CN202321989U - Clamping device for carbon brick - Google Patents
Clamping device for carbon brick Download PDFInfo
- Publication number
- CN202321989U CN202321989U CN 201120439770 CN201120439770U CN202321989U CN 202321989 U CN202321989 U CN 202321989U CN 201120439770 CN201120439770 CN 201120439770 CN 201120439770 U CN201120439770 U CN 201120439770U CN 202321989 U CN202321989 U CN 202321989U
- Authority
- CN
- China
- Prior art keywords
- clamping
- arms
- arm
- jig arm
- carbon brick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
The utility model relates to a clamping device for a carbon brick. The clamping device for the carbon brick comprises a small hanging beam, pull arms, clamping arms, an upper pin shaft, a lower pin shaft and anti-skid clamping plates and is characterized in that shaft holes are formed at two ends of the pull arms; shaft holes are formed at the upper ends and in the middles of the clamping arms; upper shaft holes of the two pull arms are overlapped and hinged; lower shaft holes of the two pull arms are hinged with the upper shaft hole of one clamping arm respectively; and the shaft holes in the intersected middles of the two clamping arms are overlapped and hinged; the pull arms and the clamping arms for a four-linkage mechanism and form a clamping arm; two sets of clamping arms are arranged in parallel; two ends of the small hanging beam are connected with the upper shaft holes of the pull arms of the two sets of clamping arms; the upper pin shaft is connected with the pull arms of the two sets of clamping arms and the hinged shaft holes of the clamping arms; the lower pin shaft is connected with the middle shaft holes of the clamping arms of the two sets of clamping arms; and one anti-skid clamping plate is arranged at the lower end of each clamping arm. The clamping device for the carbon brick has the advantages that in the process of mounting and transporting the carbon bricks, the action such as clamping, lifting, operating, loosing and the like can be implemented quickly.
Description
Technical field:
The utility model relates to a kind of carbon brick gripping mechanism, belongs to the gripping mechanism field of building metallurgical construction.
Background technology:
In metallurgical construction, the furnace lining of some metallurgical industrial furnace etc. need to adopt carbon brick as refractory material.Build by laying bricks or stones such as adopting carbon brick at the bottom of the State of Blast Furnace of ironmaking usefulness; Also have the furnace bottom of the electrolytic bath of electrolgtic aluminium also to build by laying bricks or stones with carbon brick, this moment, carbon brick was both worked as refractory material, worked as the cathode block of conduction usefulness again.The monolithic weight of these carbon bricks is generally the hundreds of kilogram, therefore in transportation, needs lifting in the processes such as installation.General carbon brick is a strip, and cross sectional shape be near square, and needs used the clamp clamps carbon brick in hoisting process, operation such as sling again, fall.Thereby need a kind of high-efficiency reliable instrument to supply the workmen to use.
Summary of the invention:
The purpose of the utility model provides a kind of carbon brick that can failure-free clamps, and can enough hoist cables or the sling carbon brick gripping mechanism of carbon brick of suspension hook failure-free.
The purpose of the utility model realizes in the following manner:
The utility model comprises little hanging beam, torque arm, jig arm, upper pin, lower bearing pin, anti-skidding clamping plate; It is characterized in that: all there is axis hole at the two ends of torque arm; The upper end and the middle part of jig arm are provided with axis hole; With the overlapping hinge of the upper shaft hole of two torque arm connect, the lower shaft hole of two torque arm is connected with the upper shaft hole hinge of a jig arm respectively, two jig arm intersects in the middle part of the overlapping and hinge connection of axis hole; Torque arm and jig arm form four-bar linkage, constitute a cover holder arms of the utility model, and two cover holder arms are laterally arranged; The upper shaft hole that connects the torque arm of two cover holder arms therebetween with the two ends of little hanging beam as hinge axis respectively; Connect the torque arm and the hinged axis hole of jig arm of two cover holder arms with the two ends of upper pin respectively as hinge axis, connect two with the two ends of lower bearing pin respectively as hinge axis and overlap the middle part axis hole of the jig arm of holder arms, anti-skidding clamping plate are installed in the lower end of each jig arm.
The utility model has the advantages that: install at carbon brick, can fast speed in the transportation implement clamping, lifting, operation, action such as unclamp.
Description of drawings:
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the lateral plan of Fig. 1.
The specific embodiment:
With reference to accompanying drawing, the utility model comprises little hanging beam 1, torque arm 2, jig arm 7, upper pin 3, lower bearing pin 6, anti-skidding clamping plate 8, and torque arm 2 usefulness steel plates are processed, and two ends are porose, and little hanging beam 1 is inserted in the upper end, and bearing pin 3 is plugged in the lower end; Jig arm 7 is also processed by steel plate, and the upper end and the middle part of jig arm 7 are provided with axis hole.With the overlapping hinge of the upper shaft hole of two torque arm 2 connect, the lower shaft hole of two torque arm 2 is connected with the upper shaft hole hinge of a jig arm 7 respectively, two jig arm 7 intersects in the middle part of the overlapping and hinge connection of axis hole; Torque arm 7 forms four-bar linkage with jig arm 2; Constitute a cover holder arms of the utility model; Two cover holder arms are laterally arranged; Connect the upper shaft hole of the torque arm of two cover holder arms with the two ends of little hanging beam 1 respectively as hinge axis therebetween, the termination is fixing with zero diopter pad 4, nut 5, connects two with upper pin 3 respectively as hinge axis and overlaps the torque arm of holder arms and the hinged axis hole of jig arm; Connect two with lower bearing pin 6 respectively as hinge axis and overlap the middle part axis hole of the jig arm of holder arms, anti-skidding clamping plate 8 are installed in the lower end of each jig arm 7.
During use, hang little hanging beam 1, for ease lifting with suspension hook or hoist cable; Middle part at little hanging beam 1 is provided with lifting hole(eyelet), and this device is put in the centre on the carbon brick 9, and draws back jig arm 7; Make it be in the state of clamping carbon brick 9, when suspension hook lifted by crane, this clamp just can be clamped carbon brick and lift by crane simultaneously; When carbon brick fell within the desired location, clamp also unclamped automatically when suspension hook or hoist cable unclamped.
Claims (1)
1. carbon brick gripping mechanism; Comprise little hanging beam, torque arm, jig arm, upper pin, lower bearing pin, anti-skidding clamping plate; It is characterized in that: all there is axis hole at the two ends of torque arm; The upper end and the middle part of jig arm are provided with axis hole, with the overlapping hinge of the upper shaft hole of two torque arm connect, the lower shaft hole of two torque arm is connected with the upper shaft hole hinge of a jig arm respectively, two jig arm are intersected the overlapping and hinge connection of middle part axis hole, torque arm and jig arm formation four-bar linkage; Constitute a cover holder arms; Two cover holder arms are laterally arranged, connect the upper shaft hole of the torque arm of two cover holder arms with the two ends of little hanging beam respectively as hinge axis therebetween, connect two with the two ends of upper pin respectively as hinge axis and overlap the torque arm of holder arms and the hinged axis hole of jig arm; Connect the middle part axis hole of the jig arm of two cover holder arms with the two ends of lower bearing pin respectively as hinge axis, anti-skidding clamping plate are installed in the lower end of each jig arm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120439770 CN202321989U (en) | 2011-11-09 | 2011-11-09 | Clamping device for carbon brick |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120439770 CN202321989U (en) | 2011-11-09 | 2011-11-09 | Clamping device for carbon brick |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202321989U true CN202321989U (en) | 2012-07-11 |
Family
ID=46433979
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201120439770 Expired - Lifetime CN202321989U (en) | 2011-11-09 | 2011-11-09 | Clamping device for carbon brick |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202321989U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103640960A (en) * | 2013-11-21 | 2014-03-19 | 南通山口精工机电有限公司 | Suspension hook structure |
CN104438910A (en) * | 2014-12-11 | 2015-03-25 | 重庆欣欣向荣精细化工有限公司 | Steel pipe clamp |
CN104594650A (en) * | 2014-12-26 | 2015-05-06 | 天津二十冶建设有限公司 | Carbon brick erecting device |
CN105364906A (en) * | 2015-10-30 | 2016-03-02 | 嵊州四明山新型建材有限公司 | Low-strength and labor-saving type clamp special for suspended bricks |
CN105416969A (en) * | 2015-10-30 | 2016-03-23 | 嵊州四明山新型建材有限公司 | Two-stage articulated clamp special for suspended bricks |
CN107914281A (en) * | 2016-10-09 | 2018-04-17 | 张家港市博雅文化传播有限公司 | A kind of carrying robot manipulator |
CN108489751A (en) * | 2018-04-09 | 2018-09-04 | 国电环境保护研究院有限公司 | A kind of sampler of cellular catalyst |
CN112012056A (en) * | 2020-09-17 | 2020-12-01 | 青海省能源发展(集团)有限责任公司 | Mechanical track lifting device for light rail operation |
-
2011
- 2011-11-09 CN CN 201120439770 patent/CN202321989U/en not_active Expired - Lifetime
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103640960A (en) * | 2013-11-21 | 2014-03-19 | 南通山口精工机电有限公司 | Suspension hook structure |
CN104438910A (en) * | 2014-12-11 | 2015-03-25 | 重庆欣欣向荣精细化工有限公司 | Steel pipe clamp |
CN104594650A (en) * | 2014-12-26 | 2015-05-06 | 天津二十冶建设有限公司 | Carbon brick erecting device |
CN105364906A (en) * | 2015-10-30 | 2016-03-02 | 嵊州四明山新型建材有限公司 | Low-strength and labor-saving type clamp special for suspended bricks |
CN105416969A (en) * | 2015-10-30 | 2016-03-23 | 嵊州四明山新型建材有限公司 | Two-stage articulated clamp special for suspended bricks |
CN107914281A (en) * | 2016-10-09 | 2018-04-17 | 张家港市博雅文化传播有限公司 | A kind of carrying robot manipulator |
CN108489751A (en) * | 2018-04-09 | 2018-09-04 | 国电环境保护研究院有限公司 | A kind of sampler of cellular catalyst |
CN108489751B (en) * | 2018-04-09 | 2024-04-12 | 国电环境保护研究院有限公司 | Sampling device of honeycomb catalyst |
CN112012056A (en) * | 2020-09-17 | 2020-12-01 | 青海省能源发展(集团)有限责任公司 | Mechanical track lifting device for light rail operation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202321989U (en) | Clamping device for carbon brick | |
CN103803407A (en) | Lifting appliance and method for lifting electrode placed in electrode tray | |
CN201785123U (en) | Turn-over hanger | |
CN216512418U (en) | Hoisting tool for processing cathode carbon block | |
CN202967888U (en) | Electric smelting brick hoisting clamp | |
CN212292520U (en) | Clamp for steel slag | |
CN2878309Y (en) | Clamper for hanging heavy object | |
CN202988558U (en) | Multi-purpose furnace burden plate hanger device | |
CN203033638U (en) | Lifting device for hoisting slewing support rings of excavator | |
CN212769429U (en) | Fast assembling and disassembling clamp for concrete electric pole | |
CN207973403U (en) | Cover board suspender | |
CN106629376B (en) | A kind of angle regulation method of Electromagnetic slings for lifting loads | |
CN211393575U (en) | Multipurpose lifting appliance | |
CN103058049A (en) | Multi-purpose furnace charge plate lifting device | |
CN200954977Y (en) | Coke-over door safety hoisting device | |
CN203998573U (en) | A kind of overhead hoist | |
CN202358831U (en) | Clamp for crucible | |
CN202414964U (en) | Travelling crane hoisting auxiliary device | |
CN212334355U (en) | Hoisting clamp for cylindrical steel ingot | |
CN112027894A (en) | Clamp for steel slag | |
CN202089681U (en) | Graphite crucible clamp | |
CN104108646A (en) | Overhead hoist device | |
CN203428733U (en) | Refractory brick weighing type hanging clamp | |
CN213415990U (en) | Lifting appliance for lifting nuclear power bent pipe | |
CN218145310U (en) | Intermediate frequency furnace handling structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20120711 |
|
CX01 | Expiry of patent term |