CN202324186U - Net frame structure - Google Patents

Net frame structure Download PDF

Info

Publication number
CN202324186U
CN202324186U CN2011204232993U CN201120423299U CN202324186U CN 202324186 U CN202324186 U CN 202324186U CN 2011204232993 U CN2011204232993 U CN 2011204232993U CN 201120423299 U CN201120423299 U CN 201120423299U CN 202324186 U CN202324186 U CN 202324186U
Authority
CN
China
Prior art keywords
rod member
net frame
rod
rod piece
stiffening ribs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204232993U
Other languages
Chinese (zh)
Inventor
温四清
张达生
袁强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CITIC General Institute of Architectural Design and Research Co Ltd
Original Assignee
WUHAN BUILDING DESIGN INST
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN BUILDING DESIGN INST filed Critical WUHAN BUILDING DESIGN INST
Priority to CN2011204232993U priority Critical patent/CN202324186U/en
Application granted granted Critical
Publication of CN202324186U publication Critical patent/CN202324186U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model relates to a net frame structure. The net frame structure comprises a net frame body formed by connecting a plurality of rod pieces in a staggered manner, wherein the rod pieces are of hot-rolled seamless steel pipes, stiffening ribs are welded on at least one rod piece, and the stiffening ribs are arranged along the axial direction of the rod piece. By utilizing the structure, the rigidity of a member can be effectively increased by welding the stiffening ribs on the rod piece, and the rod piece further has greater bearing capacity. In addition, as for the situation of reinforcing an original net frame structure which often appears in reconstruction and expansion projects, the rigidity of the member can be effectively increased by welding the stiffening ribs on the rod piece for a pressure rod which does not achieve the bearing capacity, so that the bearing capacity under stress of the member after reinforcing can meet the design requirements, and the problems of difficulty in construction and greater loss of materials of a processing form of directly replacing or externally wrapping a steel pipe with larger diameter in the prior art can be further solved.

Description

A kind of space truss structure
Technical field
The utility model relates to building structure field, is specifically related to a kind of space truss structure.
Background technology
At building field, especially, tend to adopt space truss structure for than longspan structure.Space truss structure is selected for use the steel pipe of different-diameter to be cross-linked as rod member according to stressing conditions usually and is formed.But diameter of steel tube too conference causes waste of material.In addition,, occur needing original structure is reinforced, wherein just comprise rack through regular meeting along with the enforcement of at present a large amount of reconstruction and extension projects.To the processing that does not reach the requirement for bearing capacity depression bar generally is the steel pipe of a directly replacement or a larger diameter of outsourcing.These two kinds of methods all exist constructional difficulties and the bigger problem of consumable material.
Summary of the invention
The purpose of the utility model is to provide a kind of space truss structure, and this space truss structure can be issued to bearing capacity in the situation of less rod member diameter.
The technical scheme that realizes the utility model above-mentioned purpose is: a kind of space truss structure, comprise by some rod members being cross-linked the rack body of forming, and rod member is a hot rolled seamless steel tube, wherein is welded with stiffening rib at least one rod member, stiffening rib axially is provided with along rod member.
The stiffening rib that welds on the said rod member is 3-5, and this 3-5 stiffening rib is distributed on rod member tube wall week side.
The utility model through on rod member, welding the rigidity that stiffening rib effectively increases member, makes rod member have bigger bearing capacity owing to adopt said structure.In addition; For the situation that original space truss structure is reinforced that often occurs in the reconstruction and extension project; Can be to not reaching the depression bar of bearing capacity; Effectively increase the rigidity of member through welding stiffening rib on rod member, make the compression bearing of reinforcing the back member meet design requirement, directly replace in the prior art or the existing constructional difficulties of processing form and the bigger problem of consumable material of the steel pipe of a larger diameter of outsourcing to solve.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Fig. 2 is an A-A profile among Fig. 1.
The specific embodiment
Below in conjunction with specific embodiment, further set forth the utility model.Should be understood that those skilled in the art can do various changes or modification to the utility model after the content of having read the utility model instruction, these equivalent form of values fall within the application's appended claims institute restricted portion equally.
Referring to Fig. 1-Fig. 2; The utility model comprises by some rod members 2 and is cross-linked the rack body of forming 1; Rod member 2 is a hot rolled seamless steel tube; Wherein be welded with stiffening rib 3 (confirming the rod member that required welding stiffening rib is reinforced according to stressing conditions) at least one rod member 2, stiffening rib 3 axially is provided with along rod member 2.
The stiffening rib of welding is 3 on the said rod member 2, and these stiffening ribs are distributed on rod member tube wall week side.
The utility model makes rod member have bigger bearing capacity through on rod member, welding the rigidity that stiffening rib effectively increases member.In addition; For the situation that original space truss structure is reinforced that often occurs in the reconstruction and extension project; Can meet design requirement through on rod member, welding the rigidity that stiffening rib effectively increases member, make the compression bearing of reinforcing the back member to not reaching the depression bar of bearing capacity.Compared with prior art, the utility model is the most direct, most effective to the rigidity that improves rod member, stiffening rib handling ease, construction and installation flexible arrangement.Reinforce back rod member compressive strength and obviously promoted, there is very positive meaning reinforcement cost, the reduction of erection time of reducing engineering.
Embodiment 1
Application examples: certain engineering rack is after construction finishes, and the Party A has proposed new requirement to design, causes load to change.Through checking computations, find that part rod member compressive strength (stablizing) can't satisfy new designing requirement, needs reinforcement.Rod member for grid is hot rolled seamless steel tube.
Wherein the rod member model of a need reinforced pole is 203X12 (radius of gyration 6.77cm, every meter weight 56.52kg/m), need reach 7.0cm if will satisfy its radius of gyration of new designing requirement.
If with its rod member model of directly replacing then replacement is 219X14 (radius of gyration 7.26cm, every meter weight 70.78kg/m); If adopt steel clad reinforcement, Baogang's model is 219X8 (radius of gyration 7.47cm, every meter weight 41.63kg/m).
If adopt this new and practical method then only to need around former rod member, to weld three stiffening ribs, the angle between stiffening rib is 120 degree, and the cross section is 6X50.The total sectional area of three stiffening ribs is 9.00c ㎡ only, and every meter weight is 7.07kg/m; More directly replacement method is practiced thrift steel using amount 90%, reinforces than Baogang's method and practices thrift steel using amount 83%.Reach 8.34cm with former rod member welding rear fitting radius, can satisfy new designing requirement fully.

Claims (2)

1. a space truss structure comprises by some rod members being cross-linked the rack body of forming, and rod member is a hot rolled seamless steel tube, it is characterized in that: wherein be welded with stiffening rib at least one rod member, stiffening rib axially is provided with along rod member.
2. space truss structure as claimed in claim 1 is characterized in that: the stiffening rib that welds on the said rod member is 3-5, and this 3-5 stiffening rib is distributed on rod member tube wall week side.
CN2011204232993U 2011-10-31 2011-10-31 Net frame structure Expired - Fee Related CN202324186U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204232993U CN202324186U (en) 2011-10-31 2011-10-31 Net frame structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204232993U CN202324186U (en) 2011-10-31 2011-10-31 Net frame structure

Publications (1)

Publication Number Publication Date
CN202324186U true CN202324186U (en) 2012-07-11

Family

ID=46436169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204232993U Expired - Fee Related CN202324186U (en) 2011-10-31 2011-10-31 Net frame structure

Country Status (1)

Country Link
CN (1) CN202324186U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103774861A (en) * 2014-01-26 2014-05-07 淮海工学院 Reinforcement method for grid structure rod piece
CN104975726A (en) * 2015-06-12 2015-10-14 徐州市产品质量监督检验中心 Grid structure rod element composite reinforcing method
CN104989120A (en) * 2015-07-17 2015-10-21 中冶建筑研究总院有限公司 Space structure key rod piece reinforcing method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103774861A (en) * 2014-01-26 2014-05-07 淮海工学院 Reinforcement method for grid structure rod piece
CN103774861B (en) * 2014-01-26 2016-01-27 淮海工学院 A kind of reinforcement means of grid structure bar
CN104975726A (en) * 2015-06-12 2015-10-14 徐州市产品质量监督检验中心 Grid structure rod element composite reinforcing method
CN104989120A (en) * 2015-07-17 2015-10-21 中冶建筑研究总院有限公司 Space structure key rod piece reinforcing method

Similar Documents

Publication Publication Date Title
US10167623B2 (en) Prefabricated reinforced concrete-filled steel pipe sleeve joint
Chen et al. Seismic behaviour of a through-beam connection between concrete-filled steel tubular columns and reinforced concrete beams
CN202324186U (en) Net frame structure
CN104005490B (en) Anti-buckling limit support member for reinforcing post-yield stiffness
CN107476459B (en) Buckling restrained brace, building and assemble method containing "-" type dissipative cell
CN207032556U (en) Buckling restrained brace and building containing yi word pattern dissipative cell
CN105002999B (en) The metal buckling restrained brace and its building method of a kind of rear-loading type sleeve pipe
CN102852244A (en) Detachable self-resetting type energy-dissipation coupling beam and construction process thereof
Yang et al. Strength of external-ring-stiffened tubular X-joints subjected to brace axial compressive loading
CN201649348U (en) Buckling restrained energy consumption support rigidly connected double steel pipes in the middle
CN204475668U (en) A kind of FRP pipe-concrete-many steel pipe hollows combine single case or many casees multicell beam
JP2008081971A (en) Reinforced concrete beam
CN203530961U (en) Reinforced type steel tube pile or steel stand column
CN103306431B (en) Concrete reinforced pipe lattice column
CN107460965A (en) A kind of new low more yield point all-steel buckling restrained braces of residual deformation
CN206737179U (en) A kind of frcition damper of filled polypropylene bead
CN104563390A (en) FRP (fiber reinforce plastic) tube-concrete-multiple steel tube hollow combined single-box or multi-box multi-compartment beam
JP4949352B2 (en) Primary lining body of concrete-filled steel segment and tunnel
CN203049571U (en) Reinforced type bamboo joint pile
CN105421612A (en) Torsional type dual-pipe bent constraining support
CN202849926U (en) Assembly type outer packing fiber reinforce plastic (FRP)-steel tube-concrete reinforced structure
CN202039354U (en) Prestressed concrete hollow square pile
CN102808384A (en) Concrete reinforced structure adopting assembled FRP (Fiber Reinforced Plastic)-wrapped steel pipe
CN105040828A (en) Round steel pipe constraint steel-concrete column and steel beam joint structure
CN205857407U (en) Inner circle foreign side hollow sandwich band presstressed reinforcing steel concrete-filled steel tube truss tubular joint

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 430014 No. four, No. 8, Lu Lu, Jiang'an District, Hubei, Wuhan

Patentee after: CITIC GENERAL INSTITUTE OF ARCHITECTURAL DESIGN AND RESEARCH CO., LTD.

Address before: 430014 No. four, No. 8, Lu Lu, Jiang'an District, Hubei, Wuhan

Patentee before: Wuhan Building Design Inst.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120711

Termination date: 20171031