CN202303882U - Heat pump water heater with heat recovery function - Google Patents

Heat pump water heater with heat recovery function Download PDF

Info

Publication number
CN202303882U
CN202303882U CN2011203783999U CN201120378399U CN202303882U CN 202303882 U CN202303882 U CN 202303882U CN 2011203783999 U CN2011203783999 U CN 2011203783999U CN 201120378399 U CN201120378399 U CN 201120378399U CN 202303882 U CN202303882 U CN 202303882U
Authority
CN
China
Prior art keywords
electric heater
water
heat exchanger
water tank
waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203783999U
Other languages
Chinese (zh)
Inventor
陈伯清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GD Midea Heating and Ventilating Equipment Co Ltd
Original Assignee
Midea Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Midea Group filed Critical Midea Group
Priority to CN2011203783999U priority Critical patent/CN202303882U/en
Application granted granted Critical
Publication of CN202303882U publication Critical patent/CN202303882U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

A heat pump water heater with heat recovery comprises a compressor, a water tank provided with a condenser, a throttling component, an evaporator, a bath wastewater collecting disc and a waste heat exchanger, wherein the compressor, the condenser, the throttling component and the evaporator are sequentially connected, and the superheated heat exchanger is sleeved on a refrigerant outlet pipe of the evaporator in a penetrating manner; the overheating heat exchanger, the waste heat exchanger and the bath wastewater collecting disc are sequentially connected in series to form a wastewater heat recovery system. The waste water heat recovery system also comprises a water pump which is connected between the waste heat exchanger and the bathing waste water collecting tray in series. A first electric heater and a second electric heater are arranged in the water tank, wherein the first electric heater is arranged at the upper part of the water tank, and the second electric heater is arranged at the lower part of the water tank. The water tank is provided with a water outlet which is arranged above the first electric heater. The utility model has the characteristics of simple structure is reasonable, the flexible operation, efficiency relative altitude, application scope are wide.

Description

The Teat pump boiler of band recuperation of heat
Technical field
The utility model relates to a kind of Teat pump boiler, particularly a kind of Teat pump boiler with recuperation of heat.
Background technology
Advocate energetically under the situation of energy-saving and emission-reduction in country at present, improve the efficiency of Teat pump boiler, reducing power consumption is the main trend of Teat pump boiler.Teat pump boiler also has a disadvantage, when water consumption is big, only depends on refrigeration system to heat, and firing rate is fast inadequately, and heat time heating time is long, can cause hot water not enough, and the people of back can't bathing.To this situation; A little improvement have been done by some manufacturer; A kind of afterheat recovery type Teat pump boiler was disclosed on March 16th, 2005 like Chinese patent document number CN 2685749Y; Comprise compressor, water tank, throttle part, residual evaporator, the evaporimeter of heat exchanger are installed, wherein the air inlet of the heat exchanger of the gas outlet of compressor, water tank, throttle part, residual evaporator, evaporimeter, compressor is communicated with successively, and the top of residual evaporator is provided with the waste heat preheater; The water inlet of water tank is connected with the delivery port of the heat exchanger of waste heat preheater, and the water inlet of the heat exchanger of waste heat preheater is connected with water supply pipeline.Though the afterheat recovery type Teat pump boiler of this structure has utilized waste heat,, its actual result of use is not ideal enough.
The utility model content
The purpose of the utility model aims to provide the Teat pump boiler of a kind of simple and reasonable, flexible operation, band recuperation of heat that Energy Efficiency Ratio is high, applied widely, to overcome weak point of the prior art.
A kind of Teat pump boiler by this purpose design with recuperation of heat; Comprise compressor, water tank, throttle part, evaporimeter, shower wastewater collection dish, the waste heat exchanger of condenser are installed; Compressor, condenser, throttle part and evaporimeter join successively; Its architectural feature is also to comprise heat exchanger, and the refrigerant that the mistake heat exchanger is set on evaporimeter goes out on the pipe; Crossing heat exchanger, waste heat exchanger, shower wastewater collection dish is connected in series the back successively and constitutes the waste water heat recovery system.
Said waste water heat recovery system also comprises water pump, and water pump is serially connected between waste heat exchanger and the shower wastewater collection dish.
Be provided with first electric heater and second electric heater in the said water tank, wherein, first electric heater is arranged on the top of water tank, and second electric heater is arranged on the bottom of water tank.
Said water tank is provided with delivery port, and this delivery port is arranged on the top of first electric heater.
Be provided with temperature sensor in the said water tank, this temperature sensor is arranged between first electric heater and second electric heater.
After the utility model adopted above-mentioned technical scheme, when its work, the wastewater temperature after the bathing descended few, with the temperature difference that 10~20 degree are arranged between the running water; Extract the waste water in the shower wastewater collection dish through water pump, the waste water preheating of running water after waste heat exchanger and bathing raises the temperature of running water; Reduce the heating temperature difference of running water, promote the firing rate in the water tank, thereby improve the unit efficiency; Reduce power consumption, cut down the consumption of energy, and; The temperature of waste water of carrying out heat exchange through waste heat exchanger is still high than the refrigerant temperature after evaporation, carries out heat exchange through the cold-producing medium after heat exchanger and the evaporation, can increase the degree of superheat of cold-producing medium; Improve the suction temperature of cold-producing medium, thereby make the delivery temperature of cold-producing medium be able to promote, improve the unit efficiency.
The utility model is provided with first electric heater and second electric heater in water tank; Can guarantee under any circumstance all to have hot water to use; Have conveniently, the characteristics of comfortable and fast heat, it has simple and reasonable, flexible operation, high, the advantage of wide range of application of Energy Efficiency Ratio.
Description of drawings
Fig. 1 is the utility model one example structure sketch map.
Fig. 2 is the fundamental diagram of the utility model.
Among the figure: 1 is shell, and 2 is compressor, and 3 is four-way change-over valve, and 4 is throttle part, and 5 was heat exchanger; 6 is fan blade, and 7 is motor, and 8 is evaporimeter, and 9 is water pump; 10 is first electric heater, and 11 is temperature sensor, and 12 is second electric heater, and 13 is waste heat exchanger; 14 is condenser, and 15 are shower wastewater collection dish, and 20 is water tank, and 20.1 is delivery port.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is further described.
Referring to Fig. 1-Fig. 2; The Teat pump boiler of this band recuperation of heat; Comprise compressor 2, water tank 20, throttle part 4, evaporimeter 8, shower wastewater collection dish 15, the waste heat exchanger 13 of condenser 14 are installed; Compressor 2, condenser 14, throttle part 4 and evaporimeter 8 join successively, and the refrigerant that mistake heat exchanger 5 is set on evaporimeter 8 goes out on the pipe; Cross heat exchanger 5, waste heat exchanger 13, shower wastewater collection dish 15 and be connected in series back formation waste water heat recovery system successively.
The waste water heat recovery system also comprises water pump 9, and water pump 9 is serially connected between waste heat exchanger 13 and the shower wastewater collection dish 15.
For guaranteeing that hot water usefulness is under any circumstance all arranged, in water tank 20, be provided with first electric heater 10 and second electric heater 12, wherein, first electric heater 10 is arranged on the top of water tank 20, and second electric heater 12 is arranged on the bottom of water tank 20; These two electric heaters can be used for when hot water is not enough, realize Fast Heating.
Water tank 20 is provided with delivery port 20.1, and this delivery port 20.1 is arranged on the top of first electric heater 10.Be provided with temperature sensor 11 in the water tank 20, this temperature sensor 11 is arranged between first electric heater 10 and second electric heater 12.
When this product when operation energising, when the water level switch that carries through water pump detects and in the shower wastewater collection dish water arranged, start water pump pump water and get in the waste heat exchanger, carry out heat exchange with running water, the preheating running water is reduced in the heating temperature difference in the water tank; Shower waste water is through behind the waste heat exchanger, got in the heat exchanger with evaporation after cold-producing medium carry out heat exchange, improve the degree of superheat of cold-producing medium.
When this product when operation energising, water flow switch detects when using hot water and leaving water temperature sensor when detecting water temperature and being lower than design temperature, starts the heating of first electric heater, and heating rapidly guarantees leaving water temperature.After first electric heater started 60s, second electric heater started, and first electric heater 10, second electric heater 12 and compressor are worked together; When the water temperature in temperature sensor detects water tank reached design temperature, compressor quit work before prior to first electric heater and the second electric heater 20s.To guarantee the use of hot water.

Claims (5)

1. Teat pump boiler with recuperation of heat; Comprise compressor (2), water tank (20), throttle part (4), evaporimeter (8), shower wastewater collection dish (15), the waste heat exchanger (13) of condenser (14) are installed; Compressor (2), condenser (14), throttle part (4) and evaporimeter (8) join successively; It is characterized in that also comprising heat exchanger (5), the refrigerant that mistake heat exchanger (5) is set on evaporimeter (8) goes out on the pipe; Cross heat exchanger (5), waste heat exchanger (13), shower wastewater collection dish (15) and be connected in series back formation waste water heat recovery system successively.
2. the Teat pump boiler of band recuperation of heat according to claim 1 is characterized in that said waste water heat recovery system also comprises water pump (9), and water pump (9) is serially connected between waste heat exchanger (13) and the shower wastewater collection dish (15).
3. the Teat pump boiler of band recuperation of heat according to claim 1 and 2; It is characterized in that being provided with in the said water tank (20) first electric heater (10) and second electric heater (12); Wherein, First electric heater (10) is arranged on the top of water tank (20), and second electric heater (12) is arranged on the bottom of water tank (20).
4. the Teat pump boiler of band recuperation of heat according to claim 3 is characterized in that said water tank (20) is provided with delivery port (20.1), and this delivery port (20.1) is arranged on the top of first electric heater (10).
5. the Teat pump boiler of band recuperation of heat according to claim 4 is characterized in that being provided with in the said water tank (20) temperature sensor (11), and this temperature sensor (11) is arranged between first electric heater (10) and second electric heater (12).
CN2011203783999U 2011-10-08 2011-10-08 Heat pump water heater with heat recovery function Expired - Fee Related CN202303882U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203783999U CN202303882U (en) 2011-10-08 2011-10-08 Heat pump water heater with heat recovery function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203783999U CN202303882U (en) 2011-10-08 2011-10-08 Heat pump water heater with heat recovery function

Publications (1)

Publication Number Publication Date
CN202303882U true CN202303882U (en) 2012-07-04

Family

ID=46372766

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203783999U Expired - Fee Related CN202303882U (en) 2011-10-08 2011-10-08 Heat pump water heater with heat recovery function

Country Status (1)

Country Link
CN (1) CN202303882U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225880A (en) * 2013-04-11 2013-07-31 王子忠 Ultra-energy saving double-heat source, double-recycle heat pump water heater system
CN104764194A (en) * 2015-03-11 2015-07-08 柳州宇特能源科技有限公司 Hydro-energy hot water engineering machine system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225880A (en) * 2013-04-11 2013-07-31 王子忠 Ultra-energy saving double-heat source, double-recycle heat pump water heater system
CN104764194A (en) * 2015-03-11 2015-07-08 柳州宇特能源科技有限公司 Hydro-energy hot water engineering machine system
CN104764194B (en) * 2015-03-11 2017-12-12 柳州宇特能源科技有限公司 Water energy hot water engineering machine system

Similar Documents

Publication Publication Date Title
CN101240949B (en) Cascade energy usable variable capacity family energy resource system
CN102418998A (en) Energy storage water source heat pump water heater with shower wastewater and waste heat double-absorption function
CN203704343U (en) Energy-saving bathing waste heat recovery water heater unit
CN201569214U (en) Multifunctional air source heat pump water heater
CN101799205B (en) Heat pump hot water system capable of preparing high temperature hot water
CN203464538U (en) Instant-heating adjustable air-energy water boiler capable of providing hot water and cold water
CN201387143Y (en) High-temperature energy-saving water heater device for low-temperature air source heat pump with storing and dividing device
CN202008184U (en) Instant electric heating type solar heat supply system
CN202303882U (en) Heat pump water heater with heat recovery function
CN202938548U (en) Central air-conditioning cold/hot water system for industrial waste heat recycling
CN200940918Y (en) Heat recovery apparatus having air cooling heat pump system
CN202328769U (en) Energy accumulation type water source heat pump water heater capable of doubly absorbing waste water and waste heat of shower bath
CN202216396U (en) Multistage sleeve heat exchange type heat pump water heater
CN202254272U (en) Household waste heat recovery system
CN2884019Y (en) Quickly heating type air-conditioner water heater having hot water-tank
CN202008190U (en) Heating system complementarily using solar energy, air source and electric energy
CN205448297U (en) Energy -conserving air conditioner water heater
CN201561566U (en) Heat pump capable of simultaneously supplying high-temperature hot water and medium-temperature hot water
CN104142036A (en) Solar and biogas combined heat pump system
CN204115223U (en) air injection enthalpy increasing heat pump water heater
CN200986311Y (en) Double system air conditioner heat pump water heater
CN204373118U (en) The heating and air-conditioning system that thermal power plant electric heat pump and steam-operating heat pump combine
CN202470413U (en) Improved waste heat recycling type heat-pump water heater shower bath device
CN202074696U (en) Low-temperature air injection enthalpy increasing heat pump water heater
CN202470416U (en) Air source heat pump water heater

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: MIDEA GROUP CO., LTD.

Free format text: FORMER NAME: MEIDI GROUP CO. LTD.

CP03 Change of name, title or address

Address after: 528311, Guangdong, Foshan Town, Shunde District, Beijiao, 6 beautiful avenue, beautiful headquarters building, B District, 26 - 28 floor

Patentee after: MIDEA GROUP Co.,Ltd.

Address before: 528311 Beijiao, Foshan, Shunde District, the town of Guangdong, the United States Avenue, No. 6

Patentee before: Midea Group

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160129

Address after: 528311 Beijiao, Guangdong, Shunde Town, Penglai Road, Industrial Avenue,

Patentee after: GD MIDEA HEATING & VENTILATING EQUIPMENT Co.,Ltd.

Address before: 528311, Guangdong, Foshan Town, Shunde District, Beijiao, 6 beautiful avenue, beautiful headquarters building, B District, 26 - 28 floor

Patentee before: MIDEA GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20191008

CF01 Termination of patent right due to non-payment of annual fee