CN202244024U - Scaffold - Google Patents

Scaffold Download PDF

Info

Publication number
CN202244024U
CN202244024U CN201120394684XU CN201120394684U CN202244024U CN 202244024 U CN202244024 U CN 202244024U CN 201120394684X U CN201120394684X U CN 201120394684XU CN 201120394684 U CN201120394684 U CN 201120394684U CN 202244024 U CN202244024 U CN 202244024U
Authority
CN
China
Prior art keywords
angle steel
scaffold
platform
otic placode
platform support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120394684XU
Other languages
Chinese (zh)
Inventor
王文明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING BEST SHIPPING AND MARINE ENGINEERING DESIGN Co Ltd
Original Assignee
NANJING BEST SHIPPING AND MARINE ENGINEERING DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING BEST SHIPPING AND MARINE ENGINEERING DESIGN Co Ltd filed Critical NANJING BEST SHIPPING AND MARINE ENGINEERING DESIGN Co Ltd
Priority to CN201120394684XU priority Critical patent/CN202244024U/en
Application granted granted Critical
Publication of CN202244024U publication Critical patent/CN202244024U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a scaffold, which comprises lug plates. Each lug plate is provided with two diagonal slots. A platform support steel angle is connected to each lug plate, two protruding screws are arranged at one end of each platform support steel angle and disposed in the two slots respectively, an upright railing bar is connected to the other end of each platform support steel angle, and a pedal plate is fixed below the middles of the platform support steel angles. The scaffold has the advantages of simple structure, and time and labor saving.

Description

Scaffold
Technical field
The utility model relates to a kind of scaffold.
Background technology
At present, when making body section, workman's work for ease; Need in the segmentation of hull, weld scaffold, when body section need stand up, just must scaffold be disassembled; Again scaffold is welded again Deng behind the ship hull sectional turn-over, when body section will enter the sand washing room, again scaffold is dismantled again; Afterwards body section middle group, weld scaffold when closing up greatly again again, worker and manpower when again and again wasting, particularly with scaffold when hull is removed; Can be corrupted to the surface of hull, influence the total quality of hull.
Summary of the invention
The purpose of the utility model is in order to overcome above deficiency, a kind of simple in structure, time saving and energy saving scaffold to be provided.
The purpose of the utility model realizes through following technical scheme: a kind of scaffold; Comprise otic placode, be provided with two oblique grooves in the otic placode, otic placode is connected with platform and supports angle steel; One end of platform support angle steel is provided with the screw of two convexities; Two screws place two grooves respectively, and the other end of platform support angle steel is connected with the grab rail of vertical setting, and platform supports below, angle steel middle part and is fixed with pedal.
The further improvement of the utility model is: the upper and lower side of grab rail all is installed with the protection hawser.
The utility model compared with prior art has the following advantages: platform is supported between angle steel and pedal, the grab rail weld earlier; Be that platform supports between angle steel and pedal, the grab rail and all captives joint; And otic placode is on the angle steel that is welded on the hull; Otic placode and platform support between the angle steel to flexibly connecting; Be about to the screw that platform supports two convexities on the angle steel and place two grooves on the otic placode respectively, need not whole scaffold is removed stand up, advance the sand washing room afterwards at hull before, only need platform supported to take out two grooves of screw from otic placode of two convexities on the angle steel to get final product; After closing up end, more whole scaffold is dismantled, and the part otic placode on the hull of welding forever need not removed.This scaffold is an integral type pin hand platform, when need using, only needs that it is lifted suitable position and get final product, wait paint to complete after, integral body hangs out again, and is convenient and swift, can not destroy paint.
Description of drawings:
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the structural representation of otic placode;
Fig. 3 supports the structural representation of angle steel for platform;
Label among the figure: 1-otic placode, 2-groove, 3-platform support angle steel, 4-screw, 5-grab rail, 6-pedal, 7-protection hawser, 8-hull, 9-angle steel.
The specific embodiment:
In order to deepen understanding to the utility model, will combine embodiment and accompanying drawing that the utility model is done further to detail below, this embodiment only is used to explain the utility model, does not constitute the qualification to the utility model protection domain.
Show a kind of specific embodiment of the utility model scaffold like Fig. 1 to Fig. 3, comprise otic placode 1, be provided with two oblique grooves 2 in the otic placode 1; Otic placode 1 is connected with platform and supports angle steel 3; 4, two screws 4 of screw that one end of platform support angle steel 3 is provided with two convexities place two grooves 2 respectively, and the other end of platform support angle steel 3 is connected with the grab rail 5 of vertical setting; Platform supports below, angle steel 3 middle parts and is fixed with pedal 6, and the upper and lower side of grab rail 5 all is installed with protection hawser 7.
Earlier platform is supported between angle steel and pedal, the grab rail and weld; Be that platform supports between angle steel and pedal, the grab rail and all captives joint; And otic placode is on the angle steel 9 that is welded on the hull 8; Can weld a plurality of otic placodes on the angle steel, otic placode and platform support and are flexible connection between the angle steel, and the screw that is about to two convexities on the platform support angle steel places two grooves on the otic placode respectively; Need not whole scaffold is removed stand up, advance the sand washing room afterwards at hull before; Only need platform supported to take out two grooves of screw from otic placode of two convexities on the angle steel get final product, after closing up end, more whole scaffold is dismantled, and the part otic placode on the hull that welds forever need not removed.This scaffold is an integral type pin hand platform, when need using, only needs that it is lifted suitable position and get final product, wait paint to complete after, integral body hangs out again, and is convenient and swift, can not destroy paint.

Claims (2)

1. scaffold; Comprise otic placode (1); It is characterized in that: be provided with two oblique grooves (2) in the said otic placode (1); Said otic placode (1) is connected with platform and supports angle steel (3), and an end of said platform support angle steel (3) is provided with the screw (4) of two convexities, and two said screws (4) place two said grooves (2) respectively; The other end of said platform support angle steel (3) is connected with the grab rail (5) of vertical setting, and said platform supports below, angle steel (3) middle part and is fixed with pedal (6).
2. according to the said scaffold of claim 1, it is characterized in that: the upper and lower side of said grab rail (5) all is installed with protection hawser (7).
CN201120394684XU 2011-10-17 2011-10-17 Scaffold Expired - Fee Related CN202244024U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120394684XU CN202244024U (en) 2011-10-17 2011-10-17 Scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120394684XU CN202244024U (en) 2011-10-17 2011-10-17 Scaffold

Publications (1)

Publication Number Publication Date
CN202244024U true CN202244024U (en) 2012-05-30

Family

ID=46105309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120394684XU Expired - Fee Related CN202244024U (en) 2011-10-17 2011-10-17 Scaffold

Country Status (1)

Country Link
CN (1) CN202244024U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109488008A (en) * 2018-10-09 2019-03-19 广州黄船海洋工程有限公司 A kind of coupling type hanger job platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109488008A (en) * 2018-10-09 2019-03-19 广州黄船海洋工程有限公司 A kind of coupling type hanger job platform

Similar Documents

Publication Publication Date Title
CN105716888B (en) A kind of wing-box experimental rig and its method
CN102720356B (en) Steel beam grid floor formwork system
CN202627475U (en) Scaffold wall connecting member
CN202574588U (en) Clamping structure for marine scaffold
CN203820313U (en) Labor protecting platform for gantry crane and capable of realizing folding
CN204737609U (en) European style hoist girder connection structure
CN204590585U (en) A kind of aluminum alloy mould plate
CN202244024U (en) Scaffold
CN202896824U (en) Detachable angle-adjustable temporary safety railing
CN103774838A (en) Assembly type safe operation platform for elevator shaft construction and use method thereof
CN204893900U (en) Build total group bed -jig module on boats and ships
CN201525492U (en) Fixture
CN207079948U (en) A kind of life rope fixed mount
CN102785766B (en) New Marine scaffold tooling combination
CN210368656U (en) Staple bolt device is adhered to pier construction bridge type scaffold lift platform
CN204475843U (en) A kind of fast early stripping formwork system support for building
CN205935924U (en) Rail stand connecting piece
CN103966990A (en) Single-rack pile leg block closure method and single-rack pile leg block closure tool
CN204781944U (en) A mode structure of infilled wall constructional column
CN204081536U (en) For the detachable safety device of Steel Structure Installation in a kind of building operations
CN202627275U (en) Keel structure for dry-hanging stone curtain walls
CN208749071U (en) A kind of reinforcing heightening type hanging basket connection system
CN203701702U (en) Splicing type dustproof shed
CN205153801U (en) Detachable connector is used with protection frame to outdoor elevator guard gate
CN202787960U (en) Steel girder grid floor formwork system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120530

Termination date: 20141017

EXPY Termination of patent right or utility model