CN202300435U - Telescopic joint of steel pipe concrete support - Google Patents
Telescopic joint of steel pipe concrete support Download PDFInfo
- Publication number
- CN202300435U CN202300435U CN 201120436397 CN201120436397U CN202300435U CN 202300435 U CN202300435 U CN 202300435U CN 201120436397 CN201120436397 CN 201120436397 CN 201120436397 U CN201120436397 U CN 201120436397U CN 202300435 U CN202300435 U CN 202300435U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- support
- joint
- concrete
- pipe
- Prior art date
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 43
- 239000010959 steel Substances 0.000 title claims abstract description 43
- 229920003023 plastics Polymers 0.000 claims abstract description 24
- 239000004033 plastics Substances 0.000 claims abstract description 24
- 230000003014 reinforcing Effects 0.000 claims description 11
- 239000004576 sand Substances 0.000 claims description 5
- 210000001503 Joints Anatomy 0.000 abstract description 4
- 238000005086 pumping Methods 0.000 abstract description 3
- 239000011435 rock Substances 0.000 abstract description 3
- 230000000694 effects Effects 0.000 description 2
- 230000028327 secretion Effects 0.000 description 2
- 238000007906 compression Methods 0.000 description 1
- 230000001808 coupling Effects 0.000 description 1
- 238000005516 engineering processes Methods 0.000 description 1
- 230000002194 synthesizing Effects 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Abstract
Description
Affiliated technical field
The utility model relates to a kind of joint, specifically is a kind of steel pipe concrete bracket contractibility joint, mainly is applicable to the connection of the steel pipe concrete bracket that uses under the mine, can under the pressure effect of ore deposit, produce and contract, realizes letting compression functions.
Background technology
What the bearing capacity of in Deep Mine, generally acknowledging at present was maximum is steel pipe concrete bracket, and this support is installed empty steel pipe support earlier, and joint area connects with sleeve or flange, and the back is concrete perfusion in pipe, after the sclerosis of pipe inner concrete, promptly forms steel pipe concrete bracket.But this support can't contract and let pressure, and drag rises to a certain degree support and damages easily in interacting with country rock.
Summary of the invention
In order to overcome the drawback that existing steel pipe concrete bracket can not contract, the utility model provides a kind of steel pipe concrete bracket contractibility joint, and this joint is easy to operate, neither influences the perfusion of support integral tube inner concrete, can realize contracting behind the support force again.
The utility model solves the technical scheme that its technical problem adopted: a kind of steel pipe concrete bracket contractibility joint; Comprise stand steel pipe, link together with bolt by two flanged (FLGD) semicircle sleeves and form sleeve that the sleeve lock ring is on stand steel pipe; Secretion has at least one loop plastic pipe between the joint of two stand steel pipe; In described ring-shaped plastics pipe, be installed with a reinforcing bar, and be filled with sand, the reinforcing bar two ends are wrapped in desires on the connector.
Method of operating is: before concrete perfusion in stand steel pipe; Embed the ring-shaped plastics pipe at place, steel pipe sections play movement in advance; Put on plain bar in the pipe and fill sand; When if Support joint needs deformation allowance bigger, then vertically stack a plurality of such plastics pipe rings or a long plastic pipe around many circles along steel pipe, steel bar end involves on stand steel pipe.Then with the sleeve cuff outside Support joint, the bolt sleeve of screwing is waled stand steel pipe.After the concreting, untie bolt and open sleeve, hold one of plain bar and take off the plastics pipe ring, promptly form the weakness band that has only middle concrete column.Again overlap upper bush, clamp flange bolt, chucking stand steel pipe.When support force to a certain degree, joint sleeve inner concrete post begins conquassation and breaks, support begins to contract, this moment can also through screwing of bolt limit contract or bolt loosen realize contracting moving.
The beneficial effect of the utility model is: in cuff two couplings, both reserved deflection, and do not influenced the whole concrete uninterrupted pumping of support again, and realized contracting behind the stent forming again, method is simple, and is easy to operate.On steel pipe concrete bracket, use some the utility model joints, can effectively reduce the pressure from surrounding rock that acts on the support, prevent the support unstable failure.
Description of drawings
Fig. 1 is the plan view of the utility model joint;
Fig. 2 is flanged (FLGD) semicircle sleeve constructional drawing;
Fig. 3 is the transverse cross-sectional view of joint;
Fig. 4 wears the reinforcing bar sketch map in the plastic pipe.
Among the figure: 1001. stand steel pipe, 1002. flanges, 1003. ring-shaped plastics pipes, 2001. sleeves, 3001. bolts, 4001, reinforcing bar.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is further specified.
Like Fig. 1, Fig. 2 and shown in Figure 3; Steel pipe concrete bracket contractibility joint comprises stand steel pipe 1001, sleeve 2001; Sleeve 2001 lock rings are on the junction of two stand steel pipe 1001, and sleeve 2001 is linked together with flange on it 1002 and bolt 3001 by two semicircle sleeves.Secretion has at least one ring-shaped plastics pipe 1003 between the joint of two stand steel pipe 1001, in described ring-shaped plastics pipe 1003, is installed with a reinforcing bar 4001, and is filled with sand, and it is on the steel pipe 1001 that the reinforcing bar two ends are wrapped in the desire connector.The diameter of ring-shaped plastics pipe 1003 is the diameter 1/3 of stand steel pipe 1001.
As shown in Figure 3, flanged plate is vertically welded in the axial edge of each semicircle pipe, makes the two halves pipe to after synthesizing a round tube shape, can be through the cross section size of the synthetic pipe of the adjustment of the bolt on the flange.
Like Fig. 3 and shown in Figure 4; With the plain bar 4001 of wearing a φ 6 in the ring-shaped plastics pipe 1003; In plastic pipe 1003, be full of sand then, be embedded among Fig. 1 gap between two sections stand steel pipe 1001 around the city ring-type then, the plastic pipe ring-type around the number of turns by the size decision of the reservation amount that contracts.Two sections stand steel pipe 1001 compresses plastics pipe ring 1003; For preventing 1003 slips of plastics pipe ring and being washed away by concrete; Reinforcing bar in the plastics pipe ring 1,003 4001 is stayed place's sufficient length; And the part that its two ends grow is wrapped in respectively on stand steel pipe 1001 joints of place, then firmly with flanged 1002 semicircle sleeve 2001 extruding, and the bolt 3001 of screwing.At this moment, the reinforcing bar 4001 of winding tightly is squeezed on the stand steel pipe 1001 by sleeve 2001, has both fixed plastics pipe ring 1003, can increase the clamping force of sleeve 2001 again as packing ring, can also effectively prevent concrete spillage herein.
Support is untied the bolt on the flange 1,002 3001 after concrete pumping and health sclerosis, holds 4,001 one of reinforcing bars and takes off plastics pipe ring 1003; The promptly surplus next minor diameter concrete column in junction; Again overlap upper bush 2001 then, clamp flange bolt 3001, chucking stand steel pipe 1001.When support force acquires a certain degree, joint inner concrete post conquassation distortion, support begins to realize contracting.After this can also adjust the support momentum that contracts through the degree of tightness of bolt.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120436397 CN202300435U (en) | 2011-11-07 | 2011-11-07 | Telescopic joint of steel pipe concrete support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120436397 CN202300435U (en) | 2011-11-07 | 2011-11-07 | Telescopic joint of steel pipe concrete support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202300435U true CN202300435U (en) | 2012-07-04 |
Family
ID=46369357
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201120436397 CN202300435U (en) | 2011-11-07 | 2011-11-07 | Telescopic joint of steel pipe concrete support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202300435U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102966185A (en) * | 2012-12-06 | 2013-03-13 | 河北联合大学 | Novel concrete-filled steel tube connection joint and construction method thereof |
CN103485804A (en) * | 2013-10-09 | 2014-01-01 | 山东科技大学 | Concrete-filled steel tube support pressure-transfer component and installation method thereof |
CN103510969A (en) * | 2013-10-11 | 2014-01-15 | 山东科技大学 | Concrete-filled steel tube support continuously progressive pressure yielding contractible device and application method thereof |
CN104790976A (en) * | 2015-04-28 | 2015-07-22 | 中铁工程设计咨询集团有限公司 | Composite column core structure for tunnel lining and manufacturing method of composite column core structure |
CN106677809A (en) * | 2017-02-22 | 2017-05-17 | 天津大学 | Contractible fabricated steel plate support |
-
2011
- 2011-11-07 CN CN 201120436397 patent/CN202300435U/en not_active IP Right Cessation
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102966185A (en) * | 2012-12-06 | 2013-03-13 | 河北联合大学 | Novel concrete-filled steel tube connection joint and construction method thereof |
CN102966185B (en) * | 2012-12-06 | 2014-07-30 | 河北联合大学 | Novel concrete-filled steel tube connection joint and construction method thereof |
CN103485804A (en) * | 2013-10-09 | 2014-01-01 | 山东科技大学 | Concrete-filled steel tube support pressure-transfer component and installation method thereof |
CN103510969A (en) * | 2013-10-11 | 2014-01-15 | 山东科技大学 | Concrete-filled steel tube support continuously progressive pressure yielding contractible device and application method thereof |
CN103510969B (en) * | 2013-10-11 | 2016-01-27 | 山东科技大学 | Steel pipe concrete bracket continues the progressive pressure that allows can compression apparatus and using method thereof |
CN104790976A (en) * | 2015-04-28 | 2015-07-22 | 中铁工程设计咨询集团有限公司 | Composite column core structure for tunnel lining and manufacturing method of composite column core structure |
CN106677809A (en) * | 2017-02-22 | 2017-05-17 | 天津大学 | Contractible fabricated steel plate support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3434951B1 (en) | Box-type pipeline with circumferential obtuse angle connection | |
CN103452246B (en) | The grouting deformed steel pipe box cylinder that the slurry anchor docking of a kind of reinforcing bar connects | |
CN103758292B (en) | The full grout sleeve of a kind of shearing enhancement mode | |
WO2018219196A1 (en) | Precast column base joint and construction method therefor | |
US8622093B2 (en) | Vibration-resistant reinforced concrete watertight pipe and method of manufacturing the same | |
CN202360912U (en) | Reinforced composite tube wound by continuous fiber preimpregnation belts | |
CN103216044B (en) | The cement grouting steel bar connecting structure of precast unit | |
CN204456162U (en) | A kind of pulling-resistant type prefabricated tubular pile be connected with cushion cap | |
CN203113627U (en) | Nodular cast iron grout sleeve for connecting longitudinal steel bars | |
CN101994316A (en) | Recyclable composite anchor rod and construction method thereof | |
CN202176063U (en) | Cement grout rebar connecting joint | |
CN203533002U (en) | Composite abrasion-resistant and pressure-resistant pipeline | |
CN101476348A (en) | Steel pipe concrete segment type coat node and its construction method | |
CN103711122B (en) | A kind of cloth bag expands the construction method of squeezing concrete support disk pile | |
CN103758291A (en) | Shearing reinforcing type semi-grouting sleeve | |
CN104453015A (en) | Reinforcing bar splicing connection component comprising thin-wall sleeves constrained by spiral bars | |
CN105625641B (en) | A kind of FRP grout sleeves for bar connecting | |
CN203569720U (en) | Self-resetting triple steel tube restraining buckling support | |
CN201843129U (en) | Ribbed concrete composite pile core pipe | |
CN102644284A (en) | Method and device for post grouting in pile bottom | |
CN105201514A (en) | Water-bearing rock stratum borehole wall structure and construction method | |
CN204163287U (en) | Roll forming bar connecting grout sleeve | |
CN102359683A (en) | Plunger-type double-safety pipeline compensator | |
CN107882051A (en) | A kind of conical pipe anchor bar connecting structure for precast assembly structure | |
CN203131261U (en) | Pipeline bell and spigot joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |