CN202267583U - Simple air tightness performance test device for air conditioning units of high speed trains - Google Patents

Simple air tightness performance test device for air conditioning units of high speed trains Download PDF

Info

Publication number
CN202267583U
CN202267583U CN2011203079905U CN201120307990U CN202267583U CN 202267583 U CN202267583 U CN 202267583U CN 2011203079905 U CN2011203079905 U CN 2011203079905U CN 201120307990 U CN201120307990 U CN 201120307990U CN 202267583 U CN202267583 U CN 202267583U
Authority
CN
China
Prior art keywords
air
pressure
conditioning unit
air conditioning
test device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203079905U
Other languages
Chinese (zh)
Inventor
姚俊豪
张荣标
送丰季
余敏
任钏瑞
马龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI FAIVELEY TRANSPORT VEHICLE EQUIPMENT CO Ltd
Original Assignee
SHANGHAI FAIVELEY TRANSPORT VEHICLE EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI FAIVELEY TRANSPORT VEHICLE EQUIPMENT CO Ltd filed Critical SHANGHAI FAIVELEY TRANSPORT VEHICLE EQUIPMENT CO Ltd
Priority to CN2011203079905U priority Critical patent/CN202267583U/en
Application granted granted Critical
Publication of CN202267583U publication Critical patent/CN202267583U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The utility model relates to a simple air tightness performance test device for air conditioning units of high speed trains, which comprises filters, floater flow meters, manual valves, high pressure air pumps, a frequency converter, a pressure meter and a timer. Two high pressure air pumps are connected in parallel, inlets of the high pressure air pumps are respectively connected with a negative pressure connector through three manual valves, three floater flow meters and three filters, and outlets of the high pressure air pumps are accessed into a tested air conditioning unit through a positive pressure connector. A constant air quantity test of the simple air tightness performance test device is that the tested air conditioning unit is pressurized or vacuumized through the test device, output power of the frequency converter is adjusted to enable pressure to be maintained in a designated value and enable the pressure to be in a stable state within appointed time, and leakage quantity under the pressure can be read through the flow meters. A pressure maintaining test is that the tested air conditioning unit is pressurized or vacuumized through the test device; when pressure in the tested air conditioning unit reaches the designated value, the test device is closed, a pipeline valve is pressurized, and simultaneously users can start timing to measure the time consumed by the air conditioning unit when the pressure decreases from the designated value or increases to the designated value.

Description

Bullet train air-conditioning unit impermeability performance Simplified Test Equipment
Technical field
The utility model relates to a kind of bullet train air-conditioning unit air tightness test device, especially a kind of proving installation with the bullet train air-conditioning unit impermeability performance parameter of deciding wind quantity test and pressurize test.
Background technology
For guaranteeing product quality, ensure the safety of producing, living, the product with closed container character all will carry out sealing property and detect before dispatching from the factory.Air-conditioning system is a totally enclosed circulation system, and is very high to bubble-tight requirement, after leakage rate surpasses certain proportion, not only causes system normally to move, and accident such as can cause that unit burns.Impermeability is the important parameter that guarantees bullet train air-conditioning unit operate as normal, is to improve air-conditioning unit refrigeration and the key that guarantees the air-conditioning unit safety operation.
At present; That weighs train air-conditioning unit impermeability performance decides Specifeca tion speeifications such as air quantity and hold period; Need obtain through experimental test, and existing air-conditioning unit air tightness test device, major part all is to design to the common air-conditioning unit; For bullet train air-conditioning unit, have problems such as complicated operation, precision are not high, inefficiency.
Summary of the invention
The utility model is if supply a kind of bullet train air-conditioning unit impermeability performance Simplified Test Equipment; Make the test of bullet train air-conditioning unit impermeability performance parameter more easy, accurately and efficient, this apparatus structure is simple, easy to operate, test result accurately and reliably.
For realizing above-mentioned purpose; The technical scheme of the utility model is: a kind of bullet train air-conditioning unit impermeability performance Simplified Test Equipment; Comprise filtrator, suspended body flowmeter, manually-operated gate, high pressure air pump, frequency converter, tensimeter and timer; Be characterized in: two high-pressure blast parallels connection of pumps connect, and the import of high pressure air pump is connected with the negative pressure interface with three filtrators through three manually-operated gates, three suspended body flowmeters respectively; Outlet inserts tested air-conditioning unit through positive pressure interface.
During the malleation test, the negative pressure interface is two high-pressure blast pump intakes, and frequency converter and tensimeter are connected the corresponding positive pressure interface of malleation test.
During the negative pressure test, positive pressure interface is two high-pressure blast pump intakes, and frequency converter and tensimeter are connected the corresponding negative pressure interface of negative pressure test.
The sub-flow of three table flotations is counted the suspended body flowmeter of different ranges.
The beneficial effect of the utility model is:
(1) filtrator plays floating dust and the foreign material in the filtered air, guarantees to get into the air quality of air-conditioning unit and the normal operation of blower fan.
(2) suspended body flowmeter plays to measure and makes the air quantity that sucks when reaching specified pressure in the air-conditioning unit; According to the requirement of test, select the suspended body flowmeter of different ranges, to improve data veracity.
(3) manually-operated gate plays the effect that realizes selecting flowmeter.According to the flowmeter of selecting, open corresponding valve, and close the valve that is connected with use traffic meter not, with the accuracy of raising DATA REASONING.
(4) the high pressure air pump plays to blasting air quantity in the air-conditioning unit, makes the pressure in the air-conditioning unit reach designated value, the impermeability of testing air conditioner unit under specified pressure.Adopt two high-pressure blast parallels connection of pumps, make air quantity can satisfy the requirement that reaches specified pressure, and frequency converter is being changed in the small range relatively, thereby make adjusting rapidly, accurately.
(5) the ABB frequency converter plays the rotating speed of regulating the high pressure air pump, thereby changes the air quantity that gets into the air-conditioning unit, makes the pressure in the air-conditioning unit maintain a certain designated value.
(6) tensimeter plays the pressure of measuring in the tested unit, makes it reach designated value.
(7) timer plays carrying out pressurize when test pressure and rises or drop to the time that designated value needs from designated value.
Therefore, the utility model is simple in structure, easy to operate, controllability is good, reliable test result is accurate.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is further described.
As shown in Figure 1; The bullet train air-conditioning unit impermeability performance test easy device of the utility model; Major equipment comprises, the suspended body flowmeter of three filtrators 1, three different ranges 2, three manually-operated gates 3, two high pressure air pumps 4, ABB frequency converter 5, a tensimeter 6 and a timer 7.This device mainly comprises two functions: decide wind quantity test and pressurize test.
During the malleation test (Fig. 1); Negative pressure interface-P is the suction inlet of high pressure air pump 4, via floating dust and the foreign material in filtrator 1 filtered air, and the suspended body flowmeter 2 of flowing through; Get into high pressure air pump 4 through valve 3; Insert tested air-conditioning unit through high pressure air pump pressurization back from positive pressure interface+P, select correct pressure-measuring-point+C1, frequency converter 5 is connected the corresponding positive pressure interface+P of malleation test with tensimeter 6.According to the rotating speed of frequency converter 5 adjusting high pressure air pumps 4, observe the force value that tensimeter 6 shows, make the pressure in the tested unit reach designated value.Behind the system stability, the reading of flowmeter 2 is promptly decided air quantity under the force value for this reason.Close high pressure air pump 4 and with flowmeter 2 with respect to valve 3, open timer 7 simultaneously, by the time pressure is reduced to designated value, the time that timer 7 records is hold period.
When carrying out the negative pressure test, positive pressure interface+P is the suction inlet of high pressure air pump 4, and frequency converter 5 is connected the corresponding negative pressure interface-P of negative pressure test with tensimeter 6, and other are identical with the malleation test.Pressure-measuring-point-C2 and+C1 are arranged in the import and the outlet of high pressure air pump 4, ignore the resistance of pipeline, and the pressure that the measuring point place records is the pressure in the tested air-conditioning unit.

Claims (4)

1. bullet train air-conditioning unit impermeability performance Simplified Test Equipment; Comprise filtrator (1), suspended body flowmeter (2), manually-operated gate (3), high pressure air pump (4), frequency converter (5), tensimeter (6) and timer (7); It is characterized in that: two said high pressure air pumps (4) are connected in parallel, and the import of high pressure air pump (4) (P) is connected with the negative pressure interface with three filtrators (1) through three manually-operated gates (3), three suspended body flowmeters (2) respectively; Outlet through positive pressure interface (+P) insert tested air-conditioning unit.
2. bullet train air-conditioning unit impermeability performance Simplified Test Equipment according to claim 1; It is characterized in that: during the malleation test; Said negative pressure interface (P) be the suction inlet of two high pressure air pumps (4), frequency converter (5) and tensimeter (6) be connected the corresponding positive pressure interface of malleation test (+P).
3. bullet train air-conditioning unit impermeability performance Simplified Test Equipment according to claim 1; It is characterized in that: during the negative pressure test; Positive pressure interface (+P) be the suction inlet of two high pressure air pumps (4), frequency converter (5) and tensimeter (6) are connected the corresponding negative pressure interface of negative pressure test (P).
4. bullet train air-conditioning unit impermeability performance Simplified Test Equipment according to claim 1, it is characterized in that: three said suspended body flowmeters (2) are the suspended body flowmeter of different ranges.
CN2011203079905U 2011-08-23 2011-08-23 Simple air tightness performance test device for air conditioning units of high speed trains Expired - Fee Related CN202267583U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203079905U CN202267583U (en) 2011-08-23 2011-08-23 Simple air tightness performance test device for air conditioning units of high speed trains

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203079905U CN202267583U (en) 2011-08-23 2011-08-23 Simple air tightness performance test device for air conditioning units of high speed trains

Publications (1)

Publication Number Publication Date
CN202267583U true CN202267583U (en) 2012-06-06

Family

ID=46158374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203079905U Expired - Fee Related CN202267583U (en) 2011-08-23 2011-08-23 Simple air tightness performance test device for air conditioning units of high speed trains

Country Status (1)

Country Link
CN (1) CN202267583U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103674587A (en) * 2012-09-13 2014-03-26 南车青岛四方机车车辆股份有限公司 Test system and method for detection of air conditioning system
CN109307575A (en) * 2018-12-03 2019-02-05 金鑫美莱克空调系统(无锡)有限公司 Rail traffic air-conditioning system airtight detecting apparatus and method
CN111330371A (en) * 2020-04-27 2020-06-26 湖北华强科技有限责任公司 Replaceable filter element filtering absorber with self-checking function and replacement and self-checking method
CN112903209A (en) * 2021-02-08 2021-06-04 陕西长岭特种设备股份有限公司 Air tightness detection method for shelter air conditioning equipment
CN114323453A (en) * 2021-12-29 2022-04-12 武汉泰格尔科技发展有限公司 Negative pressure test device in cabin and operation method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103674587A (en) * 2012-09-13 2014-03-26 南车青岛四方机车车辆股份有限公司 Test system and method for detection of air conditioning system
CN103674587B (en) * 2012-09-13 2016-04-20 中车青岛四方机车车辆股份有限公司 Air-conditioning system detection experiment system and test method
CN109307575A (en) * 2018-12-03 2019-02-05 金鑫美莱克空调系统(无锡)有限公司 Rail traffic air-conditioning system airtight detecting apparatus and method
CN111330371A (en) * 2020-04-27 2020-06-26 湖北华强科技有限责任公司 Replaceable filter element filtering absorber with self-checking function and replacement and self-checking method
CN112903209A (en) * 2021-02-08 2021-06-04 陕西长岭特种设备股份有限公司 Air tightness detection method for shelter air conditioning equipment
CN114323453A (en) * 2021-12-29 2022-04-12 武汉泰格尔科技发展有限公司 Negative pressure test device in cabin and operation method thereof

Similar Documents

Publication Publication Date Title
CN202267583U (en) Simple air tightness performance test device for air conditioning units of high speed trains
CN201867290U (en) Air tightness testing device for automobile air-conditioning box
CN101672729B (en) High-altitude and low-pressure characteristic simulation test station of air compressor in internal-combustion engine
CN206192621U (en) Experimental high -efficient jumbo size of intake duct is drawn and is penetrated piping installation
GB2494835A (en) A method and apparatus for composition based compressor control and performance monitoring
CN204115829U (en) A kind of combine detection system
CN104931266B (en) A kind of airplane engine fuel oil analog control system and adjusting method
CN106885694A (en) A kind of air valve performance testing device and air valve performance test methods
CN103953534B (en) A kind of test device of lubricating pump of automobile
CN206695983U (en) A kind of air valve performance testing device
CN110736601A (en) mixed laminar flow control wind tunnel test system
CN105222230A (en) Inter-row air conditioner, pressure regulating method of inter-row air conditioner and inter-row air conditioning system
CN108444718B (en) Pump and the dual-purpose multiphase nature testboard of turbine and its test method
CN201507434U (en) Laboratory water purifier water purification pump testing device
CN111043105A (en) High-power hydraulic comprehensive test bed and test method thereof
CN212513237U (en) Ultrasonic flowmeter practical condition simulation device
CN109026648A (en) A kind of medium volume flow regulator pumped at class products export
CN104373337A (en) Roots blower testing system
CN208950840U (en) A kind of medium volume flow regulator pumped at class products export
CN209181885U (en) A kind of calibration equipment based on nuclear power plant's penetration piece test flow
CN209230744U (en) A kind of wide-range verifies standard set-up than water meter
CN209706876U (en) A kind of valve flow caliberating device
CN107860441B (en) Water flow sensor test board
CN209387106U (en) Gas meter, flow meter mesolow control experiment device
CN202903289U (en) Checking apparatus for flow coefficients of lemniscate flow meters

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120606

Termination date: 20180823