CN202227697U - Device for forming concrete - Google Patents
Device for forming concrete Download PDFInfo
- Publication number
- CN202227697U CN202227697U CN2011202078341U CN201120207834U CN202227697U CN 202227697 U CN202227697 U CN 202227697U CN 2011202078341 U CN2011202078341 U CN 2011202078341U CN 201120207834 U CN201120207834 U CN 201120207834U CN 202227697 U CN202227697 U CN 202227697U
- Authority
- CN
- China
- Prior art keywords
- template
- adjustment component
- spring
- utility
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model provides a device for forming concrete, comprising a first template, a second template, a first adjusting component, a second adjusting component, a first spring and a second spring. The first adjusting component is arranged at first ends of the first template and the second template; the second adjusting component is arranged at second ends of the first template and the second template, wherein scales are respectively arranged on the first adjusting component and the second adjusting component, and used for indicating the distance between the first template and the second template when the first and second adjusting components are used for adjusting; the first spring is arranged at the first ends of the first template and the second template; the second spring is arranged at the second ends of the first template and the second template, wherein the first spring and the second spring are positioned between the first template and the second template, and the lengths of the first spring and the second spring when not being pressed are greater than the distance between the first template and the second template. Due to the scheme, when the concrete is formed, the distance between the templates can be adjusted more easily and accurately.
Description
Technical field
The utility model relates to a kind of construction formwork, particularly relates to a kind of device that is used to use concrete forming.
Background technology
In the prior art, make concrete forming, for example, adopt the concrete casting casting method to make the wall of building in order to use construction formwork usually.
Conventional construction formwork is generally processed by steel plate independently; Before carrying out concrete forming; Usually supporter or the clip processed with various materials fix two distances between the template, and shortcoming is that the process of support or fixed form is loaded down with trivial details, are not easy accurately to confirm distance between two templates.
The utility model content
To above-mentioned prior art problems, the utility model provides a kind of device that is used to make concrete forming, can make that the concrete forming process is simpler, and can accurately confirm two distances between the template.
According to the one side of the utility model, a kind of device that is used to make concrete forming is provided, comprising: first template; Second template, itself and the first template positioned opposite; At least one first adjustment component, first end that it is disposed in said first template and said second template is used to adjust the distance between said first template and said second template; At least one second adjustment component; It is disposed in second end of said first template and said second template; Be used to adjust the distance between said first template and said second template; Wherein said at least one first adjustment component and said at least one second adjustment component respectively are provided with scale, are used to indicate the distance between said first template and said second template; At least one first spring; It is disposed in first end of said first template and said second template; And between said first template and said second template, wherein said first spring not the length during pressurized greater than the distance between said first template and said second template; And at least one second spring; It is disposed in second end of said first template and said second template; And between said first template and said second template, wherein said second spring not the length during pressurized greater than the distance between said first template and said second template.
According to the utility model on the other hand, said at least one first adjustment component can be made up of screw rod and nut, and said at least one second adjustment component can be made up of screw rod and nut, and said scale can be marked on the said screw rod.
According to the utility model on the other hand; The said device that is used to make concrete forming; Further comprise: first baffle plate, first end of said first baffle plate is arranged on first end of said first template, and second end of said first baffle plate is arranged on first end of said second template; And second baffle, first end of said second baffle is arranged on second end of said first template, and second end of said second baffle is arranged on second end of said second template.
According to the utility model on the other hand, said first baffle plate and said second baffle can be processed by the material of softness.
According to the utility model on the other hand, said at least one first adjustment component can be passed said at least one first spring respectively, and said at least one second adjustment component can be passed said at least one second spring respectively.
According to the utility model on the other hand, said first template and said second template can respectively be the combination of any or they in metal sheet, plank or the composite panel.
The device that is used to make concrete forming through the utility model provides when concrete forming, can make things convenient for, accurately adjust the distance between the template.
To above-mentioned prior art problems, the utility model provides a kind of device that is used to make concrete forming, can make that the concrete forming process is simpler, and can accurately confirm two distances between the template.
According to the one side of the utility model, a kind of device that is used to make concrete forming is provided, comprising: first template; Second template, itself and the first template positioned opposite; At least one first adjustment component, first end that it is disposed in said first template and said second template is used to adjust the distance between said first template and said second template; At least one second adjustment component; It is disposed in second end of said first template and said second template; Be used to adjust the distance between said first template and said second template; Wherein said at least one first adjustment component and said at least one second adjustment component respectively are provided with scale, are used to indicate the distance between said first template and said second template; At least one first spring; It is disposed in first end of said first template and said second template; And between said first template and said second template, wherein said first spring not the length during pressurized greater than the distance between said first template and said second template; And at least one second spring; It is disposed in second end of said first template and said second template; And between said first template and said second template, wherein said second spring not the length during pressurized greater than the distance between said first template and said second template.
According to the utility model on the other hand, said at least one first adjustment component can be made up of screw rod and nut, and said at least one second adjustment component can be made up of screw rod and nut, and said scale can be marked on the said screw rod.
According to the utility model on the other hand; The said device that is used to make concrete forming; Further comprise: first baffle plate, first end of said first baffle plate is arranged on first end of said first template, and second end of said first baffle plate is arranged on first end of said second template; And second baffle, first end of said second baffle is arranged on second end of said first template, and second end of said second baffle is arranged on second end of said second template.
According to the utility model on the other hand, said first baffle plate and said second baffle can be processed by the material of softness.
According to the utility model on the other hand, said at least one first adjustment component can be passed said at least one first spring respectively, and said at least one second adjustment component can be passed said at least one second spring respectively.
According to the utility model on the other hand, said first template and said second template can respectively be the combination of any or they in metal sheet, plank or the composite panel.
The device that is used to make concrete forming through the utility model provides when concrete forming, can utilize adjustment component conveniently, accurately to adjust the distance between the template under the support of the spring between the template.
Description of drawings
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art; Below will do to introduce simply to the accompanying drawing of required use in embodiment or the description of the Prior Art; Obviously, the accompanying drawing in below describing only is some embodiment of the utility model, for those of ordinary skills; Under the prerequisite of not paying creative work, can also obtain other embodiment and accompanying drawing thereof according to these accompanying drawing illustrated embodiments.
Fig. 1 shows the phantom drawing of device that is used to make concrete forming according to the utility model embodiment;
Fig. 2 shows the sketch map according to the adjustment component of the utility model embodiment;
Fig. 3 illustrates the elevation of device that is used to make concrete forming according to the utility model embodiment;
Fig. 4 illustrates the vertical view of device that is used to make concrete forming according to the utility model embodiment; And
Fig. 5 illustrates the lateral view of device that is used to make concrete forming according to the utility model embodiment
The specific embodiment
Below will combine accompanying drawing that the technical scheme of each embodiment of the utility model is carried out clear, complete description, obviously, described embodiment only is a part of embodiment of the utility model, rather than whole embodiment.Based on the embodiment in the utility model, those of ordinary skills are resulting all other embodiment under the prerequisite of not making creative work, all belong to the scope that the utility model is protected.
The device that is used to make concrete forming that the utility model provides; Use spring to support two templates; And (for example use adjustment component; The nut of band nut) adjusts two distances between the template, make that the concrete forming process is simpler, and can accurately confirm two distances between the template.
More than be the general plotting of the utility model, describe the embodiment of the utility model below in conjunction with accompanying drawing in more detail.
Fig. 1 shows the phantom drawing of device 10 that is used to make concrete forming according to the utility model embodiment; Fig. 3 illustrates the elevation of device 10 that is used to make concrete forming according to the utility model embodiment; Fig. 4 illustrates the vertical view of device 10 that is used to make concrete forming according to the utility model embodiment; And Fig. 5 illustrates the lateral view of device 10 that is used to make concrete forming according to the utility model embodiment.
Referring to Fig. 1, Fig. 3, Fig. 4 and Fig. 5, comprise: first template 11, second template 12, at least one first adjustment component 13, at least one second adjustment component 14, at least one first spring 17 and at least one second spring 18 according to the device 10 of the utility model embodiment.
First adjustment component 13 (for example, having illustrated two among Fig. 1) is arranged in first end of first template 11 and second template 12, is used to adjust the distance between first template 11 and second template 12.Second adjustment component 14 (for example, having illustrated two among Fig. 1) is arranged in second end of first template 11 and second template 12, is used to adjust the distance between first template 11 and second template 12.First adjustment component 13 and second adjustment component 14 respectively are provided with scale, are used to indicate the distance between first template 11 and second template 12, thereby change the thickness of the concrete structure that forms.According to the embodiment of the utility model, first adjustment component 13 and second adjustment component 14 all can be made up of screw rod and nut, and above-mentioned scale can be marked on the screw rod.
Referring to Fig. 1 and Fig. 3, further comprise according to the device 10 of the embodiment of the utility model: first end of first baffle plate 15 is arranged on first end of first template 11, and its second end is arranged on first end of second template 12.First end of second baffle 16 is arranged on second end of first template 11, and its second end is arranged on second end of second template 12.First baffle plate 15 can be fixed on first template 11 and second template 12 through modes such as buckles with second baffle 16, and the utility model is not limited to this, as long as first baffle plate 15 is arranged by aforesaid mode with second baffle 16.For example; Can be before carrying out concrete forming; And after the distance of adjusting between first template 11 and second template 12; Two suitable baffle plates are inserted between first adjustment component 13 and second adjustment component 14, and place near first adjustment component 13 and second adjustment component 14 respectively, get into first adjustment component 13 and second adjustment component 14 in order to stop concrete.According to the embodiment of the utility model, first baffle plate 15 can be processed by the material (for example, plastics, cloth or paper or the like) of softness with second baffle 16.Because the material of first baffle plate 15 and second baffle 16 is soft, so can adjust the distance between first template and second template arbitrarily.
Referring to Fig. 3; First adjustment component 13 can be passed first spring 17; Second adjustment component 14 can be passed second spring 18, and win spring 17 and second spring 18 are placed between first template and second template reliably, thereby plays the effect of supporting first template 11 and second template 12.Certainly, according to another embodiment of the utility model, first spring 17 also can separate with second adjustment component 14 with first adjustment component 13 with second spring 18, as long as they can place between first template 11 and second template 12 and play a supporting role.
Fig. 2 shows the sketch map according to the adjustment component 13 of the utility model embodiment.Referring to Fig. 2, adjustment component 13 can be made up of screw rod and nut.Different with prior art is; In order when carrying out concrete forming, can accurately to confirm the distance between first template 11 and second template 12; Be marked with scale 19 at screw rod, and the reading of the scale that can move to nut is indicated the distance between first template 11 and second template 12.Adjustment component 14 is identical or similar with adjustment component 13, and is no longer detailed here.
Need to prove that for illustrative purpose, the size that each in the foregoing description formed member is schematically, in practice, can adopt corresponding size as required.When concrete forming is become, according to the utility model embodiment be used to one of two openings of device of concrete forming are placed on will form concrete surface (for example ground or established concrete structure), concrete injects from another opening.According to the embodiment of the utility model be used to make the device of concrete forming freely dismantle or to assemble.
The device that is used to make concrete forming that provides through the utility model; When concrete forming; Can utilize the spring support shuttering that places between the template; And the adjustment component of utilizing the securing member such as screw rod and nut to form is adjusted the distance between the template, thereby conveniently, accurately adjusts the distance between the template.
The various embodiment that the utility model provides can make up with any-mode as required each other, and the technical scheme that obtains through this combination is also in the scope of the utility model.
Obviously, those skilled in the art can carry out various changes and modification to the utility model and not break away from the spirit and the scope of the utility model.Like this, belong within the scope of the utility model claim and equivalent technologies thereof if these of the utility model are revised with modification, then the utility model also comprises these changes and modification interior.
Claims (6)
1. device that is used to use concrete forming, this device comprises:
First template;
Second template, itself and the first template positioned opposite;
At least one first adjustment component, first end that it is disposed in said first template and said second template is used to adjust the distance between said first template and said second template;
At least one second adjustment component; It is disposed in second end of said first template and said second template; Be used to adjust the distance between said first template and said second template; Wherein said at least one first adjustment component and said at least one second adjustment component respectively are provided with scale, are used to indicate the distance between said first template and said second template;
At least one first spring; It is disposed in first end of said first template and said second template; And between said first template and said second template, wherein said first spring not the length during pressurized greater than the distance between said first template and said second template; And
At least one second spring; It is disposed in second end of said first template and said second template; And between said first template and said second template, wherein said second spring not the length during pressurized greater than the distance between said first template and said second template.
2. the device that is used to use concrete forming according to claim 1; Wherein said at least one first adjustment component is made up of screw rod and nut; Said at least one second adjustment component is made up of screw rod and nut, and said graduated scale is on said screw rod.
3. the device that is used to use concrete forming according to claim 1 further comprises:
First baffle plate, first end of said first baffle plate is arranged on first end of said first template, and second end of said first baffle plate is arranged on first end of said second template; And
Second baffle, first end of said second baffle is arranged on second end of said first template, and second end of said second baffle is arranged on second end of said second template.
4. the device that is used to use concrete forming according to claim 2, wherein said first baffle plate and said second baffle are processed by the material of softness.
5. according to each the described device that is used to use concrete forming in the claim 1 to 4; Wherein said at least one first adjustment component is passed said at least one first spring respectively, and said at least one second adjustment component is passed said at least one second spring respectively.
6. according to each the described device that is used to use concrete forming in the claim 1 to 4, wherein said first template and said second template respectively are the combination of any or they in metal sheet, plank or the composite panel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202078341U CN202227697U (en) | 2011-06-20 | 2011-06-20 | Device for forming concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202078341U CN202227697U (en) | 2011-06-20 | 2011-06-20 | Device for forming concrete |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202227697U true CN202227697U (en) | 2012-05-23 |
Family
ID=46078286
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011202078341U Expired - Fee Related CN202227697U (en) | 2011-06-20 | 2011-06-20 | Device for forming concrete |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202227697U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108560579A (en) * | 2018-06-15 | 2018-09-21 | 中国电建集团河南工程有限公司 | The pre-buried parallels construction method of spring |
-
2011
- 2011-06-20 CN CN2011202078341U patent/CN202227697U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108560579A (en) * | 2018-06-15 | 2018-09-21 | 中国电建集团河南工程有限公司 | The pre-buried parallels construction method of spring |
CN108560579B (en) * | 2018-06-15 | 2023-11-10 | 中国电建集团河南工程有限公司 | Spring type pre-buried sizing block construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6412185B1 (en) | Tile laying gauge and leveling assembly | |
WO2016036259A3 (en) | Post support apparatus | |
CN202227697U (en) | Device for forming concrete | |
CN203878990U (en) | Reinforcing device of wooden cylindrical shaping die | |
EP2107180A3 (en) | Prestressed concrete component, suitable for providing outdoor walkable surfaces and for cladding walls, and associated production method | |
CN102116090B (en) | Wall body perpendicularity line hanging instrument | |
CN206397143U (en) | A kind of rapid construction stair template | |
CN202248858U (en) | Structure of building mould plate | |
CN108581311A (en) | A kind of angle adjustable plate docking fixing device | |
CN203696994U (en) | Contour line marking device | |
CN203432829U (en) | Regulating damper structure improved test mold used in masonry brick compressive strength tests | |
CN204269122U (en) | Prefabricated components installation verticality measurement device | |
CN212105167U (en) | Concrete face elevation and roughness controlling means | |
CN203177851U (en) | Inspection tool for inspecting slope of mold plate | |
CN209877983U (en) | Assembled shear force wallboard straightness measuring device that hangs down | |
CN203795854U (en) | Preformed hole formwork fixing device for bare concrete floor | |
CN204346870U (en) | Concrete and concrete impervious multi-functional self-mountable & dismountuble splitting fixture | |
CN207757836U (en) | The positioning device of the exposed muscle of component | |
CN204526612U (en) | The adjustable locate mode drawing board that a kind of art painting is special | |
CA2495955A1 (en) | Cardboard concrete forming system | |
CN208913027U (en) | A kind of reinforcing bar adjuster | |
CN203947773U (en) | A kind of for fixed form to support to draw rod device | |
CN202248774U (en) | Fixing device for waterstone dividing strip | |
CN202461209U (en) | Straightener suitable for steel pipes with different lengths | |
CN209399901U (en) | Superimposed sheet thickness check device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120523 Termination date: 20130620 |