CN202238194U - Ore toppling prevention device for ore feeding end of ball mill - Google Patents

Ore toppling prevention device for ore feeding end of ball mill Download PDF

Info

Publication number
CN202238194U
CN202238194U CN2011203434790U CN201120343479U CN202238194U CN 202238194 U CN202238194 U CN 202238194U CN 2011203434790 U CN2011203434790 U CN 2011203434790U CN 201120343479 U CN201120343479 U CN 201120343479U CN 202238194 U CN202238194 U CN 202238194U
Authority
CN
China
Prior art keywords
ore deposit
flange cover
ore
ball mill
end cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011203434790U
Other languages
Chinese (zh)
Inventor
张禾壮
安辉
黄福彪
陈小艳
Original Assignee
Angang Group Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Group Mining Co Ltd filed Critical Angang Group Mining Co Ltd
Priority to CN2011203434790U priority Critical patent/CN202238194U/en
Application granted granted Critical
Publication of CN202238194U publication Critical patent/CN202238194U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

The utility model relates to an ore toppling prevention device for an ore feeding end of a ball mill, which comprises an ore feeding sleeve end cover and an ore feeding pipe. The ore toppling prevention device is characterized in that a flange sleeve is arranged on the ore feeding sleeve end cover and sleeved with the ore feeding pipe, a sealing gasket is arranged between the flange sleeve and the ore feeding sleeve end cover, a flange sleeve end cover with a center hole is disposed at the other end of the flange sleeve, an annular groove is arranged on the outer surface of the flange sleeve end cover and disposed around the center hole, a sealing part is disposed in the groove, a gland which is concentric with the flange sleeve end cover is arranged on the flange sleeve end cover, a water accumulating pipe is sleeved on the outer surface of the ore feeding pipe, a water accumulating pipe end cover is disposed at one end of the water accumulating pipe, a group of supporting ribs is uniformly arranged on the inner surface of the other end of the water accumulating pipe, a water filling opening is disposed on the upper portion of the water accumulating pipe, the water accumulating pipe penetrates through the center hole of the flange sleeve end cover to be inserted into the flange sleeve, and a water accumulating cavity is formed among the water accumulating pipe, the flange sleeve and the ore feeding sleeve end cover. By the aid of the ore toppling prevention device for the ore feeding end of the ball mill, a working environment is improved, labor intensity of workers is reduced, and the problem of ore toppling of the ore feeding end of the ball mill is solved completely.

Description

Prevent that ball mill is to the ore deposit end device of falling the ore deposit
Technical field
The utility model relates to the preparation equipment technical field, and particularly a kind of ball mill that prevents is to the ore deposit end device of falling the ore deposit.
Background technology
Ball mill is the important equipment in metallurgical mine ore dressing plant; Along with the demand of market to iron ore concentrate increases; The output of iron ore concentrate also increases thereupon; Increase when so just causing the unit treatment bench of ball mill, increase treating capacity and have only and increase raw ore amount that feeds ball mill and the milling medium steel ball amount that increases in the ball mill.After yet the raw ore amount increased with the steel ball amount in the ball mill, this two mixture plane just was higher than to the ore deposit sleeve, just appear at mineral-feeding pipe with to the phenomenon in ore deposit outside ball mill of the gap location between the sleeve end cap of ore deposit.Reason is because the axis of the axis of mineral-feeding pipe and ball mill conllinear not, thus form mineral-feeding pipe and ball mill is inhomogeneous to the gap between the end cap of ore deposit, and deviation is bigger; Though be provided with O-ring seal here; But the sealing function of O-ring seal is not obvious, causes taking place the serious phenomenon of falling the ore deposit, has both polluted working environment; Increase post personnel's labour intensity again, also increased production cost simultaneously.To this phenomenon of falling the ore deposit, the way of taking at present is below ball mill is given the ore deposit end cap, a big rectangle funnel to be set, and the mineral of pouring out fall into funnel, enter the pump hole with recirculated water through pipeline, through the slag stock pump it are fed permanent magnetic motor and sort.But because the mineral granularity that ball mill is poured out is excessive, be far longer than the granularity after ball mill grinds, behind the entering permanent magnetic motor under casing, part is deposited on the permanent magnetic motor under casing, and part is drained with mine tailing, causes waste.
Summary of the invention
The utility model provides a kind of ball mill that prevents to the ore deposit end device of falling the ore deposit, its objective is the fall ore deposit problem of thorough solution ball mill to the ore deposit end, improves working environment, reduces production costs, and boosts productivity.
The purpose of the utility model realizes through following technical proposals:
The utility model prevent that ball mill to the ore deposit end device of falling the ore deposit, comprising to ore deposit sleeve end cap, mineral-feeding pipe, it is characterized in that covering for the ore deposit socket end to be provided with the flange cover described; This flange cover socket-connects with described mineral-feeding pipe; Be provided with sealing gasket this flange cover and described giving between the sleeve end cap of ore deposit, be provided with the flange cover end cap of band centre bore, be provided with annular groove on every side at outer surface, the centre bore of this flange cover end cap at the other end of said flange cover; In this groove, be provided with sealing; On described flange cover end cap, be provided with the concentric gland of flange cover end cap therewith, at water accumulation pipe of outer surface socket of said mineral-feeding pipe, an end of this water accumulation pipe is provided with the water accumulation pipe end cap; The inner surface of the other end evenly is provided with one group of brace rod; Top at said water accumulation pipe is provided with water filling port, and the centre bore that described water accumulation pipe passes said flange cover end cap inserts in the described flange cover, and described water accumulation pipe, flange cover and described giving form the ponding chamber between the sleeve end cap of ore deposit.
Described flange cover by with the said canned paragraph of fixing and be connected for ore deposit sleeve end cap; One end is the section of being flexible coupling that is connected of canned paragraph therewith; The free section that is connected of the other end of the section of being flexible coupling therewith; The one group of transmission torque mechanism that is located at the outer surface of said canned paragraph is formed, and the other end of said free section fixes with described flange cover end cap and is connected.
Described transmission torque mechanism is by the torque pin that is located at said free section outer surface; Be located at the outer surface of said canned paragraph and the transmission torque plate of torque pin corresponding section therewith; Be located at this conduction hole of transmitting on the torque plate and form, this conduction hole and described torque pin socket-connect.
Said one group of quantity of transmitting torque mechanism is 2-6.
The described section of being flexible coupling is a rubber sleeve.
Describedly be sealed into the packing linear sealing.
The ball mill that prevents of the utility model to the advantage of the ore deposit end device of falling the ore deposit is:
1, adopt the recirculated water top towards method; Be that recirculated water gets in the ponding chamber through the water filling port of water accumulation pipe; Because ball mill inside is atmospheric pressure state, and the pressure of recirculated water is 0.4Mpa, so in the ponding chamber, also formed 0.4Mpa hydraulic pressure; Therefore the inner mineral of ball mill just can not be poured out to the fit clearance between the sleeve end cap of ore deposit from mineral-feeding pipe and ball mill, have thoroughly solved ball mill and have fallen the problem in ore deposit to the ore deposit end;
2, adopted the flange cover that constitutes by canned paragraph, the section of being flexible coupling and free section; Compensate because ball mill axis and the mineral-feeding pipe axis eccentric throw that produces of conllinear not through free-ended swing, avoid flange to overlap because of the damage that causes after the long-term work or the damage of mineral-feeding pipe;
3, because the section of being flexible coupling is a rubber sleeve; Its tube wall is thinner, and it is relatively poor to be turned round ability, carries out the damage that canned paragraph causes to the moment of torsion transmission of free section for a long time for preventing rubber sleeve; Evenly be provided with 6 at flange cover outer surface and transmit torque mechanism; Transmitting between torque plate and the torque pin is to slide relatively, can satisfy the demand that free section freely swings, and can guarantee the transmission of moment of torsion again.Prolonged the service life of flange cover.
The utility model has improved working environment, has reduced working strength of workers, reduced the loss of mineral, has thoroughly solved ball mill and has fallen the problem in ore deposit to the ore deposit end, and economic benefit is obvious.
Description of drawings
Fig. 1 is the structural representation of the utility model.
The specific embodiment
The specific embodiment below in conjunction with description of drawings the utility model.
As shown in Figure 1; The utility model prevent that ball mill to the ore deposit end device of falling the ore deposit, comprising to ore deposit sleeve end cap 1, mineral-feeding pipe 14, it is characterized in that being provided with the flange cover described giving on the ore deposit sleeve end cap 1; This flange cover socket-connects with described mineral-feeding pipe 14; Be provided with sealing gasket 2 this flange cover and described giving between the ore deposit sleeve end cap 1, be provided with the flange cover end cap 10 of band centre bore, be provided with annular groove on every side at outer surface, the centre bore of this flange cover end cap 10 at the other end of said flange cover; In this groove, be provided with sealing, this is sealed into 12 sealings of packing line.On described flange cover end cap 10, be provided with the concentric gland 11 of flange cover end cap therewith 10; Water accumulation pipe 17 of outer surface socket at said mineral-feeding pipe 14; One end of this water accumulation pipe 17 is provided with water accumulation pipe end cap 15; The inner surface of the other end evenly is provided with one group of brace rod 16; Be provided with water filling port 13 on the top of said water accumulation pipe 17, the centre bore that described water accumulation pipe 17 passes said flange cover end cap 10 inserts in the described flange cover, and described water accumulation pipe 17, flange cover are given formation ponding chamber 9 between the ore deposit sleeve end cap 1 with described.This kind structure is convenient to utilize the recirculated water that has pressure to withstand the mineral that mineral-feeding pipe and ball mill are given the gap location between the sleeve end cap of ore deposit, stop its from then on gap location pour out.
Described flange cover by with the said canned paragraph 3 of fixing and be connected for ore deposit sleeve end cap 1; One end is the section of being flexible coupling 5 that is connected of canned paragraph 3 therewith; The free section 8 that is connected of the other end of the section of being flexible coupling 5 therewith; The one group of transmission torque mechanism that is located at the outer surface of said canned paragraph 3 is formed, and the described section of being flexible coupling 5 is a rubber sleeve.The other end of said free section 8 fixes with described flange cover end cap 10 and is connected.The flange cover of this kind structure can compensate because ball mill axis and the mineral-feeding pipe axis eccentric throw that produces of conllinear not through free-ended swing, avoids flange to overlap because of the damage that causes after the long-term work or the damage of mineral-feeding pipe.
Described transmission torque mechanism is by the torque pin 6 that is located at said free section 8 outer surfaces; Be located at the outer surface of said canned paragraph 3 and the transmission torque plate 4 of torque pin 6 corresponding sections therewith; Be located at this and transmit 7 compositions in conduction hole on the torque plate 4, this conduction hole 7 socket-connects with described torque pin 6.Transmitting between torque plate and the torque pin is to slide relatively, can satisfy the demand that free section freely swings, and can guarantee the transmission of moment of torsion again.Prolonged the service life of flange cover.

Claims (6)

1. one kind prevents that ball mill to the ore deposit end device of falling the ore deposit, comprising to ore deposit sleeve end cap, mineral-feeding pipe, it is characterized in that being provided with the flange cover described covering to the ore deposit socket end; This flange cover socket-connects with described mineral-feeding pipe; Be provided with sealing gasket this flange cover and described giving between the sleeve end cap of ore deposit, be provided with the flange cover end cap of band centre bore, be provided with annular groove on every side at outer surface, the centre bore of this flange cover end cap at the other end of said flange cover; In this groove, be provided with sealing; On described flange cover end cap, be provided with the concentric gland of flange cover end cap therewith, at water accumulation pipe of outer surface socket of said mineral-feeding pipe, an end of this water accumulation pipe is provided with the water accumulation pipe end cap; The inner surface of the other end evenly is provided with one group of brace rod; Top at said water accumulation pipe is provided with water filling port, and the centre bore that described water accumulation pipe passes said flange cover end cap inserts in the described flange cover, and described water accumulation pipe, flange cover and described giving form the ponding chamber between the sleeve end cap of ore deposit.
2. the ball mill that prevents according to claim 1 is to the ore deposit end device of falling the ore deposit; It is characterized in that described flange cover by with the said canned paragraph of fixing and be connected for ore deposit sleeve end cap; One end is the section of being flexible coupling that is connected of canned paragraph therewith; The free section that is connected of the other end of the section of being flexible coupling therewith, a group of outer surface that is located at said canned paragraph transmits torque mechanism to be formed, and the said free section other end and described flange overlap end cap and fix and be connected.
3. the ball mill that prevents according to claim 2 is to the ore deposit end device of falling the ore deposit; It is characterized in that described transmission torque mechanism is by the torque pin that is located at said free section outer surface; Be located at the outer surface of said canned paragraph and the transmission torque plate of torque pin corresponding section therewith; Be located at this conduction hole of transmitting on the torque plate and form, this conduction hole and described torque pin socket-connect.
4. the ball mill that prevents according to claim 2 is characterized in that to the ore deposit end device of falling the ore deposit said one group of quantity of transmitting torque mechanism is 2-6.
5. the ball mill that prevents according to claim 2 is characterized in that to the ore deposit end device of falling the ore deposit the described section of being flexible coupling is rubber sleeve.
6. the ball mill that prevents according to claim 1 is characterized in that the described packing linear sealing that is sealed into to the ore deposit end device of falling the ore deposit.
CN2011203434790U 2011-09-14 2011-09-14 Ore toppling prevention device for ore feeding end of ball mill Expired - Lifetime CN202238194U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203434790U CN202238194U (en) 2011-09-14 2011-09-14 Ore toppling prevention device for ore feeding end of ball mill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203434790U CN202238194U (en) 2011-09-14 2011-09-14 Ore toppling prevention device for ore feeding end of ball mill

Publications (1)

Publication Number Publication Date
CN202238194U true CN202238194U (en) 2012-05-30

Family

ID=46099499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203434790U Expired - Lifetime CN202238194U (en) 2011-09-14 2011-09-14 Ore toppling prevention device for ore feeding end of ball mill

Country Status (1)

Country Link
CN (1) CN202238194U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102441468A (en) * 2011-09-14 2012-05-09 鞍钢集团矿业公司 Device for preventing ball mill feeding end from pouring ore
CN110481054A (en) * 2019-08-28 2019-11-22 福州森百德机电科技有限公司 Large pipe Flange making apparatus and its manufacture craft

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102441468A (en) * 2011-09-14 2012-05-09 鞍钢集团矿业公司 Device for preventing ball mill feeding end from pouring ore
CN110481054A (en) * 2019-08-28 2019-11-22 福州森百德机电科技有限公司 Large pipe Flange making apparatus and its manufacture craft

Similar Documents

Publication Publication Date Title
CN100395031C (en) Protective unit for hollow axle of mill end cap and end cap of grate type mill thereof
CN202238194U (en) Ore toppling prevention device for ore feeding end of ball mill
CN102441468A (en) Device for preventing ball mill feeding end from pouring ore
CN204396150U (en) Pulp deferrization device
CN102632215B (en) Water-cooled metal type centrifugal cast pipe mold powder conveyor
CN204493286U (en) A kind of sand pump pulp-inlet pipe connection set
CN202290147U (en) Mining explosion-proof type superfine cement wet grinder
CN211872064U (en) External air stirring leaching tank
CN205096586U (en) Tapping machine is pressed in electronic pipeline area
CN207158338U (en) The anti-blocking device for suction material of vacuum feeder
CN104675660B (en) Vertical plunger metering pump group
CN102380457A (en) Spiral separating sand feeder
CN204034406U (en) A kind of piping filter
CN201755504U (en) Sealing device for liner bushings and end covers of ball mill
CN201606265U (en) Pump head of magnetic submerged pump
CN201770985U (en) Stirring shaft for wet type concrete sprayer
CN204626899U (en) A kind of new type mortar flush coater
CN205526333U (en) Rotation shaft sealing mechanism of defeated mud machine of auger
CN213592646U (en) Fixing device for sealing door part of spherical ink tube surface deburring device
CN202484483U (en) Rotary liquid feeding/discharging device
CN203437612U (en) Pouring cup for casting
CN201606309U (en) External pit shaft of magnetic submerged pump
CN203363162U (en) Mortar machine shaft-end sealing device
CN202290200U (en) Large-diameter rod mill
CN210891071U (en) Feed liquid monitoring device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 114001 Anshan District, Liaoning, No. 219 Road, No. 39, Tiedong

Patentee after: Anshan Iron and Steel Group Mining Co., Ltd.

Address before: 114001 Anshan District, Liaoning, No. 219 Road, No. 39, Tiedong

Patentee before: Angang Group Mine Company

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120530