CN202281303U - Hot water circulating system - Google Patents

Hot water circulating system Download PDF

Info

Publication number
CN202281303U
CN202281303U CN2011203171973U CN201120317197U CN202281303U CN 202281303 U CN202281303 U CN 202281303U CN 2011203171973 U CN2011203171973 U CN 2011203171973U CN 201120317197 U CN201120317197 U CN 201120317197U CN 202281303 U CN202281303 U CN 202281303U
Authority
CN
China
Prior art keywords
water supply
hot water
water
main pipe
supply installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011203171973U
Other languages
Chinese (zh)
Inventor
陆京
石任猛
谢莫愁
秦华云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu He Hai new forms of energy limited company
Original Assignee
JIANGSU HEHAI NEW ENERGY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU HEHAI NEW ENERGY CO Ltd filed Critical JIANGSU HEHAI NEW ENERGY CO Ltd
Priority to CN2011203171973U priority Critical patent/CN202281303U/en
Application granted granted Critical
Publication of CN202281303U publication Critical patent/CN202281303U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Domestic Hot-Water Supply Systems And Details Of Heating Systems (AREA)

Abstract

The utility model relates to a hot water circulating system. Each of a first hot water supply device, a second hot water supply device and a third hot water supply device comprises a water supply main pipe, a circulating pump arranged at the starting end of the water supply main pipe and a plurality of groups of circulating pipelines connected onto the water supply main pipe. The two ends of each circulating pipeline are respectively communicated with the water supply main pipe. The tail ends of the water supply main pipes of the first, the second and the third hot water supply devices are connected onto a same return main pipe. The tail end of each water supply main pipe is provided with a return water controller. By means of arranging the return water controller at the tail end of each water supply main pipe, the temperature and water flow of return water can be detected in real time. The work of a control valve is controlled by the detected result to guarantee the hot water supply quality. Each water supply device can return water in order. One return main pipe is shared, so that the pipe material is saved by 40%. Meanwhile, as the pipe material is saved, the flowing path of hot water is simplified and the heat loss of the pipelines is reduced by 30% compared with the heat loss in a traditional hot water supply system.

Description

Hot water cyclesystem
Technical field
The utility model relates to a kind of hot water cyclesystem that is used for skyscraper.
Background technology
Hot water cyclesystem: a kind of device that hot water and heat energy can stably be provided.It is power with the hot water circulating pump, adopts the constantly method of circulation of hot water, is transported to " use side " to heat (or hot water) from " collection terminal ".For heat (hot water) supply of skyscraper, the feeding mechanism that need be divided into Gao Qu, Zhong Qu, low district etc. satisfies the supply requirement; Existing Gao Qu, Zhong Qu, the low district that is directed against in the hot water cyclesystem of skyscraper is provided with an independently circulatory system (like Fig. 1) respectively; It is equipped with an independent backwater channel; Waste tubing increases investment, simultaneously because pipeline makes the heat of its hot water run off too much.
Summary of the invention
To above-mentioned technical problem, the utility model provides a kind of hot water cyclesystem, and it adopts same return main, has saved tubing, and increase backwater controller simultaneously and detect the hot water temperature in the circulatory system, and the work of control whole circulation system.
The technical scheme that realizes the utility model is following:
Hot water cyclesystem; Comprise the first hot water water supply installation, the second hot water water supply installation, the 3rd hot water water supply installation; The said first hot water water supply installation, the second hot water water supply installation, the 3rd hot water water supply installation include a water supply and are responsible for, are arranged on to supply water and are responsible for the circulating pump at top; And be connected many groups circulating line of supply water being responsible for; The two ends of each circulating line are communicated with respectively to supply water to be responsible for, and the end of being responsible for that supplies water in the said first hot water water supply installation, the second hot water water supply installation, the 3rd hot water water supply installation is connected on the same return main, and its each end of being responsible for that supplies water is provided with backwater controller.
Said backwater controller comprises the terminal return water temperature of the water supply person in charge, the temperature acquisition analyzer that flow carries out data acquisition, analysis, and is arranged on the control valve that the person in charge that supplies water is upward controlled by the temperature acquisition analyzer.Control valve is controlled backwater according to the data that the temperature acquisition analyzer is provided automatically.
The end of above-mentioned each circulating line is provided with an injector, thereby can make the hot water process from circulating line that supplies water in being responsible for, for use side provides heat (hot water).
Adopted such scheme, through the end of being responsible for that supplies water at each backwater controller has been set, it can detect return water temperature, flow in real time, and controls the duty of control valve by the result who detects, thus the quality of the hot water of can guaranteeing supply; Also can realize the orderly backwater of each water supply installation; A public return main has been saved tubing, and its confession, return pipe can be saved material 40%; Simultaneously, reduced the heat loss of pipeline, can reduce 30% than the heat loss of traditional hot water supply system owing to saved the flow path that tubing has also just been simplified hot water.
Description of drawings
Fig. 1 is traditional heating system sketch map;
Fig. 2 is the sketch map of the utility model;
Fig. 3 is a backwater controller sketch map in the utility model;
Among the figure, 1 is the first hot water water supply installation, and 2 is the second hot water water supply installation, and 3 is the 3rd hot water water supply installation; 4 are the person in charge that supplies water, and 5 is circulating pump, and 6 is circulating line, and 7 is return main; 8 is backwater controller, and 9 is the temperature acquisition analyzer, and 10 is control valve, and 11 is injector.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment the utility model is further specified.
Referring to Fig. 2, shown in 3; Hot water cyclesystem; Comprise use district's second hot water water supply installation 2, the low district of skyscraper the 3rd hot water water supply installation 3 in the first hot water water supply installation 1 in the high district of skyscraper, skyscraper; The first hot water water supply installation 1, the second hot water water supply installation 2, the 3rd hot water water supply installation 3 include one and supply water and be responsible for 4, be arranged on to supply water and be responsible for the circulating pump 5 at top; And be connected many groups circulating line 6 of supply water being responsible on 4; The two ends of each circulating line are communicated with respectively to supply water to be responsible for, and the end of being responsible for that supplies water in the first hot water water supply installation, the second hot water water supply installation, the 3rd hot water water supply installation is connected on the same return main 7, and its each end of being responsible for that supplies water is provided with backwater controller 8.Backwater controller 8 comprises the return water temperature of being responsible for end, the temperature acquisition analyzer 9 that flow detects of supplying water; And be arranged on the control valve of supply water to be responsible for going up by the control of temperature acquisition analyzer 10, be provided with an injector 11 at the end of each circulating line.

Claims (3)

1. hot water cyclesystem; It is characterized in that: it comprises the first hot water water supply installation, the second hot water water supply installation, the 3rd hot water water supply installation; The said first hot water water supply installation, the second hot water water supply installation, the 3rd hot water water supply installation include a water supply and are responsible for, are arranged on to supply water and are responsible for the circulating pump at top; And be connected many groups circulating line of supply water being responsible for; The two ends of each circulating line are communicated with respectively to supply water to be responsible for, and the end of being responsible for that supplies water in the said first hot water water supply installation, the second hot water water supply installation, the 3rd hot water water supply installation is connected on the same return main, and its each end of being responsible for that supplies water is provided with backwater controller.
2. hot water cyclesystem according to claim 1; It is characterized in that: said backwater controller comprises the terminal return water temperature of the water supply person in charge, the temperature acquisition analyzer that flow detects, and is arranged on the control valve that the person in charge that supplies water is upward controlled by the temperature acquisition analyzer.
3. hot water cyclesystem according to claim 1 is characterized in that: the end of above-mentioned each circulating line is provided with an injector.
CN2011203171973U 2011-08-29 2011-08-29 Hot water circulating system Expired - Lifetime CN202281303U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203171973U CN202281303U (en) 2011-08-29 2011-08-29 Hot water circulating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203171973U CN202281303U (en) 2011-08-29 2011-08-29 Hot water circulating system

Publications (1)

Publication Number Publication Date
CN202281303U true CN202281303U (en) 2012-06-20

Family

ID=46227470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203171973U Expired - Lifetime CN202281303U (en) 2011-08-29 2011-08-29 Hot water circulating system

Country Status (1)

Country Link
CN (1) CN202281303U (en)

Similar Documents

Publication Publication Date Title
CN203073852U (en) Air energy and solar energy integrated control heating furniture
CN104456685B (en) A kind of multi-heat source single tube UTILIZATION OF VESIDUAL HEAT IN heating system
CN202485208U (en) Energy-saving double-water-tank constant-temperature continuous water supply system
CN103994487B (en) The distributed mixing heating system of the long defeated single tube of one kind
CN202281303U (en) Hot water circulating system
CN101672497A (en) Dual-energy solar energy central warm water supplying device and electrical control method thereof
CN203908027U (en) Water heater water saving system
CN203964369U (en) The different poly-state heat utilization system of solar energy with throttle control device
CN201163105Y (en) Constant-temperature fast water heater of external circulating water pump
CN204006667U (en) The different poly-state heat utilization system of solar energy that pipeline opening degree is adjustable
CN203605321U (en) Constant-temperature water supply device and heating equipment
CN102589032A (en) Water mixing machine set used for heat supply
CN203385079U (en) Waste heat reclaiming system for industrial cooling water
CN202274637U (en) Automatic water replenishing device of ground source heat pump
CN206875541U (en) A kind of energy-saving floor radiant heating system
CN202153317U (en) Constant pressure water supply waterpower module
CN201779748U (en) Energy-saving heating manifold
CN105484128A (en) Summer road cooling protection and heat recovery system
CN204460789U (en) Intelligent temperature-difference backwater energy-saving control system
CN103673072B (en) Constant-temperature water supply device, method and heating equipment
CN204640659U (en) For the hydrologic cycle cooling system of groove cooling of foaming
CN203704191U (en) Geothermal energy central air-conditioning provided with Venturi thermal device
CN204254711U (en) The distributed mixing heating system of a kind of long defeated single tube
CN204254710U (en) A kind of multi-heat source single tube UTILIZATION OF VESIDUAL HEAT IN heating system
CN203980396U (en) Thermal source flow balance controller

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 213022 Qinling Mountains Road, Xinbei District, Jiangsu, China, No. 5, No.

Patentee after: Jiangsu He Hai new forms of energy limited company

Address before: 213022, No. 1-1, Xinbei District, Jiangsu, Hengshan Road, Changzhou

Patentee before: Jiangsu Hehai New Energy Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20120620

CX01 Expiry of patent term