CN202298621U - 管桩替打装置 - Google Patents

管桩替打装置 Download PDF

Info

Publication number
CN202298621U
CN202298621U CN2011203785439U CN201120378543U CN202298621U CN 202298621 U CN202298621 U CN 202298621U CN 2011203785439 U CN2011203785439 U CN 2011203785439U CN 201120378543 U CN201120378543 U CN 201120378543U CN 202298621 U CN202298621 U CN 202298621U
Authority
CN
China
Prior art keywords
pile tube
main body
utility
model
tubular pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203785439U
Other languages
English (en)
Inventor
陆仁军
王�忠
平卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ZHEZHONG GROUP CO., LTD.
Original Assignee
SHANGHAI ZHESHI BUILDING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ZHESHI BUILDING CO Ltd filed Critical SHANGHAI ZHESHI BUILDING CO Ltd
Priority to CN2011203785439U priority Critical patent/CN202298621U/zh
Application granted granted Critical
Publication of CN202298621U publication Critical patent/CN202298621U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

本实用新型公开了一种管桩替打装置,包括主体和位于主体底部边缘的环板构成,所述主体底部表面下具有纸垫。本实用新型的管桩替打装置具有打桩过程中彻底避免管桩损害的优点。

Description

管桩替打装置
技术领域
本实用新型属于建筑构件技术领域,涉及打桩时配合混凝土管桩使用的替打装置。
背景技术
打桩时,为了避免重锤的力直接作用在管桩上对管桩造成损害,需要在管桩顶部放置一个管桩替打装置,现有的管桩替打装置主要由钢质的主体和位于主体底部边缘的钢质的环板构成。但是,在实际使用中发现,有了该管桩替打装置,大大减小了锤力对管桩的冲击,对管桩具有一定的保护作用,但是桩顶还是会出现一些损害。
实用新型内容
为此,本实用新型所要解决的技术问题是提供一种在打桩过程中能彻底避免管桩损害的管桩替打装置,以克服现有技术存在的不足。
为解决上述技术问题,本实用新型采用如下的技术方案:
一种管桩替打装置,包括主体和位于主体底部边缘的环板构成,其特征在于:所述主体底部表面下具有纸垫。
所述主体的厚度为100mm,纸垫的厚度为23mm。
采用上述技术方案,由于纸质的衬垫具有恰当的软硬度,这样在打桩过程中,纸垫能够很好地吸收重锤的冲击力,通过主体和纸垫的两重保护,很好地保证了管桩在打桩过程中不致损害。
因此,本实用新型具有打桩过程中彻底避免管桩损害的优点。
附图说明
下面结合附图和具体实施方式对本实用新型进行详细说明:
图1为本实用新型的结构示意图;
图中:
100-主体,101-底部表面,200-环板,300-纸垫,400-管桩。
具体实施方式
如图1所示,本实用新型的管桩替打装置是在现有的管桩替打装置的基础上的改进,包括钢质的主体100和位于主体100底部边缘的钢质的环板200构成,改进之处为在主体100底部表面101下设有纸垫300。
在本实施例中,主体的厚度为100mm,纸垫的厚度为23mm。
本实用新型的管桩替打装置在使用时,将管桩替打装置放置在管桩400的顶部,由于纸质的衬垫具有恰当的软硬度,这样在打桩过程中,纸垫300能够很好地吸收重锤的冲击力,而通过主体100和纸垫300的两重保护,很好地保证了管桩在打桩过程中不致损害。
因此,本实用新型的管桩替打装置具有打桩过程中彻底避免管桩损害的优点。
但是,本技术领域中的普通技术人员应当认识到,以上的实施例仅是用来说明本实用新型,而并非用作为对本实用新型的限定,只要在本实用新型的实质精神范围内,对以上所述实施例的变化、变型都将落在本实用新型的权利要求书范围内。

Claims (2)

1.一种管桩替打装置,包括主体和位于主体底部边缘的环板构成,其特征在于:所述主体底部表面下具有纸垫。
2.根据权利要求1所述的管桩替打装置,其特征在于:所述主体的厚度为100mm,纸垫的厚度为23mm。
CN2011203785439U 2011-09-28 2011-09-28 管桩替打装置 Expired - Fee Related CN202298621U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203785439U CN202298621U (zh) 2011-09-28 2011-09-28 管桩替打装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203785439U CN202298621U (zh) 2011-09-28 2011-09-28 管桩替打装置

Publications (1)

Publication Number Publication Date
CN202298621U true CN202298621U (zh) 2012-07-04

Family

ID=46367550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203785439U Expired - Fee Related CN202298621U (zh) 2011-09-28 2011-09-28 管桩替打装置

Country Status (1)

Country Link
CN (1) CN202298621U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112900438A (zh) * 2021-01-21 2021-06-04 长沙学院 一种提高管桩抗击打能力的夹具及使用方法
CN116289943A (zh) * 2023-05-10 2023-06-23 西南石油大学 一种海上钻井平台隔水导管的打桩帽结构及其打桩方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112900438A (zh) * 2021-01-21 2021-06-04 长沙学院 一种提高管桩抗击打能力的夹具及使用方法
CN112900438B (zh) * 2021-01-21 2022-04-08 长沙学院 一种提高管桩抗击打能力的夹具及使用方法
CN116289943A (zh) * 2023-05-10 2023-06-23 西南石油大学 一种海上钻井平台隔水导管的打桩帽结构及其打桩方法

Similar Documents

Publication Publication Date Title
CN207608812U (zh) 一种板式橡胶支座防脱空装置
CN204491884U (zh) 连梁耗能装置
CN202298621U (zh) 管桩替打装置
CN202989924U (zh) 混凝土管桩专用施工桩帽
CN203625846U (zh) 一种水上浮式作业平台固桩装置
CN203613541U (zh) 一种基于浅海吹填区竖桩沉桩的替打装置
CN102877479A (zh) 一种抗拔桩基础结构
CN203960840U (zh) 一种建筑用夯实机
CN202865847U (zh) 管桩用替打工装
CN201746867U (zh) 一种取土器
CN201952777U (zh) 高桩码头钢抱箍支撑结构
CN205576914U (zh) 一种新型打桩机
CN204627665U (zh) 矿用进口风泵防堵塞高强度龙头
CN203283960U (zh) 一种纸管
CN201660881U (zh) 一种用于倾斜桩纠偏顶推的装置
CN202064370U (zh) 一种拼接式多肋板式基础结构
CN202767093U (zh) 一种抗拔桩基础结构
CN201099856Y (zh) 一种建筑桩体结构
CN202298614U (zh) 一种加强型桩尖
CN203007950U (zh) 桩芯掏土装置
CN203755309U (zh) 一种打桩装置
CN202294051U (zh) 农用机械的铁轮结构
CN203846493U (zh) 一种破岩桩头
CN204215864U (zh) 330kV变压器的铁心侧梁装置
CN204491614U (zh) 一种防管桩偏移送桩器

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 201402, Shanghai, Fengxian District Pu Wei Road No. 50

Patentee after: SHANGHAI ZHEZHONG GROUP CO., LTD.

Address before: 201402, Shanghai, Fengxian District Pu Wei Road No. 50

Patentee before: Shanghai Zheshi Building Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20160928

CF01 Termination of patent right due to non-payment of annual fee