provided with the clamping mechanical hand (405) of clamping pipe fitting; Upsetter (401) the lathe bed top of said many group upsetting equipment is across setting up the transport that adopts progressive mode to transport pipe fitting, and this transport is provided with the jaw (404) of a plurality of location pipe fitting.
2. spiral pile pointed cone according to claim 1 portion upsetting forming production line is characterized in that said heater (406) is a thermatron, and this heater (406) is connected with radio-frequency generator (402).
3. spiral pile pointed cone according to claim 1 portion upsetting forming production line; It is characterized in that said upsetter (401) comprises lathe bed, lathe bed one end horizontal slip is provided with slide block; Be fixed into pattern (403) on the slide block; Slide block is driven through crankshaft connecting rod system by motor and slides, and the lathe bed other end is provided with block, and clamping mechanical hand (405) is set on the block.
4. spiral pile pointed cone according to claim 1 portion upsetting forming production line; It is characterized in that; Said clamping mechanical hand (405) comprise one be fixed on pipe fitting below fixed block and one with fixed block about the movable block of corresponding setting, this movable block is fixed on the piston rod of many guide rod cylinder lower end.
5. spiral pile pointed cone according to claim 1 portion upsetting forming production line; It is characterized in that; Said transport comprises across the carriage (409) above upsetter (401) lathe bed of described many group upsetting equipment; Carriage (409) is gone up and is rotated the two circle chains (407) that are provided with around upsetter (401) lathe bed of described many group upsetting equipment; Chain (407) is gone up the fixed interval distance said jaw (404) is set, and described two circle chains (407) drive synchronous transport by servomotor through gear, power transmission shaft.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205321496U CN202367128U (en) | 2011-12-16 | 2011-12-16 | Upsetting forming production line for pointed cone part of spiral pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205321496U CN202367128U (en) | 2011-12-16 | 2011-12-16 | Upsetting forming production line for pointed cone part of spiral pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202367128U true CN202367128U (en) | 2012-08-08 |
Family
ID=46590852
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011205321496U Expired - Fee Related CN202367128U (en) | 2011-12-16 | 2011-12-16 | Upsetting forming production line for pointed cone part of spiral pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202367128U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102489648A (en) * | 2011-12-16 | 2012-06-13 | 浙江博雷重型机床制造有限公司 | Upsetting forming production line of sharp-pointed portions of spiral ground piles |
CN108655312A (en) * | 2017-03-31 | 2018-10-16 | 祥和科技(珠海)有限公司 | Method and apparatus for progressively forging Mobile equipment shell |
CN111363895A (en) * | 2020-04-27 | 2020-07-03 | 埃肯铸造(中国)有限公司 | Heating process for maintaining air-blowing pick tip |
-
2011
- 2011-12-16 CN CN2011205321496U patent/CN202367128U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102489648A (en) * | 2011-12-16 | 2012-06-13 | 浙江博雷重型机床制造有限公司 | Upsetting forming production line of sharp-pointed portions of spiral ground piles |
CN102489648B (en) * | 2011-12-16 | 2014-06-04 | 浙江博雷重型机床制造有限公司 | Upsetting forming production line of sharp-pointed portions of spiral ground piles |
CN108655312A (en) * | 2017-03-31 | 2018-10-16 | 祥和科技(珠海)有限公司 | Method and apparatus for progressively forging Mobile equipment shell |
CN111363895A (en) * | 2020-04-27 | 2020-07-03 | 埃肯铸造(中国)有限公司 | Heating process for maintaining air-blowing pick tip |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202367128U (en) | Upsetting forming production line for pointed cone part of spiral pile | |
CN203599317U (en) | Pipe bending machine | |
CN202894677U (en) | Assembling and extending system for heavy loading of super long pipeline | |
CN208763814U (en) | A kind of outdoor wind energy sun stretchy power generator | |
CN103203409A (en) | Pipe fitting production line | |
CN102489648B (en) | Upsetting forming production line of sharp-pointed portions of spiral ground piles | |
CN201069757Y (en) | Automatic sealing device for short pin of spiral fluorescent lamp tube | |
CN105598233A (en) | Vertical reinforcing mesh bending forming machine | |
CN203621466U (en) | Fully automatic accumulator plate cast weld machine | |
CN101348173B (en) | Pipe automatic packaging machine | |
CN201807888U (en) | Assembly line for high-voltage combined electrical apparatus | |
CN102490265B (en) | Spiral pile toe pyramid spin molding production line | |
CN206578220U (en) | A kind of spinning machine of large diameter steel pipe spigot-and-socket joint | |
CN203265382U (en) | Production line for machining pipes | |
CN201997636U (en) | Novel steel bar forming machine | |
CN203991747U (en) | Small-bore concetrated pipe arm drawing process frock | |
CN201990861U (en) | Automatic balance ring processing line | |
CN202097273U (en) | Integrated compound die for press mounting and ridging of muffler pipes and insulation boards | |
CN101985140A (en) | Bending forming method and device for circular edge section | |
CN202415644U (en) | Two-station full-automatic crankshaft quenching machining tool | |
CN204799817U (en) | Connecting device is riveted in dashing of torsion frame and shaping structure is riveted in dashing of machined part thereof | |
CN209697822U (en) | A kind of big reducing thin wall pipe compound molding device | |
CN102581839A (en) | Feeding manipulator | |
CN203807333U (en) | Crystal pendant forming machine | |
CN209037045U (en) | A kind of equipment of cast iron pipe liner PE pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120808 Termination date: 20131216 |