CN202245796U - Wireless-network-based large-scale bridge hoisting machinery metal structure safety monitoring device - Google Patents

Wireless-network-based large-scale bridge hoisting machinery metal structure safety monitoring device Download PDF

Info

Publication number
CN202245796U
CN202245796U CN2011203737346U CN201120373734U CN202245796U CN 202245796 U CN202245796 U CN 202245796U CN 2011203737346 U CN2011203737346 U CN 2011203737346U CN 201120373734 U CN201120373734 U CN 201120373734U CN 202245796 U CN202245796 U CN 202245796U
Authority
CN
China
Prior art keywords
strain
safety monitoring
metal structure
wireless
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203737346U
Other languages
Chinese (zh)
Inventor
杨瑞刚
渠晓刚
刘畅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan University of Science and Technology
Original Assignee
Taiyuan University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan University of Science and Technology filed Critical Taiyuan University of Science and Technology
Priority to CN2011203737346U priority Critical patent/CN202245796U/en
Application granted granted Critical
Publication of CN202245796U publication Critical patent/CN202245796U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The utility model belongs to the technical field of safety monitoring of bridge cranes, and particularly relates to a wireless-network-based large-scale bridge hoisting machinery metal structure safety monitoring device which overcomes the defects that wiring time is long and circuits influence the normal working of equipment in the conventional wired monitoring system of the bridge crane. The wireless-network-based large-scale bridge hoisting machinery metal structure safety monitoring device comprises a plurality of strain gauges on top flange plates and bottom flange plates of bridge crane girders; the stain gauges are connected with a telemetry strain indicator transmitter through an analog-to-digital conversion circuit; and a telemetry strain indicator receiver which receives signals transmitted by the telemetry strain indicator transmitter is connected with a data acquisition card which is arranged in a computer. The utility model has the advantages that the stress of the metal structure of the bridge crane can be monitored in real time, so that the deformation, breakage and other failure accidents which are caused by overlarge stress applied to the metal structure can be avoided, the construction time is short, the working of equipment is not interfered, and the whole monitoring time is shortened effectively.

Description

Large bridge crane tool metal construction safety monitoring assembly based on wireless network
Technical field
The utility model belongs to the technical field of the safety monitoring of crane in bridge type, specifically, relates to a kind of large bridge crane tool metal construction safety monitoring assembly based on wireless network.
Background technology
Crane in bridge type is a kind of crane span structure type hoisting crane that frame moves on aerial conveyor.Metal construction plays vital reusing as the main load parts of overhead traveling crane machinery.The crane in bridge type cost is than higher, and safety case in use concerning the person and property safety constantly, in case have an accident, the lighter's device damage, weight person fatal crass, economic loss is heavy, social influence is abominable.
The crane in bridge type metal construction generally is made up of two box girders and two box-shaped end carriages, and girder and end carriage are affixed, is installation and operation mechanism and pedestrian's convenience; The girder web outside all is equipped with walks on stage, and segment section cuts in the end carriage, bolt together; So that transportation, like Fig. 1, shown in Figure 2.The position that crane in bridge type stress is maximum, most probable takes place to lose efficacy is the spaning middle section of girder.
At present, the monitoring system of crane in bridge type is many based on ray mode is arranged, because monitoring channel is more, this pattern has the shortcoming of wiring time length, line influence equipment normal operation.
Summary of the invention
Wiring time is long, the shortcoming of line influence equipment normal operation for the monitoring system that ray mode is arranged that solves existing crane in bridge type is stored in for the utility model, and a kind of large bridge crane machinery metal construction safety monitoring assembly based on wireless network is provided.
The utility model adopts following technical scheme to realize:
A kind of large bridge crane machinery metal construction safety monitoring assembly based on wireless network; Comprise the top flange plate that is installed in bridging crane main beam and the some strain-gaugies on the bottom wing listrium; Strain-gauge links to each other with the telemetry strainometer emitter through analog to digital conversion circuit, and the telemetry strainometer receiver of the signal that reception telemetry strainometer emitter sends is connected with the data collecting card in being installed on computing machine.
The utility model is to manufacture on the basis in existing large bridge crane structure; Outfit is based on the metal construction safety monitoring system of wireless network; Through the wireless network monitor stress, thereby realize remote real time monitoring crane in bridge type metal construction, so that overcome the defective of prior art; For crane in bridge type safe life assessment and antifatigue design provide load parameter, for the safety and the economy of crane in bridge type metal construction provides the load data shoring of foundation.
The relative prior art of the utility model has following beneficial effect: owing to adopted the crane in bridge type metal construction monitor for stress based on wireless network; Therefore can realize the real-time stress monitoring of metal construction of crane in bridge type; Thereby the failure accidents such as excessive distortion that causes and fracture of having avoided meeting with stresses because of metal construction take place; It is short that this system has the time of building, and the advantage of interference apparatus work has not effectively shortened whole monitoring time.Simultaneously, through obtaining of loading spectrum, and analyze its regularity, the safe design method that can be crane in bridge type provides the data support.
Description of drawings
Fig. 1 is the scheme drawing of existing common box-shaped double girder bridge
Fig. 2 is the birds-eye view of Fig. 1
Fig. 3 is a crane in bridge type metal construction girder span centre cover plate stress safety monitoring scheme drawing up and down
Fig. 4 is the schematic diagram of the utility model
Among the figure: the 1-girder, the 2-end carriage, the 3-track, 4-walks on stage, 5-top flange plate, 6-bottom wing listrium, 7-strain-gauge.
The specific embodiment
Be described further in conjunction with the specific embodiment of accompanying drawing the utility model.
Large bridge crane machinery metal construction safety monitoring assembly based on wireless network; Comprise the some strain-gaugies 7 on the top flange plate 5 that is installed in bridging crane main beam 1 span centre and the bottom wing listrium 6; Strain-gauge 7 links to each other with wireless telemetering strain gage emitter through analog to digital conversion circuit, and the telemetry strainometer receiver of the signal that reception telemetry strainometer emitter sends is connected with the data collecting card in being installed on computing machine.3 of the strain-gaugies of top flange plate 5 top installation space 10mm; Middle strain-gauge is arranged at the span centre of top flange plate 5; 3 of the strain-gaugies of bottom wing listrium 6 following installation space 10mm, middle strain-gauge is arranged at the span centre of bottom wing listrium 6, and is as shown in Figure 2.
Test macro uses telemetry, and strain-gauge, analog to digital conversion circuit, transmitting set are made on the measurement module, and receiver is connected with microcomputer, accepts the signal that collects and makes subsequent treatment.The stress signal that strain-gauge measures sends signal through analog to digital conversion circuit, transmitting set, after being received by receiver, sends into computer system through data collecting card, analyzes.The total system principle of work is as shown in Figure 4.

Claims (2)

1. one kind based on the large bridge crane of wireless network machinery metal construction safety monitoring assembly; It is characterized in that comprising the top flange plate (5) that is installed in bridging crane main beam (1) span centre and the some strain-gaugies (7) on the bottom wing listrium (6); Strain-gauge (7) links to each other with wireless telemetering strain gage emitter through analog to digital conversion circuit, and the telemetry strainometer receiver of the signal that reception telemetry strainometer emitter sends is connected with the data collecting card in being installed on computing machine.
2. the large bridge crane machinery metal construction safety monitoring assembly based on wireless network according to claim 1; It is characterized in that installing above the top flange plate (5) 3 of the strain-gaugies of space 10mm; Middle strain-gauge is arranged at the span centre of top flange plate (5); 3 of the strain-gaugies of the following installation of bottom wing listrium (6) space 10mm, middle strain-gauge is arranged at the span centre of bottom wing listrium (6).
CN2011203737346U 2011-09-30 2011-09-30 Wireless-network-based large-scale bridge hoisting machinery metal structure safety monitoring device Expired - Fee Related CN202245796U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203737346U CN202245796U (en) 2011-09-30 2011-09-30 Wireless-network-based large-scale bridge hoisting machinery metal structure safety monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203737346U CN202245796U (en) 2011-09-30 2011-09-30 Wireless-network-based large-scale bridge hoisting machinery metal structure safety monitoring device

Publications (1)

Publication Number Publication Date
CN202245796U true CN202245796U (en) 2012-05-30

Family

ID=46107070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203737346U Expired - Fee Related CN202245796U (en) 2011-09-30 2011-09-30 Wireless-network-based large-scale bridge hoisting machinery metal structure safety monitoring device

Country Status (1)

Country Link
CN (1) CN202245796U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106395638A (en) * 2016-11-08 2017-02-15 芜湖市长江起重设备制造有限公司 Bridge crane for production
CN106429861A (en) * 2016-11-08 2017-02-22 芜湖市长江起重设备制造有限公司 Safety crane
CN106429911A (en) * 2016-11-08 2017-02-22 芜湖市长江起重设备制造有限公司 Crane
CN106429844A (en) * 2016-11-08 2017-02-22 芜湖市长江起重设备制造有限公司 Hybrid power crane for production
CN106429847A (en) * 2016-11-08 2017-02-22 芜湖市长江起重设备制造有限公司 Hybrid crane for workshop
CN106429866A (en) * 2016-11-08 2017-02-22 芜湖市长江起重设备制造有限公司 Crane and transverse beam thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106395638A (en) * 2016-11-08 2017-02-15 芜湖市长江起重设备制造有限公司 Bridge crane for production
CN106429861A (en) * 2016-11-08 2017-02-22 芜湖市长江起重设备制造有限公司 Safety crane
CN106429911A (en) * 2016-11-08 2017-02-22 芜湖市长江起重设备制造有限公司 Crane
CN106429844A (en) * 2016-11-08 2017-02-22 芜湖市长江起重设备制造有限公司 Hybrid power crane for production
CN106429847A (en) * 2016-11-08 2017-02-22 芜湖市长江起重设备制造有限公司 Hybrid crane for workshop
CN106429866A (en) * 2016-11-08 2017-02-22 芜湖市长江起重设备制造有限公司 Crane and transverse beam thereof

Similar Documents

Publication Publication Date Title
CN202245796U (en) Wireless-network-based large-scale bridge hoisting machinery metal structure safety monitoring device
CN202542730U (en) Rail-mounted container gantry crane with intelligent control system
CN102168403B (en) Bridge rubber support system for wireless real-time monitoring
CN204570494U (en) A kind of mobile formwork bridge fabrication machine monitoring system
WO2019085674A1 (en) Scraper conveyor chain breakage real-time monitoring system and method
CN102980782A (en) Heterogeneous sensor network and method for bridge and major infrastructure structure safety monitoring and early warning
CN101367481A (en) Quayside container crane with intelligent structure
CN103144652A (en) Remote monitoring early warning method and system of operation security of orbital curve section train
CN209505760U (en) A kind of railway freight-car operating status wireless monitor system
CN110320021A (en) Contact net anchor section on-Line Monitor Device
CN110127484B (en) Elevator bridge box operation position monitoring and early warning system and method
CN202694545U (en) Cluster-type real-time bridge safety monitoring system based on Wi-Fi network technology
CN102879134A (en) Wireless detection device for train wheel-rail contact force
CN104729869A (en) Bridge structure monitoring system based on WSNs and multi-main-body cooperation
CN102621965A (en) Clustered bridge safety real-time monitoring system based on Wi-Fi network technique
CN205634664U (en) Wireless health monitoring device of bridge gantry crane main girder structure
CN103523684A (en) Hoisting coupling device with cooperation of multiple cranes and detection method
CN211569932U (en) Tower crane safety monitoring system using 5G technology
CN203204439U (en) Wireless monitoring device for safety of tower erection
CN105863736A (en) Coal mine gas monitoring system
CN102944219A (en) Subgrade settlement monitoring system
CN210176247U (en) Elevator bridge box operation position monitoring system
CN204737634U (en) Crane monitoring system
CN204902821U (en) Dangerous early warning system of power line shaft tower based on stress detects
CN201722079U (en) Hoisting equipment for lifting and sliding steel beam units or steel trusses

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120530

Termination date: 20120930