CN202331201U - 调度自动化模拟厂站系统 - Google Patents
调度自动化模拟厂站系统 Download PDFInfo
- Publication number
- CN202331201U CN202331201U CN2011205092355U CN201120509235U CN202331201U CN 202331201 U CN202331201 U CN 202331201U CN 2011205092355 U CN2011205092355 U CN 2011205092355U CN 201120509235 U CN201120509235 U CN 201120509235U CN 202331201 U CN202331201 U CN 202331201U
- Authority
- CN
- China
- Prior art keywords
- signal generator
- analog signal
- dispatching automation
- station
- station system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Testing And Monitoring For Control Systems (AREA)
Abstract
本实用新型设计的目标主要是在调度自动化主站改造中变电站厂站不具备调试条件的情况下通过系统模拟仿真厂站设备进行调试,确保调度自动化主站的正确性。为达到所述效果,本实用新型调度自动化模拟厂站系统,包括模拟信号发生器,所述模拟信号发生器连接有遥信变位信号发生器以及SOE信号发生器,模拟信号发生器上设有遥控操作面板,模拟信号发生器上还设有至少一种通讯接口。通过所述的结构,本实用新型一种调度自动化模拟厂站系统不用连接其他设备,只要直接连接所需测试的变电站控制系统,就能提供各种遥信变位信号、SOE信号,直接进行控制测试。模拟测试合格后就可以直接将变电站投入使用。
Description
技术领域
本实用新型涉及一种变电站网络调试系统,尤其涉及一种调度自动化模拟厂站系统。
背景技术
根据国家电网公司建设坚强智能电网的战略部署和地区电网的发展需要,以及网络技术在电网中的应用,传统的基于音频电缆方式远动通道由于自身的局限性已经满足不了电网的发展需求,电网将采用网络方式接入主站,传统的基于音频电缆方式远动通道也将逐步实施改造。通道改造或接入后,为保证主站与厂站间的正常通信需要进行大量调试工作。在调试过程中由于厂站设备都是运行设备为确保及时、安全的完成工作,需解决如下问题:1、工期紧:改造过程中不可能有很长得停电时间供技术人员调试,必须缩短改造工期。2、工作量大:现各级变电站已遍布城市和农村的各个角落,要将各个变电站得自动化全部改造其工作量之大可想而知。3、厂站均为运行设备:在调试过程中由于各个厂站都是运行设备,在对主站系统调试的时候,厂站遥信,遥测数据也无法模拟给主站系统,主站不能随便做遥控试验。但是没有调试过的厂站是不能直接投入使用的,这样就需要使用一套调试系统设备来模拟调试,确保整个厂站能安全无误地运行。
实用新型内容
本实用新型设计的目标主要是在调度自动化主站改造中变电站厂站不具备调试条件的情况下通过系统模拟仿真厂站设备进行调试,确保调度自动化主站的正确性。
为达到所述效果,本实用新型调度自动化模拟厂站系统,包括模拟信号发生器,所述模拟信号发生器连接有遥信变位信号发生器以及SOE信号发生器,模拟信号发生器上设有遥控操作面板,模拟信号发生器上还设有至少一种通讯接口。
优选的,所述模拟信号发生器上还连接设有噪声干扰模拟发生器。这样的结构能发出模拟干扰信号,用于仿真在信号传输过程中可能碰到的干扰,进一步检验信号的抗干扰能力。
优选的,所述所述模拟信号发生器上设置有显示装置。这样的结构能脱离计算机的辅助,直接在模拟信号发生器上进行操作。
优选的,所述模拟信号发生器上所设的通讯接口为串口。这样的接口为标准接口,更符合实际模拟的效果。
优选的,所述模拟信号发生器上所设的通讯接口为以太网连接口。这样的接口传输量大,传输速度快,能够方便在短时间内进行大量的测试。
通过所述的结构,本实用新型一种调度自动化模拟厂站系统不用连接其他设备,只要直接连接所需测试的变电站控制系统,就能提供各种遥信变位信号、SOE信号,直接进行控制测试。模拟测试合格后就可以直接将变电站投入使用。
附图说明
下面结合附图对本实用新型作进一步说明:
图1为本实用新型一种调度自动化模拟厂站系统的整体示意图。
具体实施方式
如图1所示,调度自动化模拟厂站系统,包括模拟信号发生器1,所述模拟信号发生器1连接有遥信变位信号发生器2以及SOE信号发生器3,模拟信号发生器1上设有遥控操作面板4,模拟信号发生器1上还设有至少一种通讯接口5。所述模拟信号发生器1上还连接设有噪声干扰模拟发生器6。所述所述模拟信号发生器1上设置有显示装置。所述模拟信号发生器1上所设的通讯接口5为串口。所述模拟信号发生器1上所设的通讯接口5为以太网连接口。
通过这样的结构,本实用新型通过模拟信号发生器1中的遥信变位信号发生器2以及SOE信号发生器3,分别产生普通的遥信变位信号和SOE信号,供厂站进行接受。SOE(Sequence Of Event)为事件顺序记录系统,记录故障发生的时间和事件的类型。遥信变位信号发生器2以及SOE信号发生器3能提供一个模拟测试信号供测试使用。
为了提高测试的效果,所述模拟信号发生器1上还连接设有噪声干扰模拟发生器6。这样的结构能对模拟信号发生器1产生的信号进行加噪声等干扰的模拟,更能防止意外的发生。
所述所述模拟信号发生器1上设置有显示装置,这样在测试的时候如果没有便携电脑等设备,也能正常进行观察。
上所设的通讯接口5为串口,用于标准接口的检测。所述模拟信号发生器1上所设的通讯接口5也可以采用以太网连接口,可以提高数据传输量,加强高负载下的处理检测。
本实用新型相应遥控操作等操作测试调度变电站厂站的通道配置,数据点表配置。遥控配置正确与否,可根据各个厂站的情况选择不同的远动规约。这样在不具备测试条件的情况下可以直接采用本实用新型进行模拟检测,节省了成本,提高了检测效率。
Claims (5)
1.调度自动化模拟厂站系统,其特征在于,包括模拟信号发生器(1),所述模拟信号发生器(1)连接有遥信变位信号发生器(2)以及SOE信号发生器(3),模拟信号发生器(1)上设有遥控操作面板(4),模拟信号发生器(1)上还设有至少一种通讯接口(5)。
2.如权利要求1所述的调度自动化模拟厂站系统,其特征在于:所述模拟信号发生器(1)上还连接设有噪声干扰模拟发生器(6)。
3.如权利要求1所述的调度自动化模拟厂站系统,其特征在于:所述所述模拟信号发生器(1)上设置有显示装置。
4.如权利要求1所述的调度自动化模拟厂站系统,其特征在于:所述模拟信号发生器(1)上所设的通讯接口(5)为串口。
5.如权利要求1所述的调度自动化模拟厂站系统,其特征在于:所述模拟信号发生器(1)上所设的通讯接口(5)为以太网连接口。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205092355U CN202331201U (zh) | 2011-12-08 | 2011-12-08 | 调度自动化模拟厂站系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205092355U CN202331201U (zh) | 2011-12-08 | 2011-12-08 | 调度自动化模拟厂站系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202331201U true CN202331201U (zh) | 2012-07-11 |
Family
ID=46443175
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011205092355U Expired - Fee Related CN202331201U (zh) | 2011-12-08 | 2011-12-08 | 调度自动化模拟厂站系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202331201U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102445942A (zh) * | 2011-12-08 | 2012-05-09 | 湖州电力局 | 调度自动化模拟厂站系统 |
-
2011
- 2011-12-08 CN CN2011205092355U patent/CN202331201U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102445942A (zh) * | 2011-12-08 | 2012-05-09 | 湖州电力局 | 调度自动化模拟厂站系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101727106B (zh) | 数字化变电站过程层仿真测试平台 | |
CN101546472B (zh) | 电网调度和电量采集一体化通用模拟测试系统的实施方法 | |
CN102999425B (zh) | 基于虚拟仪器技术的星务软件仿真测试系统 | |
CN103925853B (zh) | 一种运载火箭地面测试系统装置 | |
CN103235223B (zh) | 一种基于rtds的微电网试验测试平台 | |
CN104570768A (zh) | 基于Rt-Lab和OPNET的信息物理半实物仿真系统 | |
CN103076520A (zh) | 智能变电站二次系统动态模拟仿真检测平台和模拟仿真方法 | |
CN102184749A (zh) | 一种dcs控制柜的自动测试方法 | |
CN109491371A (zh) | 一种用于车载atc系统测试的装置 | |
CN105242154B (zh) | 一种配电终端的自动化测试装置 | |
CN104407606A (zh) | 基于rtds的广域远程测试安稳试验系统 | |
CN103837785A (zh) | 馈线自动化检测模拟系统 | |
CN205301911U (zh) | 一种嵌入式故障注入控制系统 | |
CN103676661B (zh) | 多功能仿真验证系统及其仿真验证方法 | |
CN203178388U (zh) | 一种基于rtds的微电网试验测试平台 | |
CN105203870A (zh) | 一种基于电力线通信的智能变电站二次设备集成测试系统 | |
CN104184208A (zh) | 变电站综合自动化信息校对系统 | |
CN104076805A (zh) | 配电网自动控制设备的测试系统 | |
CN103676669B (zh) | 一种远动信息的校核方法及校核系统 | |
CN210244682U (zh) | 一种电力营销仿真培训系统 | |
CN203191816U (zh) | 配电网自动控制设备的测试系统 | |
CN202331201U (zh) | 调度自动化模拟厂站系统 | |
US20230336122A1 (en) | Hil testing platform for photovoltaic power station, and ppc performance testing method | |
CN206451035U (zh) | 一种卫星控制系统地面测试设备自动化联调装置 | |
CN102445942A (zh) | 调度自动化模拟厂站系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120711 Termination date: 20191208 |