CN202327365U - Support device for connecting pipeline to base and concrete conveying equipment - Google Patents
Support device for connecting pipeline to base and concrete conveying equipment Download PDFInfo
- Publication number
- CN202327365U CN202327365U CN2011204463199U CN201120446319U CN202327365U CN 202327365 U CN202327365 U CN 202327365U CN 2011204463199 U CN2011204463199 U CN 2011204463199U CN 201120446319 U CN201120446319 U CN 201120446319U CN 202327365 U CN202327365 U CN 202327365U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- pedestal
- utility
- model
- support device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004744 fabric Substances 0.000 claims abstract description 11
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 47
- 229910000838 Al alloy Inorganic materials 0.000 claims description 18
- 238000005452 bending Methods 0.000 claims description 6
- 230000006978 adaptation Effects 0.000 abstract 1
- 230000008878 coupling Effects 0.000 abstract 1
- 238000010168 coupling process Methods 0.000 abstract 1
- 238000005859 coupling reaction Methods 0.000 abstract 1
- 238000009434 installation Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 3
- 230000001105 regulatory effect Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 229910000861 Mg alloy Inorganic materials 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 229910001069 Ti alloy Inorganic materials 0.000 description 1
- 239000000956 alloy Substances 0.000 description 1
- 239000004411 aluminium Substances 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 230000004323 axial length Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a with strutting arrangement of tube coupling on base, this strutting arrangement is provided with mounting structure (21) including pipeline fixed part (1) and pipeline supporting part (2) that link together on the pipeline supporting part to but install on base (4) through this mounting structure axial adjustment. The utility model also discloses a concrete conveying equipment, this concrete conveying equipment include concrete conveying pipe and cloth arm (41), still include the utility model provides a strutting arrangement on the base is connected to the pipeline, wherein, concrete conveying pipe fixes on the pipeline fixed part, the base does cloth arm. Because the utility model provides a supporting device has but installs the mounting structure on the base with axial adjustment. Therefore, the utility model provides a back on installing the base can be carried out to strutting arrangement to the different arrangement mode of adaptation pipeline.
Description
Technical field
The utility model relates to the support field of pipeline, particularly, relates to a kind of concrete conveying equipment that pipeline is connected the support device on the pedestal and uses this support device.
Background technique
Be connected at for example concrete delivery pipe in the support field of pipelines such as cloth arm, use the support device that pipeline is connected on the corresponding pedestal through regular meeting.It can make the transportation work of pipeline more stable, has also protected the safety of pipeline itself.In the prior art, this support device is fixed on the pedestal usually, perhaps adopts flange to be installed on the pedestal.Therefore, after this support device was installed on the pedestal, the relative position of itself and pedestal was fixed, and can't regulate.Therefore, then can not cause the inconvenience that is connected of pipeline during installation pipeline according to the structure of pipeline and arrangement adjustment in the later stage.
The model utility content
A purpose of the utility model provides and a kind of pipeline is connected the support device on the pedestal, and this support device can carry out axial adjustment after being installed on the pedestal, to adapt to the different arrangements of pipeline.
Another purpose of the utility model provides a kind of concrete conveying equipment, and this concrete conveying equipment comprises that the utility model provides is connected pipeline the support device on the pedestal.
To achieve these goals; The utility model provides a kind of pipeline is connected the support device on the pedestal; This support device comprises pipeline fixing part and the pipeline supporting portion that is fixed together; Said pipeline supporting portion is provided with mounting structure, but and through this mounting structure axial adjustment be installed on the said pedestal.
Preferably, said pedestal is provided with fitting seat, and said pipeline supporting portion is installed on the said fitting seat through said mounting structure.
Preferably, said mounting structure is the worm structure that is respectively formed on said pipeline supporting portion and the said fitting seat, and said pipeline supporting portion is installed on the said fitting seat through this worm structure.
Preferably; Said mounting structure comprises first through hole that is formed on said pipeline supporting portion and is formed on second through hole on the said fitting seat; Insert in the said fixed base said pipeline supporting portion; Said first through hole is connected through bolt with second through hole, and wherein, said this first through hole and/or said second through hole axially form a plurality of.
Preferably, said pipeline fixing part is the aluminum alloy bending plate, and this aluminum alloy bending plate comprises groove and the symmetrical fixed plate that is located at these groove both sides that holds said pipeline.
Preferably, said pipeline supporting portion is an Al-alloy pipe, and an end of this Al-alloy pipe connects said pipeline fixing part, and the other end is provided with said mounting structure
Provide on the other hand according to the utility model; A kind of concrete conveying equipment is provided; This concrete conveying equipment comprises that concrete delivery pipe and the said concrete conveying equipment of cloth arm comprise also that the utility model provides is connected pipeline the support device on the pedestal; Wherein, said concrete delivery pipe is fixed on the said pipeline fixing part, and said pedestal is said cloth arm.
Through technique scheme, but because the support device that the utility model provides is installed in the mounting structure on the pedestal with having axial adjustment.Therefore; The support device that the utility model provides is after being installed on the pedestal; Can carry out axial adjustment; Adapting to the different arrangements of pipeline, and can use the concrete delivery pipe of concrete conveying equipment of this support device higher with respect to efficient and the practicability that its cloth arm connects.
Other feature and advantage of the utility model will partly specify in embodiment subsequently.
Description of drawings
Accompanying drawing is the further understanding that is used to provide the utility model, and constitutes the part of specification, is used to explain the utility model with following embodiment, but does not constitute the restriction to the utility model.In the accompanying drawings:
Fig. 1 is in the utility model first mode of execution, the perspective view of supporting portion;
Fig. 2 is in the utility model first mode of execution, the perspective view of fitting seat;
Fig. 3 is in the utility model first mode of execution, pipeline is connected to the perspective view (omission pipeline) of the supporting structure on the pedestal;
Fig. 4 is in the utility model first mode of execution, and the supporting portion is fixed on the another kind of mode of execution on the pedestal;
Fig. 5 is in the utility model second mode of execution, the Placement schematic representation of supporting portion and fitting seat.
Description of reference numerals
1 pipeline fixing part, 2 pipeline supporting portions
3 fitting seats, 4 pedestals
11 grooves, 12 mounting plates
21 mounting structures, 22 first through holes
31 second through holes, 41 cloth arms
Embodiment
Be elaborated below in conjunction with the embodiment of accompanying drawing to the utility model.Should be understood that embodiment described herein only is used for explanation and explains the utility model, is not limited to the utility model.
Extremely shown in Figure 5 like Fig. 1; The utility model provides a kind of pipeline is connected the support device on the pedestal; This support device comprises the pipeline fixing part 1 and pipeline supporting portion 2 that is fixed together; Pipeline supporting portion 2 is provided with mounting structure 21, but and through these mounting structure 21 axial adjustment be installed on the pedestal 4.
In technique scheme; At first pipeline supporting portion 2 is installed on the pedestal 4 through mounting structure 21, pipeline is being fixed on the pipeline fixing part 1, at this moment then; Structure according to pipeline is different with arrangement; Can axial adjustment supporting portion 2 with respect to the axial position of pedestal 4, therefore can realize the connection and the support with respect to pedestal of various pipelines easily, thereby the support device practicability that the utility model is provided is higher.In addition, " axially " that the utility model is mentioned under the situation that is not having opposite explanation, typically refer on the supporting portion 2 near and away from the direction of pedestal 4.Wherein, The means of fixation of pipeline supporting portion 2 and pipeline fixing part 1 is well known in the art, for example can be fixed as one through welding manner on-dismountablely, also can removably be fixed together through worm structure; As long as satisfy the purpose of the utility model, the utility model does not limit this.
The preferred implementation of the utility model will be described below in conjunction with accompanying drawing; Owing to can realize that the mode of execution of the utility model technological scheme has multiple; Explanation for ease; Only introduce preferred implementation wherein, this preferred implementation only is used to explain the utility model, is not limited to the utility model.
, for ease support device is connected on the pedestal 4 to shown in Figure 5 like Fig. 2, preferably, pedestal 4 is provided with fitting seat 3, and pipeline supporting portion 2 is installed on the fitting seat 3 through mounting structure 21.Therefore, the mounting structure 21 mentioned of the utility model can be formed on this fitting seat 3 and the pipeline supporting portion 2 easily.In addition, this fitting seat 3 can as shown in Figure 3ly be fixed by welding on the pedestal 4, also can on its end, flange be set as shown in Figure 4, and removably be fixed on the pedestal 4 through fastening pieces such as bolts, and the utility model does not limit this type of change.
In first mode of execution of the utility model; As shown in Figure 3, in order to realize the purpose of the utility model, preferably; Mounting structure 21 is for being respectively formed at the worm structure on pipeline supporting portion 2 and the fitting seat 3, and pipeline supporting portion 2 is installed on the fitting seat 3 through this worm structure.Through this worm structure; When the assembling pipeline, can realize that pipeline supporting portion 2 position regulation and support vertically is set to cooperate the axial length of pipeline, and pass through screw-thread fit through screwing pipeline supporting portion 2; Can also be when installation pipeline; Simultaneously through supporting portion 2 with axially vertical plane on rotation, regulate pipeline fixing part 1 to suitable setting angle, the support device that the utility model is provided more can adapt to pipeline various structure and arrangement.In addition, worm structure is easy to process, and assembling is flexible, efficient is high.
Except that first mode of execution; In second mode of execution as shown in Figure 5, preferably, mounting structure 21 comprises first through hole 22 that is formed on pipeline supporting portion 2 and is formed on second through hole 31 on the fitting seat 3; Insert in the fixed base 3 pipeline supporting portion 2; First through hole 22 is connected through bolt with second through hole 31, and wherein, this first through hole 22 and/or second through hole 31 axially form a plurality of.Therefore; Through regulating first different through holes 22 and 31 alignment of second through hole; Use bolt to connect the through hole of this alignment, can pipeline supporting portion 2 be fixed on the fitting seat 3, and when needs are regulated axial position; Only need back out bolt, and change first through hole 22 and second through hole 31 that align and can realize.Therefore second mode of execution of the utility model also can be accomplished the purpose of the utility model.Wherein, those skilled in the art can be understood that the cooperation between first through hole 22 and second through hole 31 can be one-to-many, many-one or multi-to-multi, and the utility model does not limit this type of change.
Except the change of Placement; The utility model also changes the material of support device; Preferably, pipeline fixing part 1 is the aluminum alloy bending plate, and this aluminum alloy bending plate comprises groove 11 and the symmetrical fixed plate 12 that is located at these groove 11 both sides that holds pipeline.And preferably, pipeline supporting portion 2 is an Al-alloy pipe, an end connecting pipeline fixing part 1 of this Al-alloy pipe, and the other end is provided with mounting structure 21.Wherein, this pipeline can be structure as a whole and also can be the lockable shrinking structure of more piece, can be that the support device practicability that provides of the utility model is higher through adopting this telescopic pipe well known in the art.In addition, when fitting seat 3 adopted flange to be connected with pedestal 4, fitting seat 3 also can be an aluminum alloy material.Wherein, the aboundresources of aluminium and aluminum alloy, cost is lower.And importantly, aluminum alloy is than the steel light specific gravity, can alleviate whole device and use the weight of the equipment of this device, cuts down the consumption of energy.And lighter aluminum alloy plate or pipe fitting are convenient to manual installation.High, the good moldability of the intensity of aluminum alloy simultaneously is a most preferably material of making the support device that the utility model provides.In addition; Other lightweights that those skilled in the art can expect and the high material of intensity are equally applicable to the utility model, for example fibrous composite, titanium alloy or magnesium alloy or the like; As long as can realize the purpose of the utility model, the utility model does not limit this.
To sum up; The support device that pipeline is connected on the pedestal that the utility model provides is satisfying under the effect that pipeline is supported; Can also regulate its axial position, thereby adapt to different pipeline structures and setting type, have stronger practicability and promotional value with respect to pedestal.
According to the utility model on the other hand; A kind of concrete conveying equipment is provided; This concrete conveying equipment comprises concrete delivery pipe and cloth arm 41, and this concrete conveying equipment comprises also that the utility model provides is connected pipeline the support device on the pedestal, wherein; Concrete delivery pipe is fixed on the pipeline fixing part 1, and pedestal 4 then is a cloth arm 41.
Therefore, the utility model provides is connected to pipeline the installation efficiency that support device on the pedestal can effectively improve concrete delivery pipe, and practicability is high.
More than combine accompanying drawing to describe the preferred implementation of the utility model in detail; But; The utility model is not limited to the detail in the above-mentioned mode of execution; In the technical conceive scope of the utility model, can carry out multiple simple variant to the technological scheme of the utility model, these simple variant all belong to the protection domain of the utility model.
Need to prove in addition; Each concrete technical characteristics described in above-mentioned embodiment under reconcilable situation, can make up through any suitable manner; For fear of unnecessary repetition, the utility model is no longer gone explanation to various possible compound modes.
In addition, also can carry out combination in any between the various mode of execution of the utility model, as long as its thought without prejudice to the utility model, it should be regarded as content disclosed in the utility model equally.
Claims (7)
1. one kind is connected the support device on the pedestal with pipeline; This support device comprises pipeline fixing part (1) and pipeline supporting portion (2) that are fixed together; It is characterized in that; Said pipeline supporting portion (2) is provided with mounting structure (21), and through this mounting structure (21) but axial adjustment be installed on the said pedestal (4).
2. according to claim 1 is said pipeline is connected the support device on the pedestal, it is characterized in that, said pedestal (4) is provided with fitting seat (3), and said pipeline supporting portion (2) is installed on the said fitting seat (3) through said mounting structure (21).
3. according to claim 2 pipeline is connected the support device on the pedestal; It is characterized in that; For to be respectively formed at the worm structure on said pipeline supporting portion (2) and the said fitting seat (3), said pipeline supporting portion (2) is installed on the said fitting seat (3) through this worm structure said mounting structure (21).
4. according to claim 2 pipeline is connected the support device on the pedestal; It is characterized in that; Said mounting structure (21) comprises first through hole (22) that is formed on said pipeline supporting portion (2) and is formed on last second through hole of said fitting seat (3) (31), and insert in the said fixed base (3) said pipeline supporting portion (2), and said first through hole (22) is connected through bolt with second through hole (31); Wherein, said this first through hole (22) and/or said second through hole (31) axially form a plurality of.
5. according to claim 1 pipeline is connected the support device on the pedestal; It is characterized in that; Said pipeline fixing part (1) is the aluminum alloy bending plate, and this aluminum alloy bending plate comprises the fixed plate (12) that the groove (11) that holds said pipeline and symmetry are located at this groove (11) both sides.
6. according to claim 1 pipeline is connected the support device on the pedestal, it is characterized in that said pipeline supporting portion (2) is an Al-alloy pipe, an end of this Al-alloy pipe connects said pipeline fixing part (1), and the other end is provided with said mounting structure (21).
7. concrete conveying equipment; This concrete conveying equipment comprises concrete delivery pipe and cloth arm (41); It is characterized in that said concrete conveying equipment comprises that also any one describedly is connected the support device on the pedestal with pipeline among the claim 1-6, wherein; Said concrete delivery pipe is fixed on the said pipeline fixing part (1), and said pedestal (4) is a said cloth arm (41).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204463199U CN202327365U (en) | 2011-11-11 | 2011-11-11 | Support device for connecting pipeline to base and concrete conveying equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204463199U CN202327365U (en) | 2011-11-11 | 2011-11-11 | Support device for connecting pipeline to base and concrete conveying equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202327365U true CN202327365U (en) | 2012-07-11 |
Family
ID=46439344
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011204463199U Expired - Fee Related CN202327365U (en) | 2011-11-11 | 2011-11-11 | Support device for connecting pipeline to base and concrete conveying equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202327365U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103556833A (en) * | 2013-10-24 | 2014-02-05 | 中联重科股份有限公司 | Viscous material conveying pipe supporting device, supporting structure and concrete conveying machine |
CN106121241A (en) * | 2016-06-22 | 2016-11-16 | 安庆海纳信息技术有限公司 | A kind of concrete ground pump terminal-specific self-feeding pours device |
CN107541895A (en) * | 2016-06-29 | 2018-01-05 | 青岛海尔洗衣机有限公司 | A kind of fixing means of connecting pipe, washing machine and inlet pipeline |
CN109322494A (en) * | 2018-12-05 | 2019-02-12 | 三汽车制造有限公司 | Conveyer pipe fixing device, cantilever crane and concrete mixer |
CN111971440A (en) * | 2018-03-22 | 2020-11-20 | 普茨迈斯特工程有限责任公司 | End hose support for a distribution rod of a concrete pump, concrete pump having an end hose support, and method for assembling an end hose support |
CN114877131A (en) * | 2022-05-20 | 2022-08-09 | 中建八局第二建设有限公司 | Adjustable downpipe installation device and installation method thereof |
-
2011
- 2011-11-11 CN CN2011204463199U patent/CN202327365U/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103556833A (en) * | 2013-10-24 | 2014-02-05 | 中联重科股份有限公司 | Viscous material conveying pipe supporting device, supporting structure and concrete conveying machine |
CN103556833B (en) * | 2013-10-24 | 2015-09-30 | 中联重科股份有限公司 | Viscous material conveying pipe supporting device, supporting structure and concrete conveying machine |
CN106121241A (en) * | 2016-06-22 | 2016-11-16 | 安庆海纳信息技术有限公司 | A kind of concrete ground pump terminal-specific self-feeding pours device |
CN106121241B (en) * | 2016-06-22 | 2018-04-17 | 江苏金贸科技发展有限公司 | A kind of concrete ground pump terminal-specific self-feeding pours device |
CN107541895A (en) * | 2016-06-29 | 2018-01-05 | 青岛海尔洗衣机有限公司 | A kind of fixing means of connecting pipe, washing machine and inlet pipeline |
CN111971440A (en) * | 2018-03-22 | 2020-11-20 | 普茨迈斯特工程有限责任公司 | End hose support for a distribution rod of a concrete pump, concrete pump having an end hose support, and method for assembling an end hose support |
CN109322494A (en) * | 2018-12-05 | 2019-02-12 | 三汽车制造有限公司 | Conveyer pipe fixing device, cantilever crane and concrete mixer |
CN109322494B (en) * | 2018-12-05 | 2024-03-22 | 三一汽车制造有限公司 | Conveying pipe fixing device, arm support and concrete pump truck |
CN114877131A (en) * | 2022-05-20 | 2022-08-09 | 中建八局第二建设有限公司 | Adjustable downpipe installation device and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202327365U (en) | Support device for connecting pipeline to base and concrete conveying equipment | |
US9166390B2 (en) | Overhead-mounted cable and busway support system | |
CN106877228A (en) | A kind of cable bend fixed structure | |
CN204358258U (en) | Airduct water pipe shares suspension bracket | |
CN206195292U (en) | Spring bearing structure based on installation of generating line shaft | |
CN210950204U (en) | Oil gas pipeline fixing device | |
US8353381B2 (en) | Transmission cross-member | |
CN209067955U (en) | A kind of hanger beam component suitable for air-conditioning | |
JP3197136U (en) | Solar panel for snow-free roof | |
CN106972820A (en) | Solar energy photovoltaic panel compression fixed structure in a kind of flat single-shaft tracking system | |
CN203797162U (en) | Small-gap adjustable pipeline support device | |
KR101177848B1 (en) | Fixed clip for steel angle bar and ship provided with the clip | |
CN110925898A (en) | Outer quick-witted fixed bolster of air conditioner convenient to installation | |
CN206657998U (en) | A kind of cable bend fixed structure | |
CN202016649U (en) | Single drum section transporting bracket | |
CN211475063U (en) | Diplopore antidetonation connecting piece | |
CN218818645U (en) | Single-suspension anti-seismic support | |
CN204592803U (en) | The fixed structure of power transmission tower video surveillance devices | |
CN103625991B (en) | Compound type is around pipe, line device | |
CN221647878U (en) | Lateral shock-resistant structure of air pipe | |
CN220440357U (en) | Cable support for electric power tunnel | |
CN215371278U (en) | Supporting and fixing device for petroleum cracking pipeline | |
CN208382407U (en) | The riser cradle being fixed in wall | |
WO2022160738A1 (en) | Oil tank assembly structure of crane and crane | |
CN209743786U (en) | U-shaped connecting base |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120711 Termination date: 20161111 |