CN202241574U - Movable steel pedestal - Google Patents

Movable steel pedestal Download PDF

Info

Publication number
CN202241574U
CN202241574U CN2011202905005U CN201120290500U CN202241574U CN 202241574 U CN202241574 U CN 202241574U CN 2011202905005 U CN2011202905005 U CN 2011202905005U CN 201120290500 U CN201120290500 U CN 201120290500U CN 202241574 U CN202241574 U CN 202241574U
Authority
CN
China
Prior art keywords
movable
movable steel
steel
sections
pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011202905005U
Other languages
Chinese (zh)
Inventor
叶水标
胡兵良
金凯
邵德良
洪祥水
范厚彬
丁祝良
宋智鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Provincial Transporation Eningeering & Construction Group Co Ltd
Zhejiang Jinzhu Transportation Construction Co Ltd
Original Assignee
Zhejiang Provincial Transporation Eningeering & Construction Group Co Ltd
Zhejiang Jinzhu Transportation Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Provincial Transporation Eningeering & Construction Group Co Ltd, Zhejiang Jinzhu Transportation Construction Co Ltd filed Critical Zhejiang Provincial Transporation Eningeering & Construction Group Co Ltd
Priority to CN2011202905005U priority Critical patent/CN202241574U/en
Application granted granted Critical
Publication of CN202241574U publication Critical patent/CN202241574U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model relates to a movable steel pedestal, which comprises two sections of movable sections, a section of fixed section and two sections of movable steel plate sections, wherein the fixed section is cushioned in the center of a bottom face of a pseudo-precast prestressed beam and is fixedly connected with a cushion layer embedded part; the movable sections are cushioned on the two ends of the bottom face of the pseudo-precast prestressed beam and are arranged in a groove formed by embedded angle steel corresponding to two notches; the angle pad of the embedded angle steel is used for adjusting elevated wedge-shaped cushion blocks on the top parts of the movable sections; the movable steel plate sections are arranged between the movable sections and the fixed section; and a drawable ladder-shaped cushion block is cushioned in a gap between each movable steel plate section and a concrete cushion layer. The technical problems that: the bottom face of the end part of the traditional precast prestressed beam is easy to produce crevasse in a tension process, the quality cannot be ensured, the pedestal is easy to squash, and the like, are solved. The movable steel pedestal can be widely applied to the precast prestressed beam.

Description

Movable steel pedestal
Technical field
The utility model relates to a kind of steel pedestal of precast prestressed beam.
Background technology
The in-situ precast prestressed concrete beam is a way commonly used in the science of bridge building; Traditional way is that pedestal is as a whole, is arranged on to intend under the precast prestressed beam, and this way exists precast beam in stretching process; Because the stretch-draw effect causes whole steel pedestal end face to bear big pressure; There is bigger tension in precast prestressed beam end concrete bottom, and can't discharge slippage and decrement owing to bottom pedestal overall fixed, causes the pedestal end by conquassation; And precast prestressed beam head bottom part concrete produces the drawback in vertical crack, and the quality of precast prestressed beam can't guarantee.
The utility model content
The purpose of the utility model provides a kind of movable steel pedestal, solve traditional precast prestressed beam and be easy to generate the crack in stretching process medial end portions bottom surface, and quality can't guarantee that pedestal is easily by technical problems such as conquassation.
For realizing above-mentioned purpose, the utility model adopts following technical scheme:
A kind of movable steel pedestal; Pad is embedded with the bed course built-in fitting of outstanding its upper surface on the said concrete cushion between concrete cushion and plan precast prestressed beam, comprise two sections active segments, one section canned paragraph and two sections movable steel plate bands; Wherein, Said canned paragraph pad is fixedly connected with the bed course built-in fitting intending the bottom surface central authorities of precast prestressed beam, and said active segment pad is at the two ends of intending precast prestressed soffit; And be placed in the groove that forms by two relative pre-buried angle steel of notch; And pre-buried angle steel bight pad is used to regulate the high correcting wedge of active segment top mark, and said movable steel plate band is lined with the trapezoidal cushion block that can transfer in the slit between itself and the concrete cushion between active segment and canned paragraph.
Said bed course built-in fitting is I-steel, channel-section steel or square bar.
The spacing of said bed course built-in fitting does not wait at active segment and canned paragraph.
Said pre-buried angle steel length and active segment equal in length.
Said movable steel plate band two sides are welded with the outside frame plate angle steel of notch, and said frame plate slotted-angle shelving is located on the bed course built-in fitting of movable steel plate band both sides.
Compared with prior art the utlity model has following characteristics and beneficial effect:
The utility model is through becoming the two ends activity with original overall fixed pedestal, center fixed, and dismountable movable steel plate band is set; Satisfied in the stretching process; The demand of two ends pedestal free subsidence and inside slippage has been avoided because the precast prestressed beam base failure that stretch-draw causes and the destruction of pedestal have guaranteed construction quality; Improve the construction life-span of pedestal, practiced thrift construction cost.
Through pad wedge shape steel pad in movable steel pedestal bottom surface; The trapezoidal bloom of pad below the movable steel plate band; The top mark height of having guaranteed movable steel pedestal, movable steel plate band and fixing steel pedestal is identical, avoids occurring because the pedestal split causes the irregular constructional deficiency in precast prestressed soffit.
In addition,, in work progress, can have enough to meet the need construction, improve the utilization rate of construction equipment because pedestal comprises that two sections active segments, one section canned paragraph and two sections movable steel plate bands are split type setting.
The utility model can be widely used in the pedestal of precast prestressed beam.
Description of drawings
Below in conjunction with accompanying drawing the utility model is done further detailed explanation.
Fig. 1 is the utility model structural representation.
Fig. 2 is Figure 1A-A cutaway view.
Fig. 3 is the left view of Fig. 1.
Pedestal user mode figure when Fig. 4 is the top girder tensioning.
Reference numeral: 1-concrete cushion, 2-bed course built-in fitting, 3-active segment, 4-canned paragraph, the pre-buried angle steel of 5-, the movable steel plate band of 6-, 7-correcting wedge, 8-intend prefabricated stretch-draw beam, the trapezoidal cushion block of 9-.
The specific embodiment
Embodiment is referring to Fig. 1, Fig. 2 and shown in Figure 3, and a kind of movable steel pedestal fills up between concrete cushion 1 and plan precast prestressed beam 8; Be embedded with the bed course built-in fitting 2 of outstanding its upper surface on the said concrete cushion; It is characterized in that: comprise two sections active segments 3, one section canned paragraph 4 and two sections movable steel plate bands 6, wherein, said canned paragraph 4 pads are being intended the bottom surface central authorities of precast prestressed beam 8; Be fixedly connected with bed course built-in fitting 2; Said active segment 3 fills up at the two ends of intending precast prestressed beam 8 bottom surfaces, and is placed in the groove that is formed by two relative pre-buried angle steel 5 of notch, and pre-buried angle steel 5 bight pads are used to regulate the high correcting wedge 7 of active segment 3 top marks; Said movable steel plate band 6 is lined with the trapezoidal cushion block 9 that can transfer in the slit between itself and the concrete cushion 1 between active segment 3 and canned paragraph 4.
Said bed course built-in fitting 2 is I-steel, channel-section steel or square bar.
The spacing of said bed course built-in fitting 2 does not wait at active segment 3 and canned paragraph 4.
Said pre-buried angle steel 5 length and active segment equal in length.
Said movable steel plate band 6 two sides are welded with the outside frame plate angle steel 10 of notch, and said frame plate angle steel 10 is erected on the bed course built-in fitting 2 of movable steel plate band both sides.
Above-mentioned movable steel pedestal construction procedure in actual use is following:
Step 1, steel pedestal blinding concrete are built simultaneously at the pre-buried bed course built-in fitting of upper surface: foundation bearing capacity, blinding concrete intensity and physical dimension, absolute altitude, the setting of bed course built-in fitting should meet job specfication and related request with welding.
Step 2, calculating applies pedestal slippage in the prestressing force process according to formula, settling amount calculates.
Wherein, steel pedestal settling amount computing formula:
End settling amount (mm) during C in the formula-arch camber;
H-beam slab camber (mm);
L-precast beam length (mm);
L1-end pedestal length (mm).
Steel pedestal slippage computing formula:
Figure 2011202905005100002DEST_PATH_IMAGE002
L2-slippage in the formula (mm);
H-beam slab camber (mm);
L-precast beam length (mm).
Step 3 installs and fixes pedestal in plan centre position, precast beam bottom surface, and itself and the welding of bed course built-in fitting is fixing.
Step 4; Setting of movable steel pedestal built-in fitting and welding: intend installation traveling table seat at the two ends of intending the precast beam bottom surface and put the bottom, two sides; One of 50mm * 50mm * 1500mm angle steel respectively is set; And be welded to connect with the bed course built-in fitting, its axis, position, absolute altitude (containing the sedimentation value) should adhere to specification.
Step 5; Two pre-buried angle steel (on paste that two-layer 5cm is wide, the thick double faced adhesive tape of 2.5mm; Require smooth-going and no wrinkle, and at two pre-buried angle steel) installation activity steel pedestal in the groove that forms, and it is concordant with fixed base top mark height to adjust its top mark height through the wedge shape steel pad of plug under its bottom surface;
Step 6 is put into movable steel pedestal and the fixing slit between the steel pedestal with the movable steel plate in suspender belt place, and in its bottom with the movable steel pedestal of the top mark height of the movable steel plate in wedge shape steel pad adjustment suspender belt place and both sides with fixedly the steel pedestal is concordant;
Step 7 is referring to Fig. 4; Begin the construction of precast prestressed T beam; Remove wedge shape steel pad and suspender belt place activity strip before the stretch-draw; Arch camber in the middle of prefabricated T beam during the precast prestressed T beam of stretch-draw; The movable steel pedestal at its two ends is under pressure and discharges owing to having removed wedge shape steel pad, and trend that it inwardly slides can freely inwardly be slided owing to removed suspender belt place activity strip, makes the tension between the movable steel pedestal end face and T beam end concrete bottom when the elder sister maintains bigger bearing area and eliminated stretch-draw eventually between movable steel pedestal end face and the T beam end concrete bottom.Guaranteed that precast prestressed T beam its head bottom part concrete in stretching process does not produce vertical crack.

Claims (5)

1. movable steel pedestal; Pad is between concrete cushion (1) and plan precast prestressed beam (8); Be embedded with the bed course built-in fitting (2) of outstanding its upper surface on the said concrete cushion; It is characterized in that: comprise two sections active segments (3), one section canned paragraph (4) and two sections movable steel plate bands (6), wherein, said canned paragraph (4) pad is being intended the bottom surface central authorities of precast prestressed beam (8); Be fixedly connected with bed course built-in fitting (2); Said active segment (3) fills up at the two ends of intending precast prestressed beam (8) bottom surface, and is placed in the groove that is formed by two relative pre-buried angle steel (5) of notch, and pre-buried angle steel (5) bight pad is used to regulate the high correcting wedge (7) of active segment (3) top mark; Said movable steel plate band (6) is positioned between active segment (3) and the canned paragraph (4), is lined with the trapezoidal cushion block (9) that can transfer in the slit between itself and the concrete cushion (1).
2. movable steel pedestal according to claim 1 is characterized in that: said bed course built-in fitting (2) is I-steel, channel-section steel or square bar.
3. movable steel pedestal according to claim 1 is characterized in that: the spacing of said bed course built-in fitting (2) does not wait at active segment (3) and canned paragraph (4).
4. movable steel pedestal according to claim 1 is characterized in that: said pre-buried angle steel (5) length and active segment equal in length.
5. movable steel pedestal according to claim 1 is characterized in that: said movable steel plate band (6) two sides are welded with the outside frame plate angle steel (10) of notch, and said frame plate angle steel (10) is erected on the bed course built-in fitting (2) of movable steel plate band both sides.
CN2011202905005U 2011-08-11 2011-08-11 Movable steel pedestal Expired - Lifetime CN202241574U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202905005U CN202241574U (en) 2011-08-11 2011-08-11 Movable steel pedestal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202905005U CN202241574U (en) 2011-08-11 2011-08-11 Movable steel pedestal

Publications (1)

Publication Number Publication Date
CN202241574U true CN202241574U (en) 2012-05-30

Family

ID=46102868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202905005U Expired - Lifetime CN202241574U (en) 2011-08-11 2011-08-11 Movable steel pedestal

Country Status (1)

Country Link
CN (1) CN202241574U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102785281A (en) * 2012-08-21 2012-11-21 天津银龙预应力材料股份有限公司 Freely movable concrete slab pedestal and steel mold
CN103273559A (en) * 2013-06-06 2013-09-04 浙江金筑交通建设有限公司 Movable steel module of sling position of prefabricated T-type beam and construction method thereof
CN103273567A (en) * 2013-06-06 2013-09-04 浙江金筑交通建设有限公司 Movable steel pedestal with adjustable jacking and construction method thereof
CN108818890A (en) * 2018-06-29 2018-11-16 中交二公局东萌工程有限公司 A kind of I-steel T girder prefabricated pedestal and preparation method thereof
CN109397486A (en) * 2018-11-14 2019-03-01 中交公局桥隧工程有限公司 A kind of mobile spigot-and-socket fashioned iron pedestal structure
CN114032914A (en) * 2021-11-09 2022-02-11 中国建筑第八工程局有限公司 Steel support and underground continuous wall connecting node and correcting die and construction method thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102785281A (en) * 2012-08-21 2012-11-21 天津银龙预应力材料股份有限公司 Freely movable concrete slab pedestal and steel mold
CN102785281B (en) * 2012-08-21 2014-08-06 天津银龙预应力材料股份有限公司 Freely movable concrete slab pedestal and steel mold
CN103273559A (en) * 2013-06-06 2013-09-04 浙江金筑交通建设有限公司 Movable steel module of sling position of prefabricated T-type beam and construction method thereof
CN103273567A (en) * 2013-06-06 2013-09-04 浙江金筑交通建设有限公司 Movable steel pedestal with adjustable jacking and construction method thereof
CN103273567B (en) * 2013-06-06 2015-04-22 浙江金筑交通建设有限公司 Movable steel pedestal with adjustable jacking and construction method thereof
CN103273559B (en) * 2013-06-06 2015-08-12 浙江金筑交通建设有限公司 A kind of movable steel module of Precast T-Beam suspender belt position and construction method
CN108818890A (en) * 2018-06-29 2018-11-16 中交二公局东萌工程有限公司 A kind of I-steel T girder prefabricated pedestal and preparation method thereof
CN109397486A (en) * 2018-11-14 2019-03-01 中交公局桥隧工程有限公司 A kind of mobile spigot-and-socket fashioned iron pedestal structure
CN114032914A (en) * 2021-11-09 2022-02-11 中国建筑第八工程局有限公司 Steel support and underground continuous wall connecting node and correcting die and construction method thereof
CN114032914B (en) * 2021-11-09 2023-02-28 中国建筑第八工程局有限公司 Steel support and underground continuous wall connecting node and correcting die and construction method thereof

Similar Documents

Publication Publication Date Title
CN202241574U (en) Movable steel pedestal
CN102477717B (en) A kind of bridge pushing construction method
CN103726450A (en) Simply-supported slab bridge jack-up method and height-adjustable combined cushion structure applied therein
CN205676785U (en) Leveling block formwork for placing device at the bottom of a kind of Bridge Support Replacement beam
CN107190647A (en) A kind of alignment control apparatus and method suitable for the special-shaped tower of steel construction
CN105908583B (en) System for replacing ballast track bed of tunnel with ballastless track under condition of uninterrupted driving
CN105239502B (en) Uniform force transmission device used for bridge support and installation method of uniform force transmission device
CN100582373C (en) Jacking force-adjustable prestressed resilient support structure and construction method thereof
CN110184912A (en) A kind of rail slab and girder system and production method
CN108708292A (en) A kind of I-shaped steel reinforced concrete combination beam concrete folding constructing device and construction method
CN103273567B (en) Movable steel pedestal with adjustable jacking and construction method thereof
CN105926381B (en) Method for replacing ballast track bed of tunnel with ballastless track under condition of uninterrupted driving
KR101153431B1 (en) Apparatus for controlling the position of upper structure for lifting the bridge and the method for increasing the cross section of lower structure using the same apparatus
CN203282598U (en) Movable steel pedestal with adjustable jacking
CN210685373U (en) Trolley system suitable for concrete structure factory building construction
CN110820559A (en) Cement concrete bridge deck pavement and construction method
CN216803924U (en) Assembled adjustable beam pedestal
CN201891086U (en) Temporary pier top adjusting device for bridge pushing construction
CN211947998U (en) Fine adjustment positioning device for steel structure tower arch
US20220162806A1 (en) Ballastless track section for a rail vehicle
KR101121725B1 (en) Construction method for psc girder and slab with precast deck and bridge construction method using the same
CN210288121U (en) Steel box-concrete composite beam concrete pouring system
CN208777175U (en) A kind of overlapping constructing device of I-shaped steel reinforced concrete combination beam concrete
CN214497155U (en) Bridge expansion joint support leveling component
CN211596417U (en) Slide way beam reaction frame for adjusting linear deviation of steel truss beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20120530

CX01 Expiry of patent term