CN202325388U - Well-completion type separate stratum fracturing packer - Google Patents
Well-completion type separate stratum fracturing packer Download PDFInfo
- Publication number
- CN202325388U CN202325388U CN2011204894429U CN201120489442U CN202325388U CN 202325388 U CN202325388 U CN 202325388U CN 2011204894429 U CN2011204894429 U CN 2011204894429U CN 201120489442 U CN201120489442 U CN 201120489442U CN 202325388 U CN202325388 U CN 202325388U
- Authority
- CN
- China
- Prior art keywords
- completion
- well
- sliding sleeve
- central tube
- fracturing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model belongs to a downhole tool for oil and gas fields, and particularly relates to a well-completion type separate stratum fracturing packer. The packer is characterized in that an opening at the lower end of an upper joint (1) is in threaded connection with a central tube (3), a well-completion sliding sleeve (4) is arranged in the upper end of the central tube (3), the well-completion sliding sleeve (4) and the central tube (3) are connected in a positioning mode by using well-completion pin (16), a well-completion steel ball (15) is arranged at the upper port of the well-completion sliding sleeve (4), a connecting sleeve (5) is arranged below the well-completion sliding sleeve (4), the two ends of a fracturing pin (14) are respectively connected with a fracturing sliding sleeve (6) and the central tube (3) in a positioning mode, and a fracturing steel ball (15) is arranged at the upper port of the fracturing sliding sleeve (6). By using the well-completion type separate stratum fracturing packer disclosed by the utility model, the separate stratum fracturing of a gas well can be satisfied, and after the fracturing is completed, through carrying out a well-completion operation, sliding sleeves and steel balls of sand blowers at different levels can be fetched down to the downhole, so that an oil pipe is internally unimpeded, thereby achieving an effect of unimpeded gas production and solving a testing problem; meanwhile, the packer is unpacked in the process of well completion so as to solve the problem that the later pipe removal is difficult.
Description
Technical field
The utility model belongs to the oil gas field downhole tool, particularly a kind of completion formula separate stratum fracfturing packer.
Background technology
At present; Along with a large amount of gas well separate stratum fracfturing constructions, exposed two problems, the one, after separate stratum fracfturing is accomplished; Because steel ball is stayed in the oil pipe on the sliding sleeve of sandblasters at different levels; Because factors such as each stressor layer is different and some layer shakes out when exploitation have hindered the normal exploitation of some layer, obstructed causing can not be carried out the test of each layer in the oil pipe simultaneously; The 2nd, packer is not automatic deblocking after pressure break is accomplished, and in the time of need salvaging in the exploitation later stage, the sand card causes the overhaul accident easily.
Summary of the invention
The purpose of the utility model is to overcome above-mentioned technical deficiency, and a kind of gas well separate stratum fracfturing of satisfying is provided, and makes in the oil pipe unimpededly, stops the completion formula separate stratum fracfturing packer of overhaul accident.
The technical scheme that the utility model technical solution problem adopts is: completion formula separate stratum fracfturing packer comprises top connection, lower contact, central tube, upper press ring, pin, piston are pinned, set to pressure ring, completion steel ball, pressure break steel ball, pressure break down; Be characterized in that the top connection lower end drives the lobe central tube that is threaded; In the completion sliding sleeve centering pipe upper end; Be located by connecting with completion pin between completion sliding sleeve and the central tube, the completion steel ball places the port of completion sliding sleeve, adapter sleeve place the completion sliding sleeve below; Pressure break pin two ends be located by connecting respectively pressure break sliding sleeve and central tube, the pressure break steel ball places the port of pressure break sliding sleeve.
The beneficial effect of the utility model is: completion formula separate stratum fracfturing packer can satisfy the gas well separate stratum fracfturing; Pass through completion operations after the pressure break; Can hit the sliding sleeve and the steel ball of sandblasters at different levels down shaft bottom, make in the oil pipe unimpededly, realize without hindrance gas production and solve test problem; While, with the packer deblocking, the solution later stage was played the pipe difficult problem when completion.
Description of drawings
Specify with embodiment below in conjunction with accompanying drawing.
Fig. 1 is a completion formula separate stratum fracfturing packer construction sectional view.
Among the figure, the 1-top connection; The 2-upper press ring; The 3-central tube; 4-completion sliding sleeve; The 5-adapter sleeve; 6-pressure break sliding sleeve; The 7-packing element; Pressure ring under the 8-; The 9-locking mechanism; The 10-piston; The 11-lower contact; 12-sets pin; 13-deblocking pin; 14-pressure break pin; 15-pressure break steel ball; 16-completion pin; 17-completion steel ball.
The specific embodiment
Embodiment, with reference to accompanying drawing 1, completion formula separate stratum fracfturing packer top connection 1 external screw thread connects upper press ring 2, the inner central tube 3 that connects, central tube 3 lower ends connect lower contact 11.Lower contact 11 upper ends connect piston 10 by setting pin 12, and piston 10 connects pressure ring 8 down, and the middle locking mechanism 9 that is located by connecting on the central tube 3 by deblocking pin 13 of installing is installed packing element 7 between upper press ring 2 and the following pressure ring 8.The lobe central tube 3 that is threaded is driven in top connection 1 lower end, in the completion sliding sleeve 4 centering pipes 3, is located by connecting with completion pin 16 between completion sliding sleeve 4 and the central tube 3, and completion steel ball 17 is inserted the port of completion sliding sleeve 4.Adapter sleeve 5 place completion sliding sleeve 4 below, pressure break pin 14 two ends be located by connecting respectively pressure break sliding sleeve 4 and central tube 3, pressure break steel ball 15 places the port of pressure break sliding sleeve 6.
The operating principle of completion formula separate stratum fracfturing packer is: when setting; Water filling is suppressed in the oil pipe, affacts on the piston 10 through adapter sleeve 5 base apertures and central tube 3 base apertures, promotes piston 10 and cuts off that to set pin 12 afterwards up; Compression packing element 7 expands and seals, and lock is accomplished locking with following pressure ring 8 simultaneously; Pressure break when upper end layer, in oil pipe, throw pressure break steel ball 15, fall on pressure break sliding sleeve 6 port; Suppress in the central tube 3, pressure break sliding sleeve 6 is cut off and is taken that to split pin 14 backs up by force, and upper end outside shoulder hangs on the adapter sleeve 5 inner elastomeric shoulders; The pressure break passage is opened; With adapter sleeve 5 base apertures shutoff, can be during pressure break through elasticity spring place, adapter sleeve 5 middle part to piston 10 lower end supplementary pressures, during the balance pressure break to the used load of deblocking pin 13; During completion, in oil pipe, throw completion steel ball 17, drop down onto on the port of completion sliding sleeve 4; Suppress in the oil pipe, it is descending that completion sliding sleeve 4 is cut off completion pin 16 backs, removes the support that top connection 1 is connected with central tube 3 elasticity; Central tube 3, adapter sleeve 5 and descending with the lower part, packing element 7 reclaims the packer deblocking; Completion sliding sleeve 4 is descending more afterwards, removes the support that adapter sleeve 5 is connected with central tube 3 elasticity, and it is descending to drive adapter sleeve 5; Open after adapter sleeve 5 middle part elasticity springs partly drop down onto central tube 3 inner reamings place, pressure break sliding sleeve 6 drops down onto the shaft bottom with pressure break steel ball 15 and completion sliding sleeve 4 and completion steel ball 17 through adapter sleeve 5 lower ends, realizes without hindrance.
Claims (1)
1. completion formula separate stratum fracfturing packer; Comprise top connection (1), lower contact (11), central tube (3), upper press ring (2), following pressure ring (8), completion steel ball (17), pressure break steel ball (15), pressure break pin (14), set pin (12), piston (10); It is characterized in that top connection (1) lower end drives the lobe central tube (3) that is threaded; In completion sliding sleeve (4) centering pipe (3) upper end; Be located by connecting with completion pin (16) between completion sliding sleeve (4) and the central tube (3), completion steel ball (17) places the port of completion sliding sleeve (4), adapter sleeve (5) place completion sliding sleeve (4) below; Pressure break pin (14) two ends be located by connecting respectively pressure break sliding sleeve (6) and central tube (3), pressure break steel ball (15) places the port of pressure break sliding sleeve (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204894429U CN202325388U (en) | 2011-12-01 | 2011-12-01 | Well-completion type separate stratum fracturing packer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204894429U CN202325388U (en) | 2011-12-01 | 2011-12-01 | Well-completion type separate stratum fracturing packer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202325388U true CN202325388U (en) | 2012-07-11 |
Family
ID=46437370
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011204894429U Expired - Lifetime CN202325388U (en) | 2011-12-01 | 2011-12-01 | Well-completion type separate stratum fracturing packer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202325388U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107120089A (en) * | 2017-04-28 | 2017-09-01 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | A kind of extruding cup packer of self-balancing |
-
2011
- 2011-12-01 CN CN2011204894429U patent/CN202325388U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107120089A (en) * | 2017-04-28 | 2017-09-01 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | A kind of extruding cup packer of self-balancing |
CN107120089B (en) * | 2017-04-28 | 2019-06-04 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | A kind of extruding cup packer of self-balancing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102966327B (en) | expansion pipe | |
CN201486515U (en) | Switch type releasing packer | |
CN101881143B (en) | Drillable ball injection sliding sleeve suitable for horizontal well | |
CN202707024U (en) | Immovable separate stratum fracture technology pipe column | |
CN200992982Y (en) | One-trip string hydraulic setting squeezing bridge plug | |
CN203081398U (en) | Hydraulic setting type small-drift-diameter oil pipe bridge plug | |
CN202325388U (en) | Well-completion type separate stratum fracturing packer | |
CN202325386U (en) | Stepped setting fracture packer | |
CN201420536Y (en) | Well completion sliding sleeve fracturing valve | |
CN201738869U (en) | Drillable ball-throwing sliding sleeve suitable for horizontal well | |
CN105350938A (en) | Mechanical packer | |
CN202970640U (en) | Reservoir protection tubular pillar of pressure self-adaptive anchoring packer | |
CN201460802U (en) | Insertion pipe packer | |
CN201546665U (en) | Recyclable bridge plug | |
CN204327023U (en) | A kind of tubing string release device | |
CN201045290Y (en) | Large hollow stem oil pumping system | |
CN203499608U (en) | Multifunctional sand flushing and well washing valve | |
CN102953706A (en) | Washable well packer for realizing underground secondary setting | |
CN202249942U (en) | Oil-water-well casing swabbing tool | |
CN202007650U (en) | Buoyancy-type valve shaft bottom blowout prevention switch | |
CN2916104Y (en) | Hydraulic oil pipe anchoring tools | |
CN2881074Y (en) | Filling tool of pipe external packer | |
CN202125273U (en) | Fracture packer | |
CN201539244U (en) | Well-completion separate-layer fracturing tool assembly | |
CN2777184Y (en) | External packer filling tool for completion pipe of horizontal well |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20120711 |