CN202337970U - 用于导流洞的封堵结构 - Google Patents

用于导流洞的封堵结构 Download PDF

Info

Publication number
CN202337970U
CN202337970U CN2011204915482U CN201120491548U CN202337970U CN 202337970 U CN202337970 U CN 202337970U CN 2011204915482 U CN2011204915482 U CN 2011204915482U CN 201120491548 U CN201120491548 U CN 201120491548U CN 202337970 U CN202337970 U CN 202337970U
Authority
CN
China
Prior art keywords
diversion tunnel
plug
permanent
tunnel
permanent plug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011204915482U
Other languages
English (en)
Inventor
刘国勇
龙军飞
付峥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group filed Critical Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority to CN2011204915482U priority Critical patent/CN202337970U/zh
Application granted granted Critical
Publication of CN202337970U publication Critical patent/CN202337970U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

本实用新型公开了一种用于导流洞的封堵结构,适合在汛期进行施工。该封堵结构包括导流洞,所述导流洞包括进水口,所述导流洞内设置有封堵区域,所述封堵区域内设置有用于封堵导流洞的临时堵头和永久堵头,所述临时堵头位于永久堵头与导流洞的进水口之间。永久堵头对应的导流洞的洞壁的外侧沿洞壁周向设置有混凝土灌浆层。由于设置有临时堵头,适合在汛期对永久堵头进行施工,汛期在对永久堵头施工时安全性得到有效保证,有利于永久堵头的顺利施工。

Description

用于导流洞的封堵结构
技术领域
本实用新型涉及一种用于导流洞的封堵结构。
背景技术
现有的用于导流洞的封堵结构一般是在导流洞内的封堵区内浇筑有永久堵头,通过永久堵头将导流洞封堵。上述用于导流洞的封堵结构只适合在枯水期进行施工。但目前较多工程实施阶段提前具备下闸蓄水条件,若实现提前蓄水发电,则工程经济效益显著,由此要求导流洞下闸及封堵调整为汛期进行,但现有技术中的这种用于导流洞的封堵结构不适合在汛期进行施工,如按照现有技术中的这种用于导流洞的封堵结构进行施工,则安全风险较大。
实用新型内容
本实用新型解决的技术问题是提供一种适合在汛期进行施工的用于导流洞的封堵结构。
本实用新型解决其技术问题所采用的技术方案是:用于导流洞的封堵结构,包括导流洞,所述导流洞包括进水口,所述导流洞内设置有封堵区域,所述封堵区域内设置有用于封堵导流洞的临时堵头和永久堵头,所述临时堵头位于永久堵头与导流洞的进水口之间。
进一步的是:所述永久堵头对应的导流洞的洞壁的外侧沿洞壁周向设置有混凝土灌浆层。
进一步的是:所述永久堵头的横截面积至少有一处大于封堵区域两端对应的导流洞横截面积。
本实用新型的有益效果是:由于设置有临时堵头,适合在汛期对永久堵头进行施工,汛期在对永久堵头施工时安全性得到有效保证,有利于永久堵头的顺利施工。
附图说明
图1为本实用新型的用于导流洞的封堵结构的示意图。
图中标记为:进水口1,导流洞2,临时堵头3,永久堵头4,混凝土灌浆层5,封堵区域6。
具体实施方式
下面结合附图和具体实施方式对本实用新型进一步说明。
如图1所示,本实用新型的用于导流洞的封堵结构,包括导流洞2,所述导流洞2包括进水口1,所述导流洞2内设置有封堵区域6,所述封堵区域6内设置有用于封堵导流洞的临时堵头3和永久堵头4,所述临时堵头3位于永久堵头4与导流洞的进水口1之间。
为了使施工过程更加安全可靠,所述永久堵头4对应的导流洞的洞壁的外侧沿洞壁周向设置有混凝土灌浆层5。
另外,如图1所示,所述永久堵头4的横截面积至少有一处大于封堵区域6两端对应的导流洞横截面积。由于永久堵头的横截面积至少有一处大于封堵区域两端的导流洞横截面积,能够将永久堵头卡在导流洞内,从而保证永久堵头稳定,因而这种封堵结构只需很短的永久堵头即可实现导流洞的封堵,在浇筑永久堵头的过程中容易控制堵头的温度,而且施工方便,能够缩短施工工期,另外,还能够节约成本。
汛期施工时,临时堵头布置上宜紧邻永久堵头。导流洞下闸后立即开始施工临时堵头,临时堵头施工期间应保证上游水位不超过原设计水位,临时堵头的施工可不考虑温控要求,但建议采用低热水泥混凝土,临时堵头越早施工完毕,对提前实现蓄水目标越有利。临时堵头施工的同时进行永久堵头段洞身结构的加固固结灌浆施工,也就是对上述混凝土灌浆层进行施工,这样可避免临时堵头挡高外水时洞身因结构渗水量大等因素影响施工。在完成临时堵头后可进行永久堵头的施工,同时水库可开始蓄水并提前实现发电目标,取得可观的经济和社会效益。

Claims (3)

1.用于导流洞的封堵结构,包括导流洞(2),所述导流洞(2)包括进水口(1),所述导流洞(2)内设置有封堵区域(6),其特征是:所述封堵区域(6)内设置有用于封堵导流洞的临时堵头(3)和永久堵头(4),所述临时堵头(3)位于永久堵头(4)与导流洞的进水口(1)之间。
2.如权利要求1所述的用于导流洞的封堵结构,其特征是:所述永久堵头(4)对应的导流洞的洞壁的外侧沿洞壁周向设置有混凝土灌浆层(5)。
3.如权利要求1或2所述的用于导流洞的封堵结构,其特征是:所述永久堵头(4)的横截面积至少有一处大于封堵区域(6)两端对应的导流洞横截面积。
CN2011204915482U 2011-12-01 2011-12-01 用于导流洞的封堵结构 Expired - Lifetime CN202337970U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204915482U CN202337970U (zh) 2011-12-01 2011-12-01 用于导流洞的封堵结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204915482U CN202337970U (zh) 2011-12-01 2011-12-01 用于导流洞的封堵结构

Publications (1)

Publication Number Publication Date
CN202337970U true CN202337970U (zh) 2012-07-18

Family

ID=46486668

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204915482U Expired - Lifetime CN202337970U (zh) 2011-12-01 2011-12-01 用于导流洞的封堵结构

Country Status (1)

Country Link
CN (1) CN202337970U (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103993586A (zh) * 2014-05-26 2014-08-20 中国电建集团成都勘测设计研究院有限公司 水工隧洞结构及其开启方法
CN104563069A (zh) * 2014-12-16 2015-04-29 成都绿迪科技有限公司 导流洞下闸结构
CN104790356A (zh) * 2015-05-08 2015-07-22 中国电建集团成都勘测设计研究院有限公司 导流洞封堵施工期贯通情况监测结构
CN104963324A (zh) * 2015-05-29 2015-10-07 中国电建集团贵阳勘测设计研究院有限公司 一种导流洞封堵头排气结构及其排气方法
CN105839604A (zh) * 2016-05-19 2016-08-10 中国电建集团成都勘测设计研究院有限公司 导流洞快速封堵结构及其封堵方法
CN107313785A (zh) * 2017-08-23 2017-11-03 中国电建集团成都勘测设计研究院有限公司 高坝生态供水洞封堵段衬砌结构
CN108894184A (zh) * 2018-07-27 2018-11-27 中国电建集团成都勘测设计研究院有限公司 特高坝水库蓄水方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103993586A (zh) * 2014-05-26 2014-08-20 中国电建集团成都勘测设计研究院有限公司 水工隧洞结构及其开启方法
CN104563069A (zh) * 2014-12-16 2015-04-29 成都绿迪科技有限公司 导流洞下闸结构
CN104790356A (zh) * 2015-05-08 2015-07-22 中国电建集团成都勘测设计研究院有限公司 导流洞封堵施工期贯通情况监测结构
CN104963324A (zh) * 2015-05-29 2015-10-07 中国电建集团贵阳勘测设计研究院有限公司 一种导流洞封堵头排气结构及其排气方法
CN105839604A (zh) * 2016-05-19 2016-08-10 中国电建集团成都勘测设计研究院有限公司 导流洞快速封堵结构及其封堵方法
CN105839604B (zh) * 2016-05-19 2018-03-06 中国电建集团成都勘测设计研究院有限公司 用于初期蓄水的导流洞封堵结构及导流洞快速封堵方法
CN107313785A (zh) * 2017-08-23 2017-11-03 中国电建集团成都勘测设计研究院有限公司 高坝生态供水洞封堵段衬砌结构
CN107313785B (zh) * 2017-08-23 2023-08-22 中国电建集团成都勘测设计研究院有限公司 高坝生态供水洞封堵段衬砌结构
CN108894184A (zh) * 2018-07-27 2018-11-27 中国电建集团成都勘测设计研究院有限公司 特高坝水库蓄水方法

Similar Documents

Publication Publication Date Title
CN202337970U (zh) 用于导流洞的封堵结构
CN203891031U (zh) 一种钢管桩连续墙及其辅助施工桩架
CN202298577U (zh) 导流洞封堵结构
CN102011407B (zh) 输电线路塔基群锚基础全断面重复注浆方法
CN203296026U (zh) 用于导流洞下闸和封堵后的排气装置
CN202954439U (zh) 一种外墙螺栓孔堵漏塞
CN103046534B (zh) 一种提高地基承载力的方法
CN204252119U (zh) X异型支护桩结构
CN204282360U (zh) 一种覆盖层预应力锚固结构
CN105332716B (zh) 可承受高内外水同时作用的自适应衬砌结构
CN204941551U (zh) 一种曲线顶管支护结构扩建盾构施工的地铁车站
CN203729280U (zh) 一种低水头导流洞封堵下闸挡水结构
CN205100992U (zh) 可承受高内外水同时作用的自适应衬砌结构
CN204326061U (zh) 一种易拔出的管桩
CN104452755A (zh) 蜂窝式薄壁钢管及采用蜂窝式薄壁钢管的微型桩施工方法
CN204139190U (zh) 一种可吊装预制砖胎膜
CN204551464U (zh) 扩大头囊式锚杆
CN204475320U (zh) 一种螺丝桩
CN201620514U (zh) 一种自锁式挡土块
CN203716116U (zh) 一种用于导流洞混凝土堵头顶拱回填灌浆的止浆结构
CN202073107U (zh) 一种降水井封闭结构
CN203145028U (zh) 一种波纹管集水井
CN203369232U (zh) 组装式可控温水产养殖装置
CN205776251U (zh) 一种毛竹桩复合smw工法桩型钢早拔体系
CN204551367U (zh) 一种小流量岩质排水洞结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Patentee after: Chengdu Hydroelectric Investigation & Design Institute of SPC

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Patentee before: Chengdu Hydroelectric Investigation & Design Institute of China Hydropower Consu

C56 Change in the name or address of the patentee

Owner name: CHINA POWER GROUP CHENGDU INVESTIGATION DESIGN + R

Free format text: FORMER NAME: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC

CP01 Change in the name or title of a patent holder

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Patentee after: Co., Ltd of Chengdu survey and design academy of electricity Jian group of China

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Patentee before: Chengdu Hydroelectric Investigation & Design Institute of SPC

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120718