CN202360121U - Forepoling support of coal roadway tunneling anchor mesh cable support - Google Patents

Forepoling support of coal roadway tunneling anchor mesh cable support Download PDF

Info

Publication number
CN202360121U
CN202360121U CN2011205118707U CN201120511870U CN202360121U CN 202360121 U CN202360121 U CN 202360121U CN 2011205118707 U CN2011205118707 U CN 2011205118707U CN 201120511870 U CN201120511870 U CN 201120511870U CN 202360121 U CN202360121 U CN 202360121U
Authority
CN
China
Prior art keywords
support
forepoling
forestope
coal roadway
mesh cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205118707U
Other languages
Chinese (zh)
Inventor
肖长河
陈广斋
顾喜
王合涛
马瑞刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Eighth Coal Mine Of Hebi Coal & Electricity Co Ltd
Original Assignee
Eighth Coal Mine Of Hebi Coal & Electricity Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Eighth Coal Mine Of Hebi Coal & Electricity Co Ltd filed Critical Eighth Coal Mine Of Hebi Coal & Electricity Co Ltd
Priority to CN2011205118707U priority Critical patent/CN202360121U/en
Application granted granted Critical
Publication of CN202360121U publication Critical patent/CN202360121U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a forepoling support of a coal roadway tunneling anchor mesh cable support, comprising a forepoling bar and a forepoling bar clamp, wherein the forepoling bar clamp comprises a bracket; the bracket is provided with a fixed screw hole; a nut is fixed on the bracket and is matched with a lead screw; the top end of the lead screw is provided with a forepoling bar support; a pressure bearing is arranged between the forepoling bar support and the lead screw; and the bottom of the lead screw is provided with an elastic wrench. The forepoling support effectively solves the forepoling bar supporting problem of the coal roadway anchor mesh cable supporting, is convenient to use and optimizes coal roadway tunneling space. The forepoling support is utilized in 32011 North-Down crossheading of a mine, improves the safety of coal roadway anchor mesh cable supporting tunneling and plays important role in safety production.

Description

Coal road driving anchor rete cord supporting front-probe support
Technical field
The utility model relates to the advance support of using in a kind of shed shoring construction, is specifically related to the advance support that a kind of anchor net adds the anchor cable combined supporting.
Background technology
Mostly projecting coal bed coal road driving is to adopt the anchor net to add the anchor cable combined supporting along the roof driving.In general shed shoring work progress, must use advance support; Used U type canopy and i iron supporting that comparatively successful front-probe support is all arranged in the past; Do not have effective advance support and adopt this anchor net to add anchor cable combined supporting mode, be unfavorable for Safety of Coal Mine Production.
The utility model content
The purpose of the utility model is the deficiency to above-mentioned prior art, and a kind of coal road driving anchor rete cord supporting front-probe support is provided, and helps Safety of Coal Mine Production.
The technical scheme of the utility model realizes in the following manner: a kind of coal road driving anchor rete cord supporting front-probe support, comprise forestope and forestope clamp, and said forestope clamp comprises support; Support is provided with the anchoring filament hole; Be fixed with nut on the support, nut matches with leading screw, and the leading screw top is provided with the forestope holder; Be provided with pressure bearing between forestope holder and the leading screw, the leading screw bottom is provided with the degree of tightness spanner.
Said anchoring filament hole is a bar hole.
Said forestope is a π type beam.
The utility model efficiently solves the front-probe support problem of coal road anchor rete cord supporting, and is easy to use, optimizes coal road driving space.I use this device by ore deposit crossheading under 32011 north, have improved the safety of coal road anchor rete cord supporting driving, for bigger effect has been played in safety in production.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Fig. 2 is the schematic top plan view of Fig. 1.
Fig. 3 is the structural representation of forestope clamp.
Fig. 4 is the schematic top plan view of Fig. 3.
The specific embodiment
Shown in accompanying drawing, a kind of coal road driving anchor rete cord supporting front-probe support comprises forestope 1 and forestope clamp 2; Said forestope clamp 2 comprises support 2-1, and support 2-1 is provided with anchoring filament hole 2-5, is fixed with nut 2-7 on the support 2-1; Nut 2-7 matches with leading screw 2-4; Leading screw 2-4 top is provided with forestope holder 2-3, is provided with pressure bearing 2-2 between forestope holder 2-3 and the leading screw 2-4, and leading screw 2-4 bottom is provided with degree of tightness spanner 2-6.
Every group of forestope of the utility model 1 uses four forestope clamps 2, earlier forestope card 2 is fixed on the roofbolt screw through anchoring filament hole 2-5, then forestope 1 is fixed on the forestope clamp 2, and method for using is following:
1, used front-probe support hung up properly with forestope clamp 2 before blowing out after, firm on the adjustment screw mandrel 2-4.
2, the utility model will tighten, go up the jail with top board comprehensive engagement, end silk.
3, tap earlier after blowing out, look for group to push up dangerous coal petrography.
4, the adjustment boosting-rod is held exposed top board after making front-probe support stretch out 0.5~0.7m.
5, the rapid good roll bolt of anchor, and hang net and carried on the back the top.
6, after the top is carried on the back well, under forestope, expand group and produce coal on (rock), anchor pole is helped in anchoring two.
In the utility model, said anchoring filament hole 2-5 is a bar hole, like this can be easily fixing front-axle beam clamp.
Said forestope 1 is a π type beam.

Claims (3)

1. a coal road tunnels anchor rete cord supporting front-probe support; Comprise forestope (1) and forestope clamp (2); It is characterized in that: said forestope clamp (2) comprises support (2-1), and support (2-1) is provided with anchoring filament hole (2-5), is fixed with nut (2-7) on the support (2-1); Nut (2-7) matches with leading screw (2-4); Leading screw (2-4) top is provided with forestope holder (2-3), is provided with pressure bearing (2-2) between forestope holder (2-3) and the leading screw (2-4), and leading screw (2-4) bottom is provided with degree of tightness spanner (2-6).
2. coal road driving anchor rete cord supporting front-probe support according to claim 1, it is characterized in that: said anchoring filament hole (2-5) is a bar hole.
3. coal road driving anchor rete cord supporting front-probe support according to claim 1, it is characterized in that: said forestope (1) is a π type beam.
CN2011205118707U 2011-12-09 2011-12-09 Forepoling support of coal roadway tunneling anchor mesh cable support Expired - Fee Related CN202360121U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205118707U CN202360121U (en) 2011-12-09 2011-12-09 Forepoling support of coal roadway tunneling anchor mesh cable support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205118707U CN202360121U (en) 2011-12-09 2011-12-09 Forepoling support of coal roadway tunneling anchor mesh cable support

Publications (1)

Publication Number Publication Date
CN202360121U true CN202360121U (en) 2012-08-01

Family

ID=46571312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205118707U Expired - Fee Related CN202360121U (en) 2011-12-09 2011-12-09 Forepoling support of coal roadway tunneling anchor mesh cable support

Country Status (1)

Country Link
CN (1) CN202360121U (en)

Similar Documents

Publication Publication Date Title
CN202674167U (en) Steel wire rope tensioning device
CN202391435U (en) Vertical buried type water stop clamp of inverted arch
CN103244607A (en) Steel wire rope tensioning device
CN204960953U (en) Vertical waterstop of formula of burying device of flare -outing in tunnel
CN201121521Y (en) Opposite pull anchor wire
CN202360121U (en) Forepoling support of coal roadway tunneling anchor mesh cable support
CN201090226Y (en) Anchor anti-rift arrangement
CN203271739U (en) Support for electric coal drill
CN204551463U (en) The anchor pole of a kind of rotatable break-in and recovery
CN203096597U (en) Bridge suspender connecting device
CN202970747U (en) Hollow bolt-grouting anchor cable for mine
CN206600182U (en) A kind of anti-disconnected anchor for being adapted to roadway with large deformation country rock
CN2934577Y (en) Recoverable screw thread anchor rod
CN204907379U (en) Quick support frame of trees
CN203905976U (en) Anchor rod pre-burying and filling body casting steel mold
CN207499888U (en) A kind of support device of constructing tunnel arch roof-bolter
CN201802421U (en) Device for fixing beam support of U-shaped steel support for tunnel
CN201292861Y (en) Fixing clip for coal mine downhole tunnel hanging median line
CN203335101U (en) Hook type temporary support for U-shaped steel frame shed roadway of coal mine
CN207740001U (en) One kind drawing mine scraper multi-angle bracing means for underground
CN202560086U (en) Special ladder for underground water prospecting and drainage of coal mine
CN206503610U (en) A kind of underground coal mine supporting
CN101340071B (en) Cable group hanging device
CN210460709U (en) Front canopy clamping device for coal mine advance support
CN202483594U (en) Bracket anti-toppling device for metal bracket alley

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120801

Termination date: 20121209