CN202245261U - Chain conveyer after demoulding of concrete pipe pile - Google Patents

Chain conveyer after demoulding of concrete pipe pile Download PDF

Info

Publication number
CN202245261U
CN202245261U CN2011203519159U CN201120351915U CN202245261U CN 202245261 U CN202245261 U CN 202245261U CN 2011203519159 U CN2011203519159 U CN 2011203519159U CN 201120351915 U CN201120351915 U CN 201120351915U CN 202245261 U CN202245261 U CN 202245261U
Authority
CN
China
Prior art keywords
pipe pile
concrete pipe
frame
rack
demoulding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203519159U
Other languages
Chinese (zh)
Inventor
姜平平
叶喆宏
丁文智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUODING (NANTONG) PIPE PILES CO Ltd
Original Assignee
GUODING (NANTONG) PIPE PILES CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUODING (NANTONG) PIPE PILES CO Ltd filed Critical GUODING (NANTONG) PIPE PILES CO Ltd
Priority to CN2011203519159U priority Critical patent/CN202245261U/en
Application granted granted Critical
Publication of CN202245261U publication Critical patent/CN202245261U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a chain conveyer after demoulding of a concrete pipe pile, comprising a rack. A plurality of conveying rollers are installed on the rack along the extending direction of the rack. The innovation points are as follows: a turnover mechanism is installed on the rack; a turnover mechanism is installed on the rear section of the rack, and a pipe pile taking platform with a slope is arranged on one side of the rear section of the rack. The concrete pipe pile is transferred onto a pipe pile conveyer from a demoulding work section, then the conveying rollers drive the concrete pipe pile to move forward, and the turnover mechanism is used for overturning the concrete pipe pile, so that the concrete pipe pile rolls into the pipe pile taking platform, and then is hoisted onto a trolley for entering a kettle by a travelling crane. The travelling crane does not need to be used in the whole process, the normal concrete pipe pile transferring can be guaranteed, other work procedures can be conducted simultaneously when the pipe pile conveyer is utilized for moving the concrete pipe pile, further the time is saved, and the production efficiency is improved greatly.

Description

Chain-linked conveyer after a kind of concrete tubular pile demoulding
Technical field
The utility model relates to a kind of concrete tubular pile conveyer, chain-linked conveyer after particularly a kind of concrete tubular pile demoulding of enhancing productivity.
Background technology
Along with the development of concrete technology, the technology of concrete tubular pile also reaches its maturity, and except that being applied to industry, civil construction, also is widely used in each field such as bridge, harbour, railway or hydraulic engineering.
When carrying out the production of concrete tubular pile, need through feeding, stretch-draw, centrifugal, normal temperature is steam-cured, put open, operations such as the demoulding and high-pressure steaming and cultivating.After the demoulding, need concrete tubular pile be moved on the still dolly, send in the high-pressure steaming and cultivating still by advancing the still dolly.Need omnidistancely use row to lift up into mobile, the lifting of row from demoulding workshop section to advancing the still dolly, can't normally shift concrete tubular pile and produce needs to satisfy, production efficiency is restricted.
Summary of the invention
The technical matters that the utility model will solve provides chain-linked conveyer after a kind of concrete tubular pile demoulding of enhancing productivity.
For solving the problems of the technologies described above; The technical scheme of the utility model is: chain-linked conveyer after a kind of concrete tubular pile demoulding; Comprise frame, some conveying rollers that distribute along the frame bearing of trend are installed on the frame, its innovative point is: switching mechanism also is installed on the said frame; The back segment of said frame is equipped with switching mechanism; Back segment one side of said frame is provided with the adapter stake platform on band slope.
Further, said switching mechanism comprises turnover panel and is fixed on the upset cylinder on the frame, and an end of said turnover panel is connected through bearing pin with the piston rod of upset cylinder, and the turnover panel other end and frame are hinged.
The advantage of the utility model is: after concrete tubular pile moves on the pile tube conveyer from demoulding workshop section; Drive the concrete tubular pile reach by conveying roller; Stir concrete tubular pile through switching mechanism; Make concrete tubular pile roll into to take over a stake platform, hang by row again concrete tubular pile is winched on the still dolly.Need not the omnidistance row that uses and hang, guarantee that normal concrete tubular pile shifts, when utilizing pile tube conveyer transportable concrete pile tube, can carry out some other operation synchronously, further practiced thrift the time, production efficiency is greatly enhanced.
Description of drawings
Fig. 1 is a chain-linked conveyer birds-eye view after the demoulding of the utility model concrete tubular pile.
Fig. 2 is a chain-linked conveyer part sectional view after the demoulding of the utility model concrete tubular pile.
Fig. 3 is the upset scheme drawing of chain-linked conveyer after the demoulding of the utility model concrete tubular pile.
The specific embodiment
Like Fig. 1,2, shown in 3, comprise frame 1, conveying roller 2, motor 3, switching mechanism 4.
Above-mentioned frame 1 is arranged on single line chain converyer one side of demoulding workshop section, and some conveying rollers 2 that distribute along frame 1 bearing of trend are installed on it, and conveying roller 2 is connected with motor 3 through transmission device.
The switching mechanism 4 of several synchronized operations is installed on the frame 1; As shown in Figure 2; Switching mechanism 4 comprises turnover panel 41 and is fixed on the upset cylinder 42 on the frame 1, and an end of turnover panel 41 is connected through bearing pin 43 with the piston rod of upset cylinder 42, and turnover panel 41 other ends and frame 1 are hinged.
Back segment one side of frame 1 is provided with the adapter stake platform 5 on band slope, and adapter stake platform 5 flushes with the turnover panel 41 of switching mechanism near an end of frame 1.
After concrete tubular pile moves on the pile tube conveyer from demoulding workshop section; Drive the concrete tubular pile reach by conveying roller 2, as shown in Figure 3, stir concrete tubular pile 6 through switching mechanism 4; Make concrete tubular pile 6 roll into to take over a stake platform 5, can hang by row again concrete tubular pile 6 is winched on the still dolly.

Claims (2)

1. chain-linked conveyer after the concrete tubular pile demoulding comprises frame, and some conveying rollers that distribute along the frame bearing of trend are installed on the frame, and it is characterized in that: the back segment of said frame is equipped with switching mechanism; Back segment one side of said frame is provided with the adapter stake platform on band slope.
2. chain-linked conveyer after the concrete tubular pile demoulding according to claim 1; It is characterized in that: said switching mechanism comprises turnover panel and is fixed on the upset cylinder on the frame; One end of said turnover panel is connected through bearing pin with the piston rod of upset cylinder, and the turnover panel other end and frame are hinged.
CN2011203519159U 2011-09-20 2011-09-20 Chain conveyer after demoulding of concrete pipe pile Expired - Fee Related CN202245261U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203519159U CN202245261U (en) 2011-09-20 2011-09-20 Chain conveyer after demoulding of concrete pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203519159U CN202245261U (en) 2011-09-20 2011-09-20 Chain conveyer after demoulding of concrete pipe pile

Publications (1)

Publication Number Publication Date
CN202245261U true CN202245261U (en) 2012-05-30

Family

ID=46106538

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203519159U Expired - Fee Related CN202245261U (en) 2011-09-20 2011-09-20 Chain conveyer after demoulding of concrete pipe pile

Country Status (1)

Country Link
CN (1) CN202245261U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102367098A (en) * 2011-09-20 2012-03-07 国鼎(南通)管桩有限公司 Chain type conveyor for demolded concrete pipe piles

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102367098A (en) * 2011-09-20 2012-03-07 国鼎(南通)管桩有限公司 Chain type conveyor for demolded concrete pipe piles

Similar Documents

Publication Publication Date Title
CN106348181A (en) Three-dimensional direction carrying hanging tool
CN108426094A (en) A kind of push pipe poling construction equipment and its method
CN203284084U (en) Suspension type transporter at cave top
CN206511617U (en) Tray lift conveying mechanism
CN202245261U (en) Chain conveyer after demoulding of concrete pipe pile
CN102367098A (en) Chain type conveyor for demolded concrete pipe piles
CN103213803A (en) Automatic plate conveying machine
CN201323431Y (en) Sliding cable dragging frame
CN101758075B (en) Split type core locking device
CN202611727U (en) Hydraulic chain type plastering rack platform
CN203061749U (en) Plate conveying device for plate bending machine
CN202318561U (en) Automatic production line for concrete pipe piles
CN106395696A (en) Hydraulic type lifting device for ship maintenance
CN202245063U (en) Chain type mould transfer vehicle for concrete pipe piles
CN205629313U (en) Two -way ejection moves drive arrangement that base car pusher dog was rotated
CN202322203U (en) Steel pipe feeding device
CN210916199U (en) Lightweight steel bar discharging device
CN203996321U (en) Conveying line device and material dolly
CN205588543U (en) Heating power pipeline production facility
CN203679207U (en) Small continuous casting machine flexible dummy bar hydraulic turning mechanism
CN202624298U (en) Supporting pipe trolley of light partition board
CN205397255U (en) A transition conveyer constructs for tubular pile automation line
CN204324249U (en) Slab feeding device
CN204224074U (en) Picking gets a unit clamp
CN203248437U (en) Large heat exchanger core assembling and pulling device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120530

Termination date: 20180920