- CN202230327U CN202230327U CN2011201260455U CN201120126045U CN202230327U CN 202230327 U CN202230327 U CN 202230327U CN 2011201260455 U CN2011201260455 U CN 2011201260455U CN 201120126045 U CN201120126045 U CN 201120126045U CN 202230327 U CN202230327 U CN 202230327U
- Authority
- CN
- China
- Prior art keywords
- incident
- interest
- priority
- testing result
- event
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Provided is a computer associated event executing control system, comprising a client terminal, a control server, and an executing server, wherein the client terminal is connected with the control server via the internet; the control server is connected with the executing server via the internet; the executing server is in charge of establishing the mapping relationship between the business and the event and establishing the mapping relationship of the marking, the completing state, and the priority of the event; the client terminal collects the business requests input by the users and uploads the business requests to the control server via the internet; and the control server comprises a business request input interface, an event information input interface, an interface for outputting trafficability detecting results, and an executing event output interface. The computer associated event executing control system of the utility model overcomes the defects of the prior art, such as low efficiency of the control mode and inflexible control, and reduces the frequency of the computer system connecting with the database while the computer system processes associated events.
Description
Technical field
The utility model particularly about the treatment technology of correlating event, is a kind of computer association incident executive control system about data processing technique concretely.
Background technology
Constantly perfect along with infotech, all trades and professions all generally the technology of using a computer come the data in the process for producing business process.When deal with data, can relate to considerable judgment processing usually with correlating event of mutual restriction relation.Wherein, the mutual restriction of correlating event relation depends on such as the execution of incident A whether incident B and incident C accomplish, and the execution of incident B depends on whether incident B1 has accomplished, and the execution of incident C depends on then whether incident C1 accomplishes.When for example the technology of using a computer is handled the refund data in financial industry, need to judge the restricting relation of the multiple refund incident (as give back debit interest in the table, give back off-balancesheet debit interest etc.) and a refund amount of money, thereby determine whether this loan can refund.And for example: during with computer technology control production line; Need to judge whether each product can carry out certain one in the countless procedures; All sequencing can be arranged between each procedure, the priority of some operation adjusts according to the actual conditions needs so that preferential the completion.
Mainly carry out when handling in the prior art: when whether the decision event A of system can carry out through following mode such as above-mentioned correlating event; Need to connect database and obtain the incident that all are associated with incident A; And whether the treatment state of judging the incident B that priority ratio incident A in this incident is high is to accomplish; If for accomplishing, then allow incident A to carry out; Otherwise refusal incident A carries out, thereby at this moment if the incident of completion B can carry out incident A, needs to start the treatment scheme whether decision event B can carry out, and repeats above-mentioned steps.When each incident all also has other correlating events, then need constantly to repeat above-mentioned steps.。Mainly there is following problem in the mode of above-mentioned processing events:
(1), treatment effeciency is low.During incident of the every processing of above-mentioned mode, all need accessing database to obtain the treatment state of the variety of event that is associated with this incident, the number of times that is connected with database in the processing procedure is various.When a large amount of correlating event of batch processing, need be connected more number of times with database, therefore, and the time of labor and system resource, the efficient that causes carrying out is low.
(2), control is dumb.In the above-mentioned processing mode, be the priority of incident when changing when the shut sequence of variety of event changes, system need remodify whole data.And the judgment processing of incident with mutual restriction relation is generally all very complicated; The error of any step all can cause final processing to make mistakes, therefore, and when the priority of incident changes; System needs the time of labor and resource to remodify data, can not realize flexible control.
The utility model content
The utility model embodiment provides a kind of computer association incident executive control system; Obtain and professional all relevant correlating events according to service request; According to the execution of the completion status of all correlating events, priority control correlating event, solved control mode efficient of the prior art low, control inflexible problem.
The purpose of the utility model is, a kind of computer association incident executive control system is provided, and comprising: client terminal, Control Server, execution server, and described client terminal is connected with described Control Server through the internet; Described Control Server is connected with described execution server through the internet;
Described Control Server comprises: the service request input interface is connected with described client terminal; The event information input interface is connected with described execution server; Trafficability characteristic testing result output interface is connected with described event information input interface; Execution incident output interface is connected with described trafficability characteristic testing result output interface; Described execution server is connected with described Control Server through the internet.
Wherein, described trafficability characteristic testing result output interface comprises: desire is carried out the incident output interface, is connected with described event information input interface; The completion status pick-up unit is carried out the incident output interface with described desire and is connected; The priority pick-up unit is connected with described completion status pick-up unit; The testing result output interface is connected with described priority pick-up unit.
Wherein, described completion status pick-up unit comprises: completion status is confirmed device, carries out the incident output interface with described desire and is connected; The described first testing result device confirms that with described completion status device is connected; The described second testing result device confirms that with described completion status device is connected.
Wherein, described priority pick-up unit comprises: priority is confirmed device, carries out the incident output interface with described desire and is connected; Described the 3rd testing result device confirms that with described priority device is connected; Described the 4th testing result device confirms that with described priority device is connected.
A kind of computer association incident executive control system of the utility model embodiment; Obtain and professional all relevant correlating events according to service request, according to the completion status of all correlating events, the execution that priority is controlled correlating event, solved control mode efficient of the prior art low, control inflexible problem; When having reduced the computer system processor correlating event with the number of times that is connected of database; Improved treatment effeciency, discharged system resource, and improved dirigibility the adjustment of correlating event priority to correlating event; Reduce the complexity of system handles, improved the accuracy of data processing.
Description of drawings
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art; To do to introduce simply to the accompanying drawing of required use in embodiment or the description of the Prior Art below; Obviously, the accompanying drawing in describing below only is some embodiment of the utility model, for those of ordinary skills; Under the prerequisite of not paying creative work property, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the connection synoptic diagram of a kind of computer association incident executive control system of the utility model embodiment;
Fig. 2 is the structured flowchart of a kind of computer association incident executive control system of the utility model embodiment;
Fig. 3 is the structured flowchart of the trafficability characteristic testing result output interface among Fig. 2;
Fig. 4 is the structured flowchart of the completion status pick-up unit among Fig. 3;
Fig. 5 is the structured flowchart of the priority pick-up unit among Fig. 3;
Fig. 6 is the workflow diagram of the completion status pick-up unit among Fig. 3;
Fig. 7 is the workflow diagram of the priority pick-up unit among Fig. 3;
Structured flowchart when Fig. 8 handles bank's refund incident for a kind of computer association incident executive control system of utilization the utility model embodiment;
Fig. 9 is through the matrix table after presetting when handling bank's refund incident;
Figure 10 is the matrix table that obtains after the priority correction according to all correlating events when handling bank's refund incident among the utility model embodiment;
Figure 11 is the matrix table that obtains after the completion status correction according to all correlating events when handling bank's refund incident among the utility model embodiment.
Embodiment
To combine the accompanying drawing among the utility model embodiment below, the technical scheme among the utility model embodiment is carried out clear, intactly description, obviously, described embodiment only is the utility model part embodiment, rather than whole embodiment.Based on the embodiment in the utility model, those of ordinary skills are not making the every other embodiment that is obtained under the creative work prerequisite, all belong to the scope of the utility model protection.
Fig. 1 is the connection synoptic diagram of a kind of computer association incident executive control system of providing of the utility model embodiment; Can know by Fig. 1; This system comprises: client terminal 100, Control Server 200, execution server 300, and described client terminal 100 is connected with described Control Server 00 through the internet; Described Control Server 200 is connected with described execution server 300 through the internet.
Fig. 2 is the structured flowchart of a kind of computer association incident executive control system of providing of the utility model embodiment; Can know by Fig. 2; Described execution server 300 is set up mapping relations professional and incident, sets up the mapping relations of sign, completion status and the priority of said incident.Such as: when in financial industry, handling correlating event with computer technology, set up reimbursement business and incident mapping relations, set up the mapping relations of loan transaction and incident etc.; When the active computer technology is controlled the correlating event on the production line, be established as the mapping relations of certain specific products business of binding and incident etc., different service is corresponding with a series of different events.The priority of each incident is used to characterize the priority size of different events.The completion status of each incident is used to the performance of the incident that characterizes.In concrete embodiment, can represent that this incident accomplishes with 0, represent that with 1 this incident do not accomplish.Preferably, can come the completion status of presentation of events with Percent Complete, when the incident Percent Complete was 100%, the presentation of events executed finished, when the incident Percent Complete less than 100% the time, presentation of events is not accomplished.
Described client terminal 100 is gathered the service request that the user imports, and described service request is uploaded to described Control Server through the internet.Such as: when in financial industry, handling correlating event with computer technology, user's reimbursement business request, loan transaction request etc.; During correlating event on the active computer technology control production line, the service request of binding for certain specific products etc.
Described Control Server 200 comprises:
Service request input interface 201 is connected with described client terminal, receives the service request that described client terminal is uploaded through the internet.Such as: when in financial industry, handling correlating event with computer technology, user's reimbursement business request, loan transaction request etc.; During correlating event on the active computer technology control production line, the service request of binding for certain specific products etc.
Event information input interface 202 is connected with described execution server, receives all correlating events corresponding with said business that described execution server uploads, sign, completion status and the priority of each correlating event through the internet;
Trafficability characteristic testing result output interface 203; Be connected with described event information input interface; According to said professional all corresponding correlating events, sign, completion status and the priority of each correlating event each correlating event is carried out the trafficability characteristic detection, and output comprises the detection result sets of trafficability characteristic testing result.
Execution incident output interface 204; Be connected with described trafficability characteristic testing result output interface; Confirm that each concentrated trafficability characteristic testing result of said testing result is the correlating event of success, with the execution incident of this correlating event as correspondence, and exports described execution incident;
Described execution server 300 is connected with described Control Server through the internet, receives and the corresponding execution incident of described service request, and carries out the execution incident of described correspondence.
Fig. 3 is the structural representation of trafficability characteristic testing result output interface, can be known by Fig. 3, and described trafficability characteristic testing result output interface comprises:
Desire is carried out incident output interface 2031, is connected with described event information input interface, from all corresponding correlating events of described service request, extract each incident successively and carry out incident as the desire of correspondence, and the corresponding desire of output is carried out incident;
Completion status pick-up unit 2032 is carried out the incident output interface with described desire and is connected, and each correlating event of desire being carried out in incident and described all correlating events according to the completion status of described all correlating events carries out the trafficability characteristic detection;
Priority pick-up unit 2033 is connected with described completion status pick-up unit, and each correlating event of desire being carried out in incident and described all correlating events according to the priority of said all correlating events carries out the trafficability characteristic detection;
Testing result output interface 2034 is connected with described priority pick-up unit, and the desire that generates said correspondence is carried out the detection result sets that comprises the trafficability characteristic testing result of incident, and output comprises the detection result sets of trafficability characteristic testing result.
In the utility model embodiment; From described all correlating events, extract each incident successively and carry out incident as the desire of correspondence; And each correlating event that the desire of described correspondence is carried out in incident and described all correlating events carries out the trafficability characteristic detection; When output comprises the detection result sets of trafficability characteristic testing result; Each correlating event of at first according to the completion status of described all correlating events desire being carried out in incident and described all correlating events carries out the trafficability characteristic detection; Each correlating event of according to the priority of said all correlating events desire being carried out in incident and described all correlating events then carries out the trafficability characteristic detection; Also can carry out each correlating event of desire being carried out in incident and described all correlating events according to the priority of said all correlating events earlier and carry out the trafficability characteristic detection, carry out each correlating event of desire being carried out in incident and described all correlating events according to the completion status of described all correlating events then and carry out the trafficability characteristic detection.
Fig. 4 is the structured flowchart of the completion status pick-up unit among the utility model embodiment, can be known by Fig. 4, and described completion status pick-up unit comprises:
Completion status is confirmed device 20321; Carrying out the incident output interface with described desire is connected; Whether the completion status of confirming a correlating event in described all correlating events for accomplishing, when confirming as when being, changes the first testing result device over to; When confirming as not, change the second testing result device over to;
The described first testing result device 20322 confirms that with described completion status device is connected, and generating the described desire execution trafficability characteristic testing result corresponding with sign this correlating event incident is successful testing result;
The described second testing result device 20323 confirms that with described completion status device is connected, and generates said desire and carries out trafficability characteristic testing result the testing result for fail corresponding with sign this correlating event incident.
Fig. 6 is the workflow diagram of completion status pick-up unit 2032, can be known by Fig. 6, and this flow process is specially:
S4031: from all corresponding correlating events of described service request, extract an incident and carry out incident as the desire of correspondence;
S4032: from all corresponding correlating events of described service request, extract a correlating event;
S4033: whether the completion status of a correlating event of judging described extraction for accomplishing, when being judged as when being, and execution in step S4034, otherwise, execution in step S4035;
S4034: generating the described desire execution trafficability characteristic testing result corresponding with sign this correlating event incident is successful testing result;
S4035: generate described desire and carry out trafficability characteristic testing result the testing result for fail corresponding incident with sign this correlating event;
S4036: whether a correlating event judging described extraction is last in all correlating events, when being judged as not, returns execution in step S4032, otherwise, execution in step S4037;
S4037: judge whether desire is carried out incident is last in all corresponding correlating events of said service request, when being judged as not, execution in step S4031, otherwise this step finishes.
Fig. 5 is the structured flowchart of the priority pick-up unit among the utility model embodiment, can know that by figure described priority pick-up unit 2033 comprises:
Priority is confirmed device 20331; Carrying out the incident output interface with described desire is connected; Whether confirm priority that said desire carries out incident less than a correlating event corresponding priorities in all correlating events,, change the 3rd testing result device over to when confirming as when being; When confirming as not, change the 4th testing result device over to;
Described the 3rd testing result device 20332 confirms that with described priority device is connected, and generates said desire and carries out trafficability characteristic testing result the testing result for fail corresponding with sign this correlating event incident;
Described the 4th testing result device 20333 confirms that with described priority device is connected, and generating the said desire execution trafficability characteristic testing result corresponding with sign this correlating event incident is successful testing result.
Fig. 7 is the workflow diagram of the priority pick-up unit 2033 among the utility model embodiment, can be known by Fig. 7, and this flow process is specially:
S4041: from all corresponding correlating events of described service request, extract an incident and carry out incident as the desire of correspondence;
S4042: from all corresponding correlating events of described service request, extract a correlating event;
S4043: judge priority that described desire carries out incident whether less than the priority of a correlating event of described extraction, when being judged as when being, execution in step S4045, otherwise, execution in step S4044;
S4044: generating the described desire execution trafficability characteristic testing result corresponding with sign this correlating event incident is successful testing result;
S4045: generate described desire and carry out trafficability characteristic testing result the testing result for fail corresponding incident with sign this correlating event;
S4046: whether a correlating event judging described extraction is last in all correlating events, when being judged as not, returns execution in step S4042, otherwise, execution in step S4047;
S4047: judge whether desire is carried out incident is last in all corresponding correlating events of said service request, when being judged as not, execution in step S4041, otherwise this step finishes.
In other embodiments of the utility model, trafficability characteristic testing result output interface can be realized through following matrix-style, also can realize through other modes such as similar forms certainly, only is that example is explained with the matrix here.
S41: the matrix table that generates number * number according to the number of all corresponding correlating events of described service request.For example the corresponding correlating event of certain service request is masked as incident 1, incident 2, incident 3, incident 4, and promptly the number of the correlating event of this service requesting information correspondence is 4, then generates following matrix table:
In this matrix table; The incident that the representations of events of vertical Y need be handled; The incident that the representations of events of horizontal X is associated with incident Y, X is a checkmark with the position that Y intersects, and is used to promptly represent that horizontal X incident is to whether the Y incident is influential longitudinally; As influential, show that then must execute incident X earlier could carry out incident Y.
S42: the checkmark of described matrix table is predisposed to do not pass through.If preestablish 0 for passing through, 1 for not passing through, and then the checkmark in the matrix table is predisposed to 1, generates following matrix table:
S43: according to the checkmark of the completion status correction matrix table of described each correlating event, promptly when the completion status of correlating event for imperfect tense, this correlating event is belonged to the checkmark that is listed as be modified to and do not pass through in matrix table; When the completion status of incident when accomplishing, this incident is belonged to row in matrix table checkmark be modified to through.
S44: according to the checkmark of the priority correction matrix table of described each correlating event; The priority of the incident of promptly being expert at when checkmark is during more than or equal to the priority of the incident of these checkmark place row; With this checkmark be modified to through; The priority of the incident of being expert at when checkmark is during less than the priority of the incident of these checkmark place row, this checkmark is modified to do not pass through.
A kind of Computer Processing correlating event executive control system that below the utility model embodiment is provided is used in the financial field; Such as being used in banking system when handling the reimbursement business to the public affairs loan; All correlating events relevant with reimbursement business according to user's reimbursement business acquisition request; According to the completion status of all correlating events, the execution of priority control correlating event; Both can control and to have carried out other a kind of refund type after certain refund type must be finished, and also can control some refund type and can carry out simultaneously, reduce the number of times that is connected with database; Improve the treatment effeciency of refund incident, also improved the dirigibility that various refund incident execution sequences are adjusted.
Fig. 8 is the system chart that bank's refund correlating event is carried out control, can be known that by Fig. 8 this system comprises: client terminal 10, Control Server 20, banking system 30.Client terminal 10 is used to receive the service request that the user sends, and described service request is transmitted through the internet, is user's the refund request to the public affairs loan in the present embodiment.
Banking system 30 is used to set up mapping relations professional and incident, and sets up the mapping relations of sign, completion status and the priority of said incident.In this embodiment; The corresponding incident of refund request to the public affairs loan comprises 8, is respectively: give back normal capital, give back normal capital interest, give back debit interest in the table, give back debit interest interest in the table, give back the off-balancesheet debit interest, give back off-balancesheet debit interest interest, give back the capital that exceeds the time limit, give back the capital interest of exceeding the time limit.Processing sequence to 8 corresponding incidents of the refund request of public affairs loan: give back the capital that exceeds the time limit, give back debit interest in the table, give back the capital interest of exceeding the time limit, give back debit interest interest in the table, give back the off-balancesheet debit interest, give back off-balancesheet debit interest interest, give back normal capital, give back normal capital interest; Wherein give back debit interest and give back the capital interest of exceeding the time limit and to carry out simultaneously in the table; Both priority equate; Give back in the table debit interest interest and give back the off-balancesheet debit interest and can carry out simultaneously, both priority equate.Therefore; It is 1 that the priority of 8 incidents is respectively the priority of giving back the capital that exceeds the time limit; Giving back the priority of showing interior debit interest and giving back the capital interest of exceeding the time limit is 2, and giving back the interior debit interest interest of table is 3 with the priority of giving back the off-balancesheet debit interest, and the priority of giving back off-balancesheet debit interest interest is 4; The priority of giving back normal capital is 5, and the priority of giving back normal capital interest is 6.In this embodiment, the completion status of 8 corresponding incidents of the refund request of public affairs loans is generated by what of amount owed, amount owed is 0, shows that then this event handling finishes, the completion status of using 0 this incident of expression is for accomplish; If amount owed is not 0, show then that this incident still is untreated to finish, represent that with 1 this incident do not accomplish.In this embodiment; The amount owed of 8 incidents is respectively: give back 50 yuan of normal capitals, give back 30 yuan of normal capital interests, give back 20 yuan of debit interests in the table, give back 10 yuan of debit interest interests in the table, give back 0 yuan of off-balancesheet debit interest, give back 100 yuan of off-balancesheet debit interest interests, give back 0 yuan of the capital that exceeds the time limit, give back 40 yuan of the capital interests of exceeding the time limit, then corresponding completion status is respectively gives back normal capital and does not accomplish, gives back normal capital interest and do not accomplish, give back in the table debit interest and do not accomplish, give back in the table debit interest interest and do not accomplish, give back the off-balancesheet debit interest and accomplish, give back off-balancesheet debit interest interest and do not accomplish, give back the capital that exceeds the time limit and accomplish, give back the capital interest of exceeding the time limit and do not accomplish.
Service request input interface 201 is connected with described client terminal, receives the service request that described client terminal is uploaded through the internet.Be user's refund request in the present embodiment to the public affairs loan.
Event information input interface 202 is connected with described execution server, receives all correlating events corresponding with said business that described execution server uploads, sign, completion status and the priority of each correlating event through the internet.In this embodiment, the completion status of 8 incidents, priority are stored as follows:
The output of trafficability characteristic testing result connects 203; Be connected with described event information input interface; According to said professional all corresponding correlating events, sign, completion status and the priority of each correlating event each correlating event is carried out the trafficability characteristic detection, and output comprises the detection result sets of trafficability characteristic testing result.In this embodiment, also be that example describes with the matrix.At first, the checkmark of described matrix table is predisposed to does not pass through.In this embodiment, to 8 incidents should be arranged, the matrix table after presetting is as shown in Figure 9 to the refund request of public affairs loans.
Secondly, according to the checkmark of the priority correction matrix table of described each incident.In this embodiment, be specially:
(1), for the 1st row, the priority of giving back normal capital is greater than giving back normal capital interest, is that the checkmark of (1,1), (1,2) is changed to 0 with coordinate then;
(2), for the 2nd row, the priority of giving back normal capital interest is minimum, is that the checkmark of (2,2) is changed to 0 with coordinate then;
(3), for the 3rd row, the priority of giving back debit interest in the table equates greater than giving back debit interest interest in the table, give back the off-balancesheet debit interest, give back off-balancesheet debit interest interest, give back normal capital, give back normal capital interest and giving back the capital interest of exceeding the time limit; Be (3,1), (3,2), (3 then with coordinate; 3), (3,4), (3,5), (3; 6), the checkmark of (3,8) is changed to 0;
(4), for the 4th row, the priority of giving back debit interest interest in the table equates greater than giving back off-balancesheet debit interest interest, give back normal capital, give back normal capital interest and giving back the off-balancesheet debit interest; Be (4,1), (4,2), (4 then with coordinate; 4), the checkmark of (4,5), (4,6) is changed to 0;
(5), for the 5th row, the priority of giving back the off-balancesheet debit interest is greater than giving back off-balancesheet debit interest interest, give back normal capital, give back normal capital interest and giving back that the debit interest interest equates in the table; Be (5,1), (5,2), (5 then with coordinate; 4), the checkmark of (5,5), (5,6) is changed to 0;
(6), for the 6th row, the priority of giving back off-balancesheet debit interest interest is greater than giving back normal capital, giving back normal capital interest, is that the checkmark of (6,1), (6,2), (6,6) is changed to 0 with coordinate then;
(7), for the 7th row, the priority of giving back the capital that exceeds the time limit is maximum, is that the checkmark of (7,1), (7,2), (7,3), (7,4), (7,5), (7,6), (7,7), (7,8) is changed to 0 with coordinate then;
(8), for eighth row, the priority of giving back the capital interest of exceeding the time limit is greater than giving back debit interest interest in the table, give back the off-balancesheet debit interest, give back off-balancesheet debit interest interest, give back normal capital, give back normal capital interest and giving back that debit interest equates in the table; Be (8,1), (8,2), (8 then with coordinate; 3), (8,4), (8,5), (8; 6), the checkmark of (8,8) is changed to 0.
The matrix table that obtains behind the checkmark according to the priority correction matrix table of described each incident is shown in figure 10.
Then, the checkmark according to the completion status correction matrix table of described each incident is specially in this embodiment:
In this embodiment; The debt of only give back the off-balancesheet debit interest in 8 incidents, giving back the capital that exceeds the time limit is complete restitution; Amount owed is 0; Then the completion status of this two incident is for accomplish, and the checkmark of then will give back the off-balancesheet debit interest, giving back the 5th, 7 row at the capital place of exceeding the time limit is changed to 0, and the matrix table that obtains at last is shown in figure 11.
Execution incident output interface 204; Be connected with described trafficability characteristic testing result output interface; Confirm that each concentrated trafficability characteristic testing result of said testing result is the correlating event of success, with the execution incident of this correlating event as correspondence, and exports described execution incident.By shown in Figure 11; In this embodiment, the checkmark that each incident is expert at is respectively: give back normal capital [00110101], give back normal capital interest [10110101], give back debit interest [00000000] in the table, give back debit interest interest [00100001] in the table, give back off-balancesheet debit interest [00100001], give back off-balancesheet debit interest interest [00110001], give back the capital that exceeds the time limit [00000000], give back the capital interest [00000000] of exceeding the time limit.In this embodiment, therefore debit interest interest, off-balancesheet debit interest interest, the capital interest of exceeding the time limit in debit interest in the existence table, the table are given back normal capital failure and are looked into; Existence is given back normal capital, gives back debit interest in the table, gives back debit interest interest in the table, gives back off-balancesheet debit interest interest, is given back the capital interest of exceeding the time limit, so gives back normal capital interest failure; Give back debit interest success in the table; Existence is given back debit interest in the table, is given back the capital interest of exceeding the time limit, and therefore gives back table interior debit interest interest failure; Existence is given back debit interest in the table, is given back the capital interest of exceeding the time limit, and therefore gives back off-balancesheet debit interest failure; Existence is given back debit interest in the table, gives back the capital interest of exceeding the time limit, is given back debit interest interest in the table, so gives back the failure of off-balancesheet debit interest interest; Give back the capital success that exceeds the time limit, give back the capital interest success that exceeds the time limit.Therefore, the executable desire execution incident of determining is: give back debit interest in the table, give back the capital that exceeds the time limit, give back the capital interest of exceeding the time limit.In this embodiment; The object information of incident through inspection is not transferred to accepting terminal; To transfer to banking system through the object information of incident of inspection; As: to client terminal 10 transmit " debit interest interest, off-balancesheet debit interest interest, the capital interest of exceeding the time limit in the debit interest existence table in, the table are given back normal capital and are passed through to check, can not carry out and give back operation; Send to banking system 30 and to give back the object information of the capital that exceeds the time limit through inspection, by the banking system accounting processing of refunding.
Described banking system 30 also is used to carry out the desire execution incident that each concentrated trafficability characteristic testing result of testing result is success.In this embodiment, banking system can be carried out and give back debit interest in the table, gives back the capital that exceeds the time limit, given back the capital interest of exceeding the time limit.
A kind of computer association incident executive control system of the utility model embodiment; Obtain and professional all relevant correlating events according to service request, according to the completion status of all correlating events, the execution that priority is controlled correlating event, solved control mode efficient of the prior art low, control inflexible problem; When having reduced the computer system processor correlating event with the number of times that is connected of database; Improved treatment effeciency, discharged system resource, and improved dirigibility the adjustment of correlating event priority to correlating event; Reduce the complexity of system handles, improved the accuracy of data processing.
Used specific embodiment in the utility model the principle and the embodiment of the utility model are set forth, the explanation of above embodiment just is used to help to understand the method and the core concept thereof of the utility model; Simultaneously, for one of ordinary skill in the art, according to the thought of the utility model, the part that on embodiment and range of application, all can change, in sum, this description should not be construed as the restriction to the utility model.
Claims (4)
1. a computer association incident executive control system is characterized in that, described computer association incident executive control system comprises: client terminal, Control Server, execution server,
Described client terminal is connected with described Control Server through the internet;
Described Control Server is connected with described execution server through the internet;
Described Control Server comprises:
The service request input interface is connected with described client terminal;
The event information input interface is connected with described execution server;
Trafficability characteristic testing result output interface is connected with described event information input interface;
Execution incident output interface is connected with described trafficability characteristic testing result output interface;
Described execution server is connected with described Control Server through the internet.
2. computer association incident executive control system according to claim 1 is characterized in that, described trafficability characteristic testing result output interface comprises:
Desire is carried out the incident output interface, is connected with described event information input interface;
The completion status pick-up unit is carried out the incident output interface with described desire and is connected;
The priority pick-up unit, survey is connected with described completion status pick-up unit;
The testing result output interface is connected with described priority pick-up unit.
3. computer association incident executive control system according to claim 2 is characterized in that, described completion status pick-up unit comprises:
Completion status is confirmed device, carries out the incident output interface with described desire and is connected;
The described first testing result device confirms that with described completion status device is connected;
The described second testing result device confirms that with described completion status device is connected.
4. computer association incident executive control system according to claim 2 is characterized in that, described priority pick-up unit comprises:
Priority is confirmed device, carries out the incident output interface with described desire and is connected;
Described the 3rd testing result device confirms that with described priority device is connected;
Described the 4th testing result device confirms that with described priority device is connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201260455U CN202230327U (en) | 2011-04-26 | 2011-04-26 | Computer associated event executing control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201260455U CN202230327U (en) | 2011-04-26 | 2011-04-26 | Computer associated event executing control system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202230327U true CN202230327U (en) | 2012-05-23 |
Family
ID=46080909
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201260455U Expired - Lifetime CN202230327U (en) | 2011-04-26 | 2011-04-26 | Computer associated event executing control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202230327U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110069042A (en) * | 2019-03-15 | 2019-07-30 | 中车工业研究院有限公司 | Control method, device, software systems and the control system of production procedure process |
-
2011
- 2011-04-26 CN CN2011201260455U patent/CN202230327U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110069042A (en) * | 2019-03-15 | 2019-07-30 | 中车工业研究院有限公司 | Control method, device, software systems and the control system of production procedure process |
CN110069042B (en) * | 2019-03-15 | 2020-09-01 | 中车工业研究院有限公司 | Production flow process control method, device, software system and control system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111340614B (en) | Sample sampling method and device based on federal learning and readable storage medium | |
CN108038776A (en) | A kind of data processing method and data processing terminal | |
CN110717671A (en) | Method and device for determining contribution degree of participants | |
CN110766167B (en) | Interactive feature selection method, device and readable storage medium | |
CN110458674A (en) | A kind of method and system generating bookkeeping voucher | |
CN106384280B (en) | Artificial intelligence accounting system and calculation method thereof | |
EP2672437A1 (en) | Systems and methods for context understanding for developing a software solution for a project | |
CN107301601A (en) | The system and method for supply chain financial platform | |
CN107249182A (en) | A kind of note transmission method and its device, terminal device | |
CN106470200A (en) | A kind of auth method and relevant apparatus | |
CN108055167B (en) | Application-oriented interface communication protocol modeling method and device | |
CN106910065A (en) | Data processing method, the apparatus and system of the settlement of exchange amount of money are calculated based on many transactions | |
CN105741042A (en) | Automatic learning method for open approving workflow | |
CN106897988A (en) | Unimolecule image correction system | |
CN202230327U (en) | Computer associated event executing control system | |
CN102183923B (en) | Computer related event executing control method and system | |
CN114971017A (en) | Bank transaction data processing method and device | |
CN114202018A (en) | Modular joint learning method and system | |
CN106557921A (en) | On-line payment method and device | |
CN109828801A (en) | Business information processing method, device and server | |
CN103873264A (en) | Settlement engine of integrated services under convergent networks | |
CN101471890B (en) | Method and system for implementing network information matching | |
CN110084701A (en) | Financing platform enters method, apparatus, computer equipment and storage medium | |
CN105373498B (en) | A kind of data handling system and method | |
CN116226116A (en) | Joint learning task viewing method and device, electronic equipment and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20120523 |
|
CX01 | Expiry of patent term |