CN202321993U CN2011203993200U CN201120399320U CN202321993U CN 202321993 U CN202321993 U CN 202321993U CN 2011203993200 U CN2011203993200 U CN 2011203993200U CN 201120399320 U CN201120399320 U CN 201120399320U CN 202321993 U CN202321993 U CN 202321993U
Authority
CN
China
Prior art keywords
trunnion
hot
gudgeon
ladle
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203993200U
Other languages
Chinese (zh)
Inventor
汪文书
陶新贵
卢峰
许建文
张新堂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Xinjiang Industry Equipment Installation Co Ltd
Original Assignee
CSCEC Xinjiang Industry Equipment Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSCEC Xinjiang Industry Equipment Installation Co Ltd filed Critical CSCEC Xinjiang Industry Equipment Installation Co Ltd
Priority to CN2011203993200U priority Critical patent/CN202321993U/en
Application granted granted Critical
Publication of CN202321993U publication Critical patent/CN202321993U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)

Abstract

The utility model belongs to an auxiliary tool for the interference hot-assembly of a ladle and hot-metal ladle trunnion in the metallurgical industry, in particular to a device for the interference hot-assembly and the hoisting of a ladle and hot-metal ladle trunnion. The device comprises a trunnion with a trunnion hole; a hanging ring is installed at the upper end of a hanger rod formed by a steel pipe through symmetrical through holes; a pin shaft of which the two ends penetrate out of the steel pipe is installed on a steel pipe wall at the lower end of the hanger rod through symmetrical through holes; the hanger rod is in movable fit with the trunnion hole of the trunnion; and a group of positioning blocks is uniformly distributed on the outer peripheral surface of the trunnion along the axial direction. The auxiliary tool has the beneficial effects that when a trunnion interference hot-assembly process is implemented, the safe and reliable hung trunnion can be quickly transmitted to the upper part of a trunnion support by adopting a crane; and the trunnion is stably inserted in a trunnion hole of the trunnion support, so that the assembly precision is ensured, the labor intensity of workers is reduced, and the working conditions are improved.

Description

Molten steel jar, hot-metal bottle gudgeon interference hot charging are joined the device of handling gudgeon
Technical field
The utility model belongs to the accessory appliances of metallurgy industry molten steel jar, hot-metal bottle gudgeon interference hot charging, and particularly a kind of molten steel jar, hot-metal bottle gudgeon interference hot charging are joined the device of handling gudgeon.
Background technology
In the metallurgy industry, the use of molten steel jar, hot-metal bottle is very general in modern times.As the main load-supporting part in molten steel jar, the frequent operation process of hot-metal bottle, it is particularly important that the safety of gudgeon seems.
In traditional manufacturing process, the design paper of molten steel jar, hot-metal bottle often regulation is fixed the mode that gudgeon and trunnion seat connect with welding.
Molten steel jar, hot-metal bottle gudgeon interference hot charging are equipped put development before, we adopt the method for design code, and gudgeon and trunnion seat are welded to connect.Before the welding mother metal is carried out preheating, temperature between key-course during welding, the assembling of gudgeon and trunnion seat is finally accomplished in insulation slowly cooling in welding back.
Production practice prove that the method that molten steel jar, hot-metal bottle design paper propose is feasible, but this method has its weak point:
At first, in the process of mother metal being carried out preheating, control interlayer temperature, postweld heat preservation slow cooling, operation easier is big, weak effect, and efficient is low.
Secondly, the gudgeon assembling is adopted and is welded to connect, at the gudgeon weld heat-affected zone owing to existing welding stress to crack.Simultaneously, also have weld defect in the weld seam and exist, this has stayed accident potential for the safe operation of molten steel jar, hot-metal bottle.
The 3rd, when the requiring of weld defect overshoot, then need do over again to the gudgeon weld seam.Because the particularity of workpiece material and structure, the welding quality when doing over again are difficult to control even the serious consequence that can cause gudgeon to scrap more.
Adopt molten steel jar, hot-metal bottle gudgeon interference hot-mounting process, can eliminate the potential safety hazard that the gudgeon weld defect causes.When carrying out gudgeon interference hot charging, trunnion seat is put into when being heated to design temperature in the heating cabinet, cuts off the electricity supply, open the heating cabinet loam cake, use hoisting crane trunnion seat to be transported on the support, carry out the fitting work of gudgeon and trunnion seat again through special-purpose suspension hook.Gudgeon is assembled in the axis hole of high temperature trunnion seat, works under hard conditions, adopt manual work that gudgeon is assembled in the axis hole of high temperature trunnion seat, work difficulty is big, and labour intensity is big, and is time-consuming, and can't guarantee assembly precision.
Summary of the invention
The purpose of the utility model is to provide a kind of molten steel jar, hot-metal bottle gudgeon interference hot charging to join the device of handling gudgeon; When implementing gudgeon interference hot-mounting process, adopt hoisting crane, handling gudgeon that can be safe and reliable promptly is transported to the trunnion seat top; Gudgeon is steadily inserted in the axis hole of trunnion seat; Guarantee assembly precision, alleviate working strength of workers, improve working conditions.
The purpose of the utility model is achieved in that a kind of molten steel jar, hot-metal bottle gudgeon interference hot charging join the device of handling gudgeon; Comprise gudgeon with axis hole; Its upper end of the suspension rod that is made up of steel pipe is installed with suspension ring through the through hole of symmetry; Through hole through symmetry on the steel pipe walls of suspension rod lower end is installed with the bearing pin that two ends pass steel pipe, the axis hole running-fit of suspension rod and gudgeon, and radial equipartition is being provided with one group of locating piece on the outer circumference surface of gudgeon.
When adopting the utility model handling gudgeon, suspension rod is packed in the axis hole of gudgeon, the suspension rod lower end has the lower end of symmetrical through hole and stretches out the gudgeon axis hole; In the through hole of suspension rod lower end, load onto bearing pin; The two ends of bearing pin pass suspension rod, and bearing pin is held gudgeon spacing, and the suspension hook of hoisting crane is hung the suspension ring of suspension rod; Through suspension rod with gudgeon promptly be transported to trunnion seat directly over; Aim at the axis hole of trunnion seat, gudgeon is inserted in the axis hole reposefully the last plane contact of locating piece on trunnion seat and trunnion seat.Behind the trunnion seat natural cooling, the interference hot charging allotment of labor of gudgeon and trunnion seat finishes.When implementing gudgeon interference hot-mounting process; The utility model has realized that employing crane safety failure-free handling gudgeon promptly is transported to the trunnion seat top, gudgeon is steadily inserted in the axis hole of trunnion seat, has guaranteed assembly precision; Alleviate working strength of workers, improved service conditions.
Description of drawings
To combine accompanying drawing that the utility model is done further to describe below, accompanying drawing 1 is the utility model sectional structure scheme drawing.
The specific embodiment
A kind of molten steel jar, hot-metal bottle gudgeon interference hot charging are joined the device of handling gudgeon; Shown in accompanying drawing 1; Comprise the gudgeon 3 with axis hole, suspension rod 2 its upper ends that are made up of steel pipe are installed with suspension ring 1 through the through hole of symmetry, and the through hole through symmetry on the steel pipe walls of suspension rod 2 lower ends is installed with the bearing pin 4 that two ends pass steel pipe; The axis hole running-fit of suspension rod 2 and gudgeon 3, radial equipartition is being provided with one group of locating piece 5 on the outer circumference surface of gudgeon 3.
The utility model practical implementation process:
1,, calculates the heating-up temperature and the constant temperature time of molten steel jar, hot-metal bottle trunnion seat according to the required minimal fit gap of gudgeon interference hot charging timing.
The trunnion seat that 2, will need hot charging to join is placed in the heating cabinet, connects temperature controller, is equipped with for molten steel jar, hot-metal bottle gudgeon interference hot charging and puts power supply, and trunnion seat is heated.
3, temperature controller detects and controls the temperature in the heating cabinet.When temperature reached preset heating-up temperature, temperature no longer rose, and is in temperature constant state.
4, treat that constant temperature time is enough, cut off the electricity supply, stop heating, the heating cabinet loam cake is opened, use elevator machinery trunnion seat to be transported on the support, and make the last plane of trunnion seat be in horizontality through suspension hook.
5, use elevator machinery through suspension rod with gudgeon promptly be transported to trunnion seat directly over, aim at assembly opening, gudgeon is inserted in the hole reposefully, up to the last plane contact of locating piece and trunnion seat.Behind the trunnion seat natural cooling.The interference hot charging allotment of labor of gudgeon and trunnion seat does promptly to accuse to accomplish.

Claims (1)

1. a molten steel jar, hot-metal bottle gudgeon interference hot charging are joined the device of handling gudgeon; Comprise gudgeon (3) with axis hole; It is characterized in that: its upper end of the suspension rod (2) that is made up of steel pipe is installed with suspension ring (1) through the through hole of symmetry; Through hole through symmetry on the steel pipe walls of suspension rod (2) lower end is installed with the bearing pin (4) that two ends pass steel pipe, the axis hole running-fit of suspension rod (2) and gudgeon (3), and radial equipartition is being provided with one group of locating piece (5) on the outer circumference surface of gudgeon (3).
CN2011203993200U 2011-10-19 2011-10-19 Device for interference hot-assembly and hoisting of ladle and hot-metal ladle trunnion Expired - Fee Related CN202321993U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203993200U CN202321993U (en) 2011-10-19 2011-10-19 Device for interference hot-assembly and hoisting of ladle and hot-metal ladle trunnion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203993200U CN202321993U (en) 2011-10-19 2011-10-19 Device for interference hot-assembly and hoisting of ladle and hot-metal ladle trunnion

Publications (1)

Publication Number Publication Date
CN202321993U true CN202321993U (en) 2012-07-11

Family

ID=46433983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203993200U Expired - Fee Related CN202321993U (en) 2011-10-19 2011-10-19 Device for interference hot-assembly and hoisting of ladle and hot-metal ladle trunnion

Country Status (1)

Country Link
CN (1) CN202321993U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106429783A (en) * 2016-10-08 2017-02-22 霍尔果斯新国金新能源科技有限公司 Lifting device of concrete tower drum and lifting method applying lifting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106429783A (en) * 2016-10-08 2017-02-22 霍尔果斯新国金新能源科技有限公司 Lifting device of concrete tower drum and lifting method applying lifting device

Similar Documents

Publication Publication Date Title
CN103805767B (en) Steel coil support device for oriented silicon steel high-temperature heat treatment furnace with flow guide plates
CN202321993U (en) Device for interference hot-assembly and hoisting of ladle and hot-metal ladle trunnion
CN101934434B (en) Cast iron hot repair welding process and device
CN103145028A (en) Well type furnace hanging tool
CN201169490Y (en) Electric arc furnace body sling
CN104324972B (en) A kind of production method of heavy caliber superhigh intensity steel seamless steel tube
CN102002660A (en) Zinc liquid storage tank for hot galvanizing production line and method for storing zinc liquid by using same
CN202278180U (en) Device for lifting trunnion supports in process of carrying out interference hot-assembling on trunnions of molten-steel bottles and hot-metal bottles
CN204043182U (en) A kind of bearing heating device
CN203284431U (en) Sleeve and pipe parts heat treatment tool
CN211595733U (en) Heat treatment equipment for fastener processing
CN201799783U (en) Run-on plate and run-off plate for welding of fire-resisting non-metal material body
CN103447655A (en) Fixed semiautomatic flame cutting machine
CN205271774U (en) Graphite crucible's clamping device
CN204397174U (en) The laser lap welding clamp of galvanized steel plain sheet
CN203820860U (en) Steel roll support device with guide plates for high-temperature heat treatment furnace for oriented silicon steel
CN103924016B (en) A kind of method changing the large cover of cinder monkey
CN206084127U (en) Electro -slag welding with plate electrode equipment
CN209716888U (en) Auxiliary stand when for large diameter pipeline docking
CN204148805U (en) A kind of electrical heating hot jacket cage
CN105983758A (en) Gray cast iron welding process
CN204944169U (en) Casting smelting intermediate frequency furnace increase part
CN205324942U (en) Automatic argon arc welds build -up welding device
CN204944168U (en) Casting smelting intermediate frequency furnace
CN204565102U (en) Convertible casting ladle automatic baking device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120711

Termination date: 20141019

EXPY Termination of patent right or utility model