CN202358847U - Adjusting device of metallurgic overhead crane - Google Patents

Adjusting device of metallurgic overhead crane Download PDF

Info

Publication number
CN202358847U
CN202358847U CN2011204342495U CN201120434249U CN202358847U CN 202358847 U CN202358847 U CN 202358847U CN 2011204342495 U CN2011204342495 U CN 2011204342495U CN 201120434249 U CN201120434249 U CN 201120434249U CN 202358847 U CN202358847 U CN 202358847U
Authority
CN
China
Prior art keywords
bridge type
main carriage
crane
platform
setting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2011204342495U
Other languages
Chinese (zh)
Inventor
刘保才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Jianlong Iron and Steel Co Ltd
Original Assignee
Jilin Jianlong Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Jianlong Iron and Steel Co Ltd filed Critical Jilin Jianlong Iron and Steel Co Ltd
Priority to CN2011204342495U priority Critical patent/CN202358847U/en
Application granted granted Critical
Publication of CN202358847U publication Critical patent/CN202358847U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides an adjusting device of a metallurgic overhead crane, and the adjusting device is a main trolley (1) for the metallurgic overhead crane and comprises a platform (01), a plurality of pillars (02), jacks (03), a measuring tool and a level gauge, wherein the pillars (02) are arranged on the top end face of the platform (01); the pillars (02) are respectively corresponding to a subsection beam (14) and a crane beam (13) at the both sides of a connection board (12) of the main trolley (1); the jacks (3) are arranged on the pillars (02) for adjusting the relative height of the subsection beam (14) and the crane beam (13); the measuring tool is used for measuring an axis deviation on the connection of a primary speed reducer (6) and a secondary speed reducer (7) of the main trolley (1); and the level gauge is used for measuring the crane beam (13) of the main trolley (1). The adjusting device is used for adjusting the axis deviation without hoisting the main trolley (1) from the beam of the metallurgic overhead crane and placing the main trolley on the ground. The adjusting device provided by the utility model has the advantages of simple and convenience in operation, time-saving and labor-saving properties, cost-saving property due to no need of remanufacturing the main trolley, and higher repeated operability.

Description

A kind of setting device of metallurgical crane in bridge type
Technical field
The utility model relates to technical field of metallurgical equipment, more particularly, relates to a kind of setting device of metallurgical crane in bridge type.
Background technology
Crane in bridge type be crossbearer in the workshop, warehouse and the sky, the stock ground weight-lifting equipment that carries out the material handling.Because its two ends are seated on the tall and big concrete column or metallic support, shape is like bridge, so be called crane in bridge type.The crane span structure of crane in bridge type vertically moves along being laid on the track of both sides on overhead, can make full use of the space handling material below the crane span structure, does not receive the obstruction of wayside equipment, and it is to use a kind of elevator machinery widest in area, that quantity is maximum.
Metallurgical crane in bridge type mainly is applied to metal smelt, roll and made field such as hot working; Metallurgical crane in bridge type can be participated in specific technological operation in steel manufacture process; Its basic structure is similar with ordinary bridge crane; But be used on the crossbeam of crane in bridge type to transport and the crane carriage of the liquid metal that goes up and down on special operating mechanism or device also are housed, the work characteristics of this hoisting crane is to use frequently, inclement condition, working level is higher.The metallurgical crane in bridge type (overhead traveling crane) that has put into operation at present; As shown in Figure 1; Crane carriage is divided into main carriage 1 and secondary dolly 2; As shown in Figure 2, main carriage 1 adopts isosceles triangle to put for three reductors of split modular structure and main hoisting mechanism, and No. one time reductor 6 is the base type reductor; Secondary speed-reducing machine 7 is that (reductor base angle fixed form is three points to three fulcrum reductors; The output shaft two ends that are reductor respectively have a rear end fulcrum 10, front end near the input shaft place front end fulcrum 9 to be arranged, and front end fulcrum 9 can vertically carry out the adjustment of trace, and two rear end fulcrums 10 at the output shaft two ends of secondary speed-reducing machine 7 can allow the body of 2-level reducer 7 to rotate around output shaft); First and second reductor in three reductors of great majority is after operation a period of time; Radial displacement in various degree will appear in the axle center of the diaxon of reductor 6 and secondary speed-reducing machine 7 junctions (output shaft 5 of a reductor and the input shaft 8 of secondary speed-reducing machine); After displacement is overproof; Just might push away the end cap of coupler 4 (end cap adopts screw to connect), cause and take off tooth, and then make secondary speed-reducing machine 7 and reel 3 uncontrollable; Make and the ladle free fall of holding liquid metal of playing cause great industrial accident.
In the prior art; Settling mode to the problems referred to above is: when radial displacement occurring in the axle center of the diaxon of finding reductor 6 and secondary speed-reducing machine 7 junctions; Regulate the front end fulcrum 9 of secondary speed-reducing machine 7; Make the input shaft 8 of secondary speed-reducing machine 7 rise or descend, with the purpose of the axle center deviation of the diaxon of realizing eliminating reductor 6 and secondary speed-reducing machine 7 junctions.But; When the front end fulcrum 8 of adjustment secondary speed-reducing machine 7 still can't be eliminated the axle center deviation fully, just need main carriage 1 is hung the crossbeam of metallurgical crane in bridge type, be placed on the ground it is further adjusted; Do not only time-consuming, effort like this; And also need remanufacturing to make main carriage 1 sometimes, and wasted a large amount of financial resources, also production efficiency is affected greatly.
In sum; How a kind of setting device of metallurgical crane in bridge type is provided; All the time need not main carriage is hung the crossbeam of metallurgical crane in bridge type when being implemented in the axle center of first and second reductor on the adjustment main carriage, is present those skilled in the art's problem demanding prompt solution.
The utility model content
In view of this; The utility model provides a kind of setting device of metallurgical crane in bridge type; All the time need not main carriage is hung the crossbeam of metallurgical crane in bridge type when being implemented in the axle center of first and second reductor on the adjustment main carriage, on crossbeam, can adjust easily.
In order to achieve the above object, the utility model provides following technical scheme:
A kind of setting device of metallurgical crane in bridge type is used for the main carriage of metallurgical crane in bridge type, comprising:
Platform;
Be arranged on a plurality of pillars on the said flat-bed top end face, these a plurality of pillars segmentation beam and car beam with the connecting panel both sides of said main carriage respectively are corresponding;
Be arranged on the said pillar to adjust the jack of said segmentation beam and car beam relative height;
Measure the reductor of said main carriage and the measuring tool of axle center, secondary speed-reducing machine junction deviation;
Measure the level indicator of the car beam of said main carriage.
Preferably, in the setting device of above-mentioned metallurgical crane in bridge type, said platform is provided with the I-beam section that supports said flat-bed top end face.
Preferably, in the setting device of above-mentioned metallurgical crane in bridge type, also comprise and support said flat-bed auxiliary support frame.
Preferably, in the setting device of above-mentioned metallurgical crane in bridge type, also comprise the stop block of the wheel of fixing said main carriage.
Preferably, in the setting device of above-mentioned metallurgical crane in bridge type, between said platform and the said pillar for being threaded or welding.
Preferably, in the setting device of above-mentioned metallurgical crane in bridge type, said jack supports the segmentation beam and the Che Liang of said main carriage through backing plate.
Preferably, in the setting device of above-mentioned metallurgical crane in bridge type, the quantity of said pillar is 8.
With respect to prior art, the beneficial effect of the utility model is:
In the setting device of the metallurgical crane in bridge type that the utility model provides; It is when starting working; With level indicator the car beam of main carriage is measured; Make the car beam remain on level attitude, when the front end fulcrum of adjustment secondary speed-reducing machine can't be eliminated deviation fully, again the platform fixed placement is arrived and the cooresponding position of main carriage; Segmentation beam and the car beam with main carriage is corresponding respectively to make pillar on the platform; The jack of operation setting on pillar makes it produce certain bearing force to segmentation beam and car beam, and the adjustment connecting panel makes connected segmentation beam and car beam that relatively moving vertically can be taken place, and the car beam of the result of a measurement of axle center deviation being confirmed main carriage according to measuring tool is with respect to segmentation beam arch (upwards top) still downwarp (to decline); With the change of the horizontal throw of the input shaft of realizing two secondary speed-reducing machines, and then eliminate the axle center deviation of the diaxon of reductor and secondary speed-reducing machine junction.Adopt this device adjustment axle center deviation, need not main carriage hung from the crossbeam of metallurgical crane in bridge type and be placed on the ground, easy and simple to handle; Shortened the adjustment time greatly; Reduce work load, need not make main carriage again, practiced thrift cost; Also reduced influence, had higher repetitive operation property production efficiency.
Description of drawings
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art; To do to introduce simply to the accompanying drawing of required use in embodiment or the description of the Prior Art below; Obviously, the accompanying drawing in describing below only is some embodiment of the utility model, for those of ordinary skills; Under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is platform, main carriage and the secondary dolly birds-eye view on metallurgical crane in bridge type crossbeam;
Fig. 2 is the structural representation of the speed reduction gearing on the main carriage of metallurgical crane in bridge type;
Fig. 3 is the work scheme drawing of the setting device of the metallurgical crane in bridge type that provides among the utility model embodiment;
Fig. 4 be among Fig. 1 flat-bed B to lateral plan;
Fig. 5 is a flat-bed birds-eye view among Fig. 1;
Fig. 6 be among Fig. 1 flat-bed A to lateral plan;
Fig. 7 is the structural representation of car beam and arch of segmentation beam or downwarp;
Fig. 8 is a stop block and the scheme drawing that cooperates of main carriage wheel;
Fig. 9 is a tilt prop and the scheme drawing that cooperates of main carriage wheel.
Among last Fig. 1-Fig. 9:
Platform 01, pillar 02, jack 03, I-beam section 04, auxiliary support frame 05, stop block 06, tilt prop 07, backing plate 08, main carriage 1, secondary dolly 2, reel 3, coupler 4, speed reducer output shaft 5, reductor 6, secondary speed-reducing machine 7, secondary speed-reducing machine output shaft 8, front end fulcrum 9, rear end fulcrum 10, guide rail 11, connecting panel 12, car beam 13, segmentation beam 14, wheel 15.
The specific embodiment
The utility model provides a kind of setting device of metallurgical crane in bridge type; All the time need not main carriage is hung the crossbeam of metallurgical crane in bridge type when being implemented in the axle center of first and second reductor on the adjustment main carriage, make entire work process save time, laborsaving, economize wealth.
To combine the accompanying drawing among the utility model embodiment below, the technical scheme among the utility model embodiment is carried out clear, intactly description, obviously, described embodiment only is the utility model part embodiment, rather than whole embodiment.Based on the embodiment in the utility model, those of ordinary skills are not making the every other embodiment that is obtained under the creative work prerequisite, all belong to the scope of the utility model protection.
Please refer to accompanying drawing 3-6, Fig. 3 is the work scheme drawing of the setting device of the metallurgical crane in bridge type that provides among the utility model embodiment; Fig. 4 be among Fig. 1 flat-bed B to lateral plan; Fig. 5 is a flat-bed birds-eye view among Fig. 1; Fig. 6 be among Fig. 1 flat-bed A to lateral plan.
The setting device of the metallurgical crane in bridge type that the utility model embodiment provides is used for the main carriage 1 of metallurgical crane in bridge type, and it comprises:
Platform 01, this platform 01 are arranged on the guide rail 11 of metallurgical crane in bridge type confession main carriage 1 motion;
Be arranged on a plurality of pillars 02 on the top end face of said platform 01, these a plurality of pillars 02 segmentation beam 14 with connecting panel 12 both sides of said main carriage 1 respectively are corresponding with car beam 13;
Be arranged on the said pillar 02 to adjust the jack 03 of said segmentation beam 14 and car beam 13 relative heights;
Measure a reductor 6 of said main carriage 1 and the measuring tool of axle center, secondary speed-reducing machine 7 junction deviation;
Measure the level indicator of the car beam 13 of said main carriage 1.
The working process of the setting device of the metallurgical crane in bridge type that the utility model embodiment provides is following:
When deviation appears in the axle center of the diaxon (output shaft 5 of a reductor and the input shaft 8 of secondary speed-reducing machine) of reductor 6 and secondary speed-reducing machine 7 junctions; At first, the usage level appearance is measured the car beam 13 of main carriage 1, to confirm that car beam 13 remains on horizontality; When the front end fulcrum 9 of adjustment secondary speed-reducing machine 7 can't be eliminated deviation fully; Again platform 01 is fixedly installed on main carriage 1 below, the segmentation beam 14 of corresponding main carriage 1 is provided with pillar 02 with car beam 13 on the top end face of main carriage 1, and jack 03 is set on pillar 02; Adjustment jack 03 makes its segmentation beam 14 to main carriage 1 have certain bearing force with car beam 13; The adjustment connecting panel 12 segmentation beam that makes 14 and car beam 13 be in that relatively moving vertically can be taken place through connecting panel 12 bonded assembly junctions, according to the result of a measurement of measuring tool to the axle center deviation, and the relative position of adjustment car beam 13 and segmentation beam 14; It is (as shown in Figure 7 to make it that relative arch or downwarp take place; Fig. 7 is the structural representation of car beam and arch of segmentation beam or downwarp, and when arch or downwarp, the distance between two output shafts 8 of two secondary speed-reducing machines 7 not only in the vertical direction changes; Also can change in the horizontal direction; By original distance A become A and two B apart from sum), with the relative position (comprising horizontal direction and vertical direction) of two input shafts 8 changing two secondary speed-reducing machines 7, the final axle center deviation that realizes eliminating the diaxon of reductor 6 and secondary speed-reducing machine 7 junctions.
Can draw through above-mentioned working process; The setting device of the metallurgical crane in bridge type that the utility model embodiment provides; Can can't eliminate fully under the situation of axle center deviation of diaxon of reductor 6 and secondary speed-reducing machine 7 junctions at adjustment secondary speed-reducing machine 7 front end fulcrums 9, need not main carriage 1 is hung the crossbeam of metallurgical crane in bridge type, online can the adjustment; Time saving and energy saving province wealth has higher repetitive operation property.
In order further to optimize technique scheme, the setting device of the metallurgical crane in bridge type that the utility model embodiment provides, said platform 01 are provided with the I-beam section 04 of the top end face that supports said platform 01.Like Fig. 4 and shown in Figure 5, I-beam section 04 is set on platform 01, further optimized the structure of platform 01, make it firmer, work is more remarkable.
In order further to optimize technique scheme, the setting device of the metallurgical crane in bridge type that the utility model embodiment provides also comprises the auxiliary support frame 05 that supports said platform 01.As shown in Figure 6; With platform 01 be arranged on supply on the guide rail 11 that main carriage 1 moves after, further increase by 05 pair of platform 01 of auxiliary support frame and support and fix, increased the steadiness of platform 01; Reduced the risk that causes industrial accident built on the sand to be set because of platform 01; Concrete, auxiliary support frame 05 is " worker " font, under the prerequisite that does not influence support effect, can also be other shape or supporting way.
In order further to optimize technique scheme, the setting device of the metallurgical crane in bridge type that the utility model embodiment provides also comprises the stop block 06 of the wheel 15 of fixing said main carriage 1.As shown in Figure 8, Fig. 8 is a stop block and the scheme drawing that cooperates of main carriage wheel.When the secondary speed-reducing machine 7 on the main carriage 1 is adjusted, must main carriage 1 is fixing, it can't be moved on guide rail 11; Stop block 06 is set just can realizes fixing by actv. main carriage 1; Concrete, as shown in Figure 9, Fig. 9 is a tilt prop and the scheme drawing that cooperates of main carriage wheel.Tilt prop 07 can also be set on main carriage 1, can realize fixing equally main carriage 1.Certainly, to the fixing mode that can also adopt other of main carriage 1, fixed form is not limited to the described embodiment of present embodiment.
In order further to optimize technique scheme, the setting device of the metallurgical crane in bridge type that the utility model embodiment provides, between said platform 01 and the said pillar 02 for being threaded or welding.Concrete, under the prerequisite that does not influence the setting device normal operation, can also be other connection mode.
In order further to optimize technique scheme, the setting device of the metallurgical crane in bridge type that the utility model embodiment provides, said jack 03 support the segmentation beam 14 and car beam 13 of said main carriage 1 through backing plate 08.Between jack 03 and main carriage 1, backing plate 08 is set; The area of thrust surface of main carriage 1 have been increased; Reduced also to have increased the connection steadiness between jack 03 and the main carriage 1 simultaneously, further ensured carrying out smoothly of work because of the big injury of local pressure gap to main carriage 1.
For the further technique scheme of optimizing, the setting device of the metallurgical crane in bridge type that the utility model embodiment provides, the quantity of said pillar 02 is 8.Concrete, under the prerequisite that does not influence normal operation, the quantity of pillar 02 is unfixing.
To the above-mentioned explanation of the disclosed embodiments, make this area professional and technical personnel can realize or use the utility model.Multiple modification to these embodiment will be conspicuous concerning those skilled in the art, and defined General Principle can realize under the situation of spirit that does not break away from the utility model or scope in other embodiments among this paper.Therefore, the utility model will can not be restricted to these embodiment shown in this paper, but will meet and principle disclosed herein and features of novelty the wideest corresponding to scope.

Claims (7)

1. the setting device of a metallurgical crane in bridge type is used for the main carriage (1) of metallurgical crane in bridge type, it is characterized in that, comprising:
Platform (01);
Be arranged on a plurality of pillars (02) on the top end face of said platform (01), these a plurality of pillars (02) segmentation beam (14) He Cheliang (13) with connecting panel (12) both sides of said main carriage (1) respectively are corresponding;
Being arranged on said pillar (02) goes up to adjust the jack (03) of said segmentation beam (14) He Cheliang (13) relative height;
Measure a reductor (6) of said main carriage (1) and the measuring tool of secondary speed-reducing machine (7) axle center, junction deviation;
Measure the level indicator of the car beam (13) of said main carriage (1).
2. the setting device of metallurgical crane in bridge type according to claim 1 is characterized in that, said platform (01) is provided with the I-beam section (04) of the top end face that supports said platform (01).
3. the setting device of metallurgical crane in bridge type according to claim 2 is characterized in that, also comprises the auxiliary support frame (05) that supports said platform (01).
4. the setting device of metallurgical crane in bridge type according to claim 3 is characterized in that, also comprises the stop block (06) of the wheel (15) of fixing said main carriage (1).
5. the setting device of metallurgical crane in bridge type according to claim 1 is characterized in that, between said platform (01) and the said pillar (02) for being threaded or welding.
6. the setting device of metallurgical crane in bridge type according to claim 1 is characterized in that, said jack (03) supports segmentation beam (14) He Cheliang (13) of said main carriage (1) through backing plate (08).
7. the setting device of metallurgical crane in bridge type according to claim 1 is characterized in that, the quantity of said pillar (02) is 8.
CN2011204342495U 2011-11-04 2011-11-04 Adjusting device of metallurgic overhead crane Withdrawn - After Issue CN202358847U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204342495U CN202358847U (en) 2011-11-04 2011-11-04 Adjusting device of metallurgic overhead crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204342495U CN202358847U (en) 2011-11-04 2011-11-04 Adjusting device of metallurgic overhead crane

Publications (1)

Publication Number Publication Date
CN202358847U true CN202358847U (en) 2012-08-01

Family

ID=46570051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204342495U Withdrawn - After Issue CN202358847U (en) 2011-11-04 2011-11-04 Adjusting device of metallurgic overhead crane

Country Status (1)

Country Link
CN (1) CN202358847U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102358576A (en) * 2011-11-04 2012-02-22 吉林建龙钢铁有限责任公司 Adjusting device of metallurgical bridge crane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102358576A (en) * 2011-11-04 2012-02-22 吉林建龙钢铁有限责任公司 Adjusting device of metallurgical bridge crane

Similar Documents

Publication Publication Date Title
CN201825671U (en) Hoisting trolley for track plate
CN105152032A (en) Installing method for bridge crane in enclosed environment workshop
CN203793390U (en) Mobile car for mounting guide rail rack
CN204430250U (en) Hydraulic elevation type steel ladle pouring car
CN102358576B (en) Adjusting device of metallurgical bridge crane
CN203247031U (en) Hoisting device for curtain board transporting
CN106988314A (en) A kind of counter weight type formwork jumbo, counter weight type outrigger platform, and construction method
CN202358847U (en) Adjusting device of metallurgic overhead crane
CN102535869B (en) Steel structure hoisting sliding track device and construction method
CN201999647U (en) Ladle crane with structure of two trolleys and two main beams
CN203021186U (en) Crane and trolley frame thereof
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN104729644A (en) Online weighing device for steel billets
CN208083727U (en) A kind of efficient welding hoistable platform
CN102910539A (en) Hoisting structure for replacing main transmission shaft or driving device of escalator
CN213011602U (en) Gantry tool for equipment installation and transportation
CN204495448U (en) A kind of steel billet meausring apparatus of steel rolling production-line
CN205114879U (en) Special hoist of aluminium alloy with lift dolly
CN201265028Y (en) Special-purpose tool for changing fibre roller
CN211191999U (en) L type steel ladle car and ladle storage device
CN104827264B (en) Flexible transverse displacement platform for rail vehicles
CN103287986A (en) Curtain board transport lifting device and method for mounting curtain board by using device
CN203471239U (en) Auxiliary welding device for cargo boom of tower crane
CN202245924U (en) Pit type framework tipper of rail transit rolling stock
CN212151352U (en) Guide mechanism of crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20120801

Effective date of abandoning: 20131030

RGAV Abandon patent right to avoid regrant