CN202245931U - Lifting mechanism - Google Patents

Lifting mechanism Download PDF

Info

Publication number
CN202245931U
CN202245931U CN2011203786022U CN201120378602U CN202245931U CN 202245931 U CN202245931 U CN 202245931U CN 2011203786022 U CN2011203786022 U CN 2011203786022U CN 201120378602 U CN201120378602 U CN 201120378602U CN 202245931 U CN202245931 U CN 202245931U
Authority
CN
China
Prior art keywords
bearing pin
swing arm
oil cylinder
connection pin
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011203786022U
Other languages
Chinese (zh)
Inventor
刘其宁
朱嘉梁
陈飞达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi City Amman engineering machinery Co., Ltd
Original Assignee
Wuxi City An Mai Engineering Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi City An Mai Engineering Machinery Co Ltd filed Critical Wuxi City An Mai Engineering Machinery Co Ltd
Priority to CN2011203786022U priority Critical patent/CN202245931U/en
Application granted granted Critical
Publication of CN202245931U publication Critical patent/CN202245931U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Pivots And Pivotal Connections (AREA)

Abstract

The utility model discloses a lifting mechanism, belonging to the engineering machinery field. The mechanism comprises a swing arm, a swing arm cylinder, a tower lifting cylinder, a support part, a carriage, a connection pin A, a connection pin B, a connection pin C, a connection pin D and a connection pin E, wherein the upper end of the swing arm and the upper end of the swing arm cylinder are connected with one end of the carriage through the connection pin A, the upper end of the tower lifting cylinder is connected with the other end of the carriage through the connection pin B, the lower end of the swing arm and the lower end of the swing arm cylinder are connected with one end of the support part through the connection pin C and the connection pin D respectively, and the lower end of the tower lifting cylinder is connected with the other end of the support part through a connection pin E. The lifting mechanism has compact structure and high adaptability, is reliable, is convenient in operation and low in manufacturing cost and maintenance cost and can adapt to the harsh working conditions of a drill.

Description

A kind of lifting mechanism
Technical field
The utility model relates to a kind of lifting mechanism, belongs to engineering machinery field.
Background technology
In the more abominable engineering field of operating mode, lifting mechanism part and structure are principle of design with simple, practicality all, require to install and convenient disassembly, and for ease of maintenaince, can also be fit to open-air area and use.The most complex structure of the structural lifting mechanism of conventional machinery, the defective that existence is installed and maintenance is inconvenient be not so be suitable for the more abominable engineering field of construction machinery and equipment operating mode.
The utility model content
The purpose of the utility model just is to overcome existing lifting mechanism complex structure, installs and keep in repair the defective of inconvenience, and a kind of novel lifting mechanism is provided.
In order to solve the problems of the technologies described above, the utility model provides following technical scheme:
A kind of lifting mechanism; Comprise swing arm, swing arm oil cylinder, a tower oil cylinder, two bearings, frame, balladeur train, connection bearing pin A, connection bearing pin B, connection bearing pin C, connection bearing pin D and be connected bearing pin E; A bearing is welded at said frame two ends respectively; Said swing arm upper end connects said balladeur train one end with swing arm oil cylinder upper end through being connected bearing pin A; Said tower oil cylinder upper end connects the said balladeur train other end through connecting bearing pin B, and through being connected bearing pin C and being connected bearing pin D and connecting a said bearing, said tower oil cylinder lower end connects said another bearing through connection bearing pin E respectively for said swing arm lower end and swing arm oil cylinder lower end.
As preferably, said connection bearing pin A, to connect bearing pin C one end be that inside and outside double nuts is fixed, and splines on the said inner nut and locking key is housed, and said outer nut is furnished with floor clip;
Said connection bearing pin A, connect the bearing pin sheathed card key of the C other end and collar and be fixed on the bearing through collar with bolt.
As preferably, said connection bearing pin B be connected bearing pin E one end and have keyway, key connects fixing;
Said connection bearing pin B be connected the bearing pin E other end back-up ring be housed, and use bolt.
The utility model makes it compared with prior art owing to adopted above technical scheme, has the following advantages and characteristics:
1, compact conformation, reliable.
2, simple in structure, control comfort.
3, manufacturing and maintenance cost are low.
4, comformability is strong, can adapt to the rig bad working environment.
Description of drawings
Accompanying drawing is used to provide the further understanding to the utility model, and constitutes the part of specification sheets, is used to explain the utility model with the embodiment of the utility model, does not constitute the restriction to the utility model.In the accompanying drawings:
Fig. 1 is the main TV structure scheme drawing of the utility model;
Fig. 2 is the B-B structural representation of the utility model;
Fig. 3 is the A-A structural representation of the utility model;
Fig. 4 is the C-C structural representation of the utility model;
Fig. 5 is an I place detail view in the utility model B-B view;
Fig. 6 is an II place detail view in the utility model B-B view;
Fig. 7 is an III place detail view in the utility model B-B view;
Fig. 8 is an IV place detail view in the utility model B-B view;
Fig. 9 is that the utility model P is to structural representation;
Figure 10 is that the utility model P is to V place detail view.
The specific embodiment
Describe below in conjunction with the preferred embodiment of accompanying drawing, should be appreciated that preferred embodiment described herein only is used for explanation and explains the utility model, and be not used in qualification the utility model the utility model.
This is novel to be a kind of mechanism of simple and reliable, lifting that can Rapid Realization, and the swing that lean on swing arm, swing arm oil cylinder specifically, plays the tower oil cylinder drives balladeur train and rises, falls, and finally realizes the lifting function of rig.
The core of this mechanism has reached the tower cylinder component by swing arm, swing arm oil cylinder and has formed.
Like Fig. 2, Fig. 3 and shown in Figure 4; The Kong Weiyu swing arm 2 of swing arm oil cylinder 31 upper ends is relative; Penetrate and couple together both through connecting bearing pin A1; The inner outer two groups of nuts in the right part of connection bearing pin A are screwed and are fixed, and inner nut 14 upper ends have the flat key groove and place flat key 17, and flat key has locking effect; Outer nut 16 is screwed and is mixed floor clip 15 again, and double like this protection is extraordinary fixes the end.Put card key II18 between the left part of connection bearing pin A and swing arm, be threaded the collar II19 in hole on the card key II outer cover, leaned on bolt and bullet pad to fix axle head again.
Like Fig. 5, shown in 6, connect bearing pin C10 cover Upper shaft sleeve I8 and penetrate bearing 3, swing arm 2 successively, right-hand member leans on two groups of nuts to fix, and inner nut 6 splines and flat key 7 is housed, and flat key has locking effect; Outer nut 4 is screwed and is mixed floor clip 5 again.Connect bearing pin C left end and put card key I11, have the collar I9 of screw on the card key outer cover, lean on bolt and bullet pad to fix again.Two bearings on the bearing pin of bottom are joined by size and to be welded in above the frame assembling the back.
Like Fig. 7, shown in 8, the connection bearing pin D28 that is with axle sleeve II29 is passed in swing arm oil cylinder bottom, and matching with bearing is connected, and the end is tightened with bolt and bullet pad and fixed.Bearing is joined by size and is welded on the frame.
Shown in figure 10, be connected bearing 35 with tower oil cylinder 27 upper end by connecting bearing pin D33, the end of bearing pin leans on back-up ring 32 to carry out axial restraint; The other end is installed flat key at axle head, in case the shotpin diameter of axle is to rotation.
As shown in Figure 9, be connected bearing 20 with tower oil cylinder 27 bottom by connecting bearing pin C21, an end that connects bearing pin C is with elastic collar 23, gland 24 and packing ring 25, bolt; Connect the bearing pin C other end and be equiped with flat key, in case the shotpin diameter of axle is to rotation.
Lifting process: when swing arm oil cylinder piston bar was boosted, swing arm had reached the tower oil cylinder and has and then carried out the rotation of cw circumference, and balladeur train is whole toward rising; When the downward indentation of piston rod of swing arm oil cylinder, swing arm has reached the tower oil cylinder and then to be carried out the conter clockwise circumference and rotates, and balladeur train is whole to descend.
Rotation process: when a tower oil cylinder piston bar was boosted, balladeur train will rotate counterclockwise, and rose; When piston rod down during indentation, balladeur train will clockwise rotate and descend.
What should explain at last is: the above is merely the embodiment of explanation the utility model; Be not limited to the utility model; For a person skilled in the art; All within the spirit and principle of the utility model, any modification of being done, be equal to replacement, improvement etc., all should be included within the protection domain of the utility model.

Claims (3)

1. lifting mechanism; Comprise swing arm, swing arm oil cylinder, a tower oil cylinder, two bearings, frame, balladeur train, connection bearing pin A, connection bearing pin B, connection bearing pin C, connection bearing pin D and be connected bearing pin E; A bearing is welded at said frame two ends respectively; It is characterized in that: said swing arm upper end connects said balladeur train one end with swing arm oil cylinder upper end through being connected bearing pin A; Said tower oil cylinder upper end connects the said balladeur train other end through connecting bearing pin B, and through being connected bearing pin C and being connected bearing pin D and connecting a said bearing, said tower oil cylinder lower end connects said another bearing through connection bearing pin E respectively for said swing arm lower end and swing arm oil cylinder lower end.
2. a kind of lifting mechanism according to claim 1 is characterized in that: said connection bearing pin A, to connect bearing pin C one end be that inside and outside double nuts is fixed, and splines on the said inner nut and locking key is housed, and said outer nut is furnished with floor clip;
Said connection bearing pin A, connect the bearing pin sheathed card key of the C other end and collar and be fixed on the bearing through collar with bolt.
3. a kind of lifting mechanism according to claim 1 is characterized in that: said connection bearing pin B be connected bearing pin E one end and have keyway, key connects fixing;
Said connection bearing pin B be connected the bearing pin E other end back-up ring be housed, and use bolt.
CN2011203786022U 2011-09-30 2011-09-30 Lifting mechanism Expired - Lifetime CN202245931U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203786022U CN202245931U (en) 2011-09-30 2011-09-30 Lifting mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203786022U CN202245931U (en) 2011-09-30 2011-09-30 Lifting mechanism

Publications (1)

Publication Number Publication Date
CN202245931U true CN202245931U (en) 2012-05-30

Family

ID=46107204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203786022U Expired - Lifetime CN202245931U (en) 2011-09-30 2011-09-30 Lifting mechanism

Country Status (1)

Country Link
CN (1) CN202245931U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102352726A (en) * 2011-09-30 2012-02-15 无锡市安迈工程机械有限公司 Lifting mechanism
CN107826591A (en) * 2017-11-28 2018-03-23 佛山市石井旅游制品有限公司 A kind of automatic lifting device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102352726A (en) * 2011-09-30 2012-02-15 无锡市安迈工程机械有限公司 Lifting mechanism
CN107826591A (en) * 2017-11-28 2018-03-23 佛山市石井旅游制品有限公司 A kind of automatic lifting device
CN107826591B (en) * 2017-11-28 2023-12-05 佛山市石井旅游制品有限公司 Automatic lifting device

Similar Documents

Publication Publication Date Title
CN103588139A (en) Compact type mechanical lifting mechanism for assembling line
CN201354615Y (en) Gas underbalance well drilling rotary blowout preventer
CN109826480A (en) The method of its progress structure passive vibration control of unidirectional damping hinge device and application
CN201702767U (en) Safe high-level bracket
CN202245931U (en) Lifting mechanism
CN102352726A (en) Lifting mechanism
CN104728285B (en) A kind of bearing body shaft coupling
CN210173443U (en) Thread transmission press-fitting device
CN203161821U (en) Supporting hinge device for preventing oil cylinder of dumper from generating bending moment
CN215256049U (en) Drill bit with buffering and damping structure and convenient to replace for oil drilling
CN205639466U (en) Diesel engine flywheel connection structure
CN202251899U (en) Supporting structure of bearing in speed reducer
CN215332155U (en) Vehicle door hinge
CN201326520Y (en) Driving device of wind turbine using built-in main shaft type gear box
CN111734302B (en) Vibration reduction wind distributor for reforming down-the-hole hammer of rotary drilling rig
CN208845124U (en) A kind of oil exploitation drilling rod hanger bracket
CN203912496U (en) Tractor hoisting mechanism
CN219774092U (en) Floating side door bolt assembly and ram blowout preventer
CN203691111U (en) Servo motor mounting base
CN112128244A (en) Modularized active magnetic suspension bearing device
CN217435963U (en) Bushing seat connecting device
CN204552642U (en) Small column groups of springs normally closed type strip slips chuck
CN2538929Y (en) Float jointing mechanism for central shaft and driving part of rotary door
CN202170234U (en) Lifting mechanism
CN201843131U (en) Long auger drilling machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160426

Address after: 214107 Jiangsu Province, Wuxi city Xishan District Yang Jian Zhen Yang Gao Road No. 78

Patentee after: Wuxi City Amman engineering machinery Co., Ltd

Address before: 214000 No. 18 sheep Road, Xishan District, Jiangsu, Wuxi

Patentee before: Wuxi City An Mai engineering machinery Co., Ltd

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120530