CN202353013U - Distribution equipment cabinet and busbar chamber structure - Google Patents

Distribution equipment cabinet and busbar chamber structure Download PDF

Info

Publication number
CN202353013U
CN202353013U CN2011202869352U CN201120286935U CN202353013U CN 202353013 U CN202353013 U CN 202353013U CN 2011202869352 U CN2011202869352 U CN 2011202869352U CN 201120286935 U CN201120286935 U CN 201120286935U CN 202353013 U CN202353013 U CN 202353013U
Authority
CN
China
Prior art keywords
bus
bar room
busbar
equipment cabinet
switching equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202869352U
Other languages
Chinese (zh)
Inventor
朱岩松
石耀泉
池才坤
林天玩
黄邦勇
黄晓斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Nanyue Electric Co Ltd
Original Assignee
Guangdong Nanyue Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Nanyue Electric Co Ltd filed Critical Guangdong Nanyue Electric Co Ltd
Priority to CN2011202869352U priority Critical patent/CN202353013U/en
Application granted granted Critical
Publication of CN202353013U publication Critical patent/CN202353013U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Patch Boards (AREA)

Abstract

The utility model relates to a distribution equipment cabinet and busbar chamber structure. The structure comprises a distribution equipment cabinet body, wherein a busbar chamber is arranged at the upper part of the distribution equipment cabinet body, and the busbar chamber is provided with a left upper beam, a right upper beam, a top cover plate and a bottom plate; upright posts are respectively arranged at four corners of the busbar chamber, panels are respectively arranged on the front side surface and the rear side surface of the busbar chamber, and the left side surface and the right side surface of the busbar chamber are hollow; a busbar clamp is installed in the busbar chamber, and a busbar groove is formed on the busbar clamp; the busbar clamp comprises an upper half clamp and a lower half clamp, the lower half clamp is fixedly installed on the bottom plate, and the upper half clamp is detachably installed on the lower half clamp; the top cover plate is detachably installed on the top surface of the busbar chamber by bolts; and the left upper beam is detachably installed between the two upright posts at left side by bolts, and the right upper beam is detachably installed between the two upright posts at right side by bolts. According to the utility model, the field installation of the main busbar is easy and convenient, the number of the overlap joints of the busbar is reduced, the copper material is saved, and the normal operation of the equipment is facilitated.

Description

Controller switching equipment cabinet bus-bar room structure
Technical field
The utility model belongs to the technical field of low-voltage distribution apparatus, is specifically related to a kind of controller switching equipment cabinet bus-bar room structure.
Background technology
In the power supply-distribution system, multi-form system is formed by different controller switching equipment unit combination, and each controller switching equipment unit is a station power distribution cabinet, in system, shares the different functions task.In whole system, there is the main bus rod of a cover to run through each distribution cabinet, to realize the continuous of power supply and to distribute.It is indoor that main bus rod is positioned at the upper bus of distribution cabinet, and only after all distribution cabinet in erecting bed and cabinet were accomplished, main bus rod just can be installed.Traditional installation method is that main bus rod is tiltedly pierced in the upper frame of distribution cabinet from the side of deploying electricity equipment, and this mode of operation is inconvenience very, wastes time and energy; And usually owing to the too little reason in switchgear house space; The length of master's bus rod is restricted during installation, can only segmentation overlap, and has increased the lap joint quantity of bus like this; Increased the faying surface of bus, wasted material and aggravated the equipment heating degree.
Summary of the invention
The purpose of the utility model is to overcome above-mentioned shortcoming and a kind of controller switching equipment cabinet bus-bar room structure is provided, and it can make the scene installation of main bus rod easy and convenient, and has reduced the lap joint quantity of bus, saves copper material, helps equipment and normally moves.
Its purpose can realize by following scheme: this controller switching equipment cabinet bus-bar room structure comprises the controller switching equipment cabinet, and controller switching equipment cabinet top is provided with bus-bar room, and bus-bar room is provided with upper left beam, upper right beam, lamina tecti, base plate; Bus-bar room is respectively equipped with column for four jiaos, and leading flank, the trailing flank of bus-bar room are respectively equipped with panel, the left surface of bus-bar room and right flank hollow out; Bus clip is installed in the bus-bar room, and bus clip is formed with bus duct; Its main feature is that said bus clip comprises first folder, second folder, and second clamping Dingan County is contained on the base plate, and first folder detachably is installed in second above folder; Lamina tecti utilizes bolt detachably to be installed in the bus-bar room end face; Upper left beam utilizes bolt detachably to be installed between two root posts of the left side, and upper right beam utilizes bolt detachably to be installed between two root posts of the right.
Be preferably, two root post tops, the left side are fixedly connected with horizontal short beam respectively, and two root post tops, the right also are fixedly connected with horizontal short beam respectively; Said upper left beam utilizes connecting plate and bolt to removably connect between two horizontal short beams of on the left side, and said upper right beam utilizes connecting plate and bolt to removably connect on the right between two horizontal short beams.
Bus-bar room is provided with preceding upper beam, put the beams in place in the back; Be respectively equipped with right-angled triangle at four corner positions of bus-bar room and prop up seat board, wherein right-angle side that every right-angled triangle props up seat board is fixedly mounted on the horizontal short beam, and another right-angle side is fixedly mounted on puts the beams in place before corresponding or above the back puts the beams in place.
The utlity model has following advantage and effect:
The controller switching equipment cabinet bus-bar room structure of the utility model; Make the scene installation of power supply-distribution system master bus rod become easy and convenient, can main bus rod be inserted directly over each station power distribution cabinet the bus duct simultaneously, the length of every section bus of power supply-distribution system does not receive the restriction of operating surface like this; Reduce lap joint quantity; Save copper material, alleviated the degree of heat, helped the normal operation of equipment.
Description of drawings
Fig. 1 is the side schematic view of controller switching equipment cabinet bus-bar room structure.
Fig. 2 is the schematic top plan view of controller switching equipment cabinet bus-bar room structure.
Fig. 3 is the syndeton sketch map of a left side (right side) upper beam and horizontal short beam.
Fig. 4 is an A-A cross-sectional view among Fig. 3.
Fig. 5 is the side schematic view with the controller switching equipment cabinet bus-bar room structure after first folder among Fig. 1, upper left beam, upper right beam, the lamina tecti dismounting.
Fig. 6 is that the head-down position after each station power distribution cabinet and cabinet are installed concerns sketch map.
Embodiment
Fig. 1, Fig. 2, shown in Figure 5; This controller switching equipment cabinet bus-bar room structure comprises controller switching equipment cabinet 20; Controller switching equipment cabinet 20 tops are provided with bus-bar room 5, and bus-bar room is respectively equipped with column 1 for 5 four jiaos, and the leading flank of bus-bar room is provided with front panel 14; Trailing flank is provided with rear board 13, the left surface of bus-bar room and right flank hollow out (not having panel); Bus-bar room 5 is provided with that upper left beam 22, upper right beam 21, preceding upper beam 24, back put the beams in place 23, lamina tecti 3, base plate 12; Bus clip 6 is installed in the bus-bar room, and bus clip is formed with bus duct 62; Said bus clip comprises first folder 61, second folder 63, and second folder 63 is fixedly mounted on the base plate 12, and first folder 61 detachably is installed in second above folder 63.Two root posts, 1 top, the left side is fixedly connected with horizontal short beam 11 respectively, and two root posts, 1 top, the right also is fixedly connected with horizontal short beam 11 respectively; Fig. 1, Fig. 3, shown in Figure 4, said upper left beam 22 utilize connecting plate 8 and bolt 9 to removably connect between two horizontal short beams 11 of on the left side, and said upper right beam 21 utilizes connecting plate 8 and bolt 9 to removably connect on the right between two horizontal short beams 11.Be respectively equipped with right-angled triangle at four corner positions of bus-bar room and prop up seat board 4, wherein right-angle side that every right-angled triangle props up seat board 4 is fixedly mounted on the horizontal short beam 11, another right-angle side be fixedly mounted on put the beams in place before corresponding 24 or the back put the beams in place above 23.Lamina tecti 3 utilizes bolt 10 detachably to be installed in bus-bar room 5 end faces, and wherein bolt 10 is screwedly mounted on upper left beam 22, upper right beam 21, preceding upper beam 24, back respectively and puts the beams in place on 23.
The foregoing description use and principle are following:
In the erecting bed, after one one distribution cabinet 20 from left to right and cabinet installs, it was whole and form a power supply-distribution system to be linked to be a row, as shown in Figure 6.And after the cabinet installation, power supply-distribution system need be installed cabinet and push up main bus rod 7, and its operating process is following: pull down six bolts 10 that lamina tecti is installed, take off lamina tecti 3.(cabinet pushes up four jiaos right-angled triangle and props up seat board 4 and fuse with column 1, does not need dismounting); Then pull down the bolt of putting the beams in place and to be connected in a connecting plate 8 and a left side (right side) 9, take off upper left beam 22, upper right beam 21; Again next; Pull down first folder 61 of bus clip 6; The cabinet of each distribution cabinet of whole power supply-distribution system top was all as shown in Figure 5 after dismounting was accomplished; At this moment, can directly over the cabinet top, put the main bus rod 7 that runs through each station power distribution cabinet 20 of whole system simultaneously into the bus duct 62 of each station power distribution cabinet bus clip 6 of whole system like a cork, therefore main bus rod 7 no longer needs the segmentation overlap joint; As shown in Figure 6, last successively with first folder 61, upper left beam 22, upper right beam 21, lamina tecti 3 reinstalls of bus clip 6.So far, the on-the-spot installation of main bus rod 7, as shown in Figure 6.

Claims (3)

1. a controller switching equipment cabinet bus-bar room structure comprises the controller switching equipment cabinet, and controller switching equipment cabinet top is provided with bus-bar room, and bus-bar room is provided with upper left beam, upper right beam, lamina tecti, base plate; Bus-bar room is respectively equipped with column for four jiaos, and leading flank, the trailing flank of bus-bar room are respectively equipped with panel, the left surface of bus-bar room and right flank hollow out; Bus clip is installed in the bus-bar room, and bus clip is formed with bus duct; It is characterized in that: said bus clip comprises first folder, second folder, and second clamping Dingan County is contained on the base plate, and first folder detachably is installed in second above folder; Lamina tecti utilizes bolt detachably to be installed in the bus-bar room end face; Upper left beam utilizes bolt detachably to be installed between two root posts of the left side, and upper right beam utilizes bolt detachably to be installed between two root posts of the right.
2. controller switching equipment cabinet bus-bar room structure according to claim 1 is characterized in that: two root post tops, the left side are fixedly connected with horizontal short beam respectively, and two root post tops, the right also are fixedly connected with horizontal short beam respectively; Said upper left beam utilizes connecting plate and bolt to removably connect between two horizontal short beams of on the left side, and said upper right beam utilizes connecting plate and bolt to removably connect on the right between two horizontal short beams.
3. controller switching equipment cabinet bus-bar room structure according to claim 2 is characterized in that: bus-bar room is provided with preceding upper beam, put the beams in place in the back; Be respectively equipped with right-angled triangle at four corner positions of bus-bar room and prop up seat board, wherein right-angle side that every right-angled triangle props up seat board is fixedly mounted on the horizontal short beam, and another right-angle side is fixedly mounted on puts the beams in place before corresponding or above the back puts the beams in place.
CN2011202869352U 2011-08-04 2011-08-04 Distribution equipment cabinet and busbar chamber structure Expired - Fee Related CN202353013U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202869352U CN202353013U (en) 2011-08-04 2011-08-04 Distribution equipment cabinet and busbar chamber structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202869352U CN202353013U (en) 2011-08-04 2011-08-04 Distribution equipment cabinet and busbar chamber structure

Publications (1)

Publication Number Publication Date
CN202353013U true CN202353013U (en) 2012-07-25

Family

ID=46541978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202869352U Expired - Fee Related CN202353013U (en) 2011-08-04 2011-08-04 Distribution equipment cabinet and busbar chamber structure

Country Status (1)

Country Link
CN (1) CN202353013U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103384047A (en) * 2013-06-28 2013-11-06 安徽明远电力设备制造有限公司 Power distribution cabinet framework
CN104253379A (en) * 2014-09-30 2014-12-31 江苏银佳企业集团有限公司 Low-voltage power distribution structure cabinet
CN108173124A (en) * 2017-12-19 2018-06-15 江苏宜源电力设备有限公司 A kind of parallel high-pressure bottle cabinet

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103384047A (en) * 2013-06-28 2013-11-06 安徽明远电力设备制造有限公司 Power distribution cabinet framework
CN103384047B (en) * 2013-06-28 2016-06-08 安徽明远电力设备制造有限公司 A kind of distributing cabinet frame
CN104253379A (en) * 2014-09-30 2014-12-31 江苏银佳企业集团有限公司 Low-voltage power distribution structure cabinet
CN108173124A (en) * 2017-12-19 2018-06-15 江苏宜源电力设备有限公司 A kind of parallel high-pressure bottle cabinet

Similar Documents

Publication Publication Date Title
CN205609621U (en) Move on -vehicle battery charging outfit and battery pack structure thereof
CN202353013U (en) Distribution equipment cabinet and busbar chamber structure
CN104032962B (en) Corner wayside pavilion assemble method moulded by wood
CN102496640A (en) K-shaped support with angle-adjustable supporting surface
CN107453264A (en) Rack prefabricated cabin and secondary device integration module
CN204067925U (en) The adjustable switch cubicle of a kind of dividing plate
CN203800385U (en) Super capacitor cabinet
CN209585740U (en) A kind of adjustable solar carport
CN208291195U (en) A kind of power battery frame
CN205039189U (en) Pull formula storage battery frame
CN203496746U (en) Mobile photovoltaic-illuminating trailer
CN105728593B (en) The bending tightening device of insert row line binding machine
CN104032977B (en) Corner wayside pavilion moulded by wood
CN201282290Y (en) Clamper for assembling top and bottom frame of low-voltage matched set switch cabinet body
CN202678337U (en) Solar panel tile type connecting structure
CN205023094U (en) Frame
CN205265596U (en) Novel solar cell panel mounting structure
CN206306967U (en) A kind of electric-control system mounting bracket in new-energy automobile
CN202902674U (en) Solar energy collecting panel capable of being turned and folded on convex-concave surface
CN202678361U (en) Tile solar photovoltaic module
CN202695474U (en) Foldable support for photovoltaic module
CN202839648U (en) Single-column impact stake solar stand
CN207878860U (en) A kind of novel raised flooring
CN204144678U (en) Low-voltage distribution structure cabinet
CN205303954U (en) LC filtering compensation module

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120725

Termination date: 20140804

EXPY Termination of patent right or utility model