CN202227212U - Novel intersection two-storey whole interchange overpass - Google Patents

Novel intersection two-storey whole interchange overpass Download PDF

Info

Publication number
CN202227212U
CN202227212U CN2011203322969U CN201120332296U CN202227212U CN 202227212 U CN202227212 U CN 202227212U CN 2011203322969 U CN2011203322969 U CN 2011203322969U CN 201120332296 U CN201120332296 U CN 201120332296U CN 202227212 U CN202227212 U CN 202227212U
Authority
CN
China
Prior art keywords
viaduct
arterial highway
trunk road
craspedodrome
intersection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203322969U
Other languages
Chinese (zh)
Inventor
钱红波
韩皓
王正
朱立民
郑子骜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Maritime University
Original Assignee
Shanghai Maritime University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Maritime University filed Critical Shanghai Maritime University
Priority to CN2011203322969U priority Critical patent/CN202227212U/en
Application granted granted Critical
Publication of CN202227212U publication Critical patent/CN202227212U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a novel intersection two-storey whole interchange overpass, which includes a transverse trunk road and a longitudinal trunk road that are arranged on the ground, wherein the transverse trunk road and the longitudinal trunk road are intersected at the intersection part; the transverse trunk road is provided with a two-way straight driveway; the intersection part is provide with a downward penetrating tunnel; the two-way straight driveway penetrates the downward penetrating tunnel; the longitudinal trunk road is provided with a straight overpass, and the straight overpass passes over an intersection pavement and is used for communicating the longitudinal trunk road; the longitudinal trunk road is also provided with a left turning overpass, and the left turning overpass passes over the intersection pavement and is connected with the transverse trunk road; the transverse trunk road is provided with a left turning driveway, and the left turning driveway passes the intersection part and is communicated with the longitudinal trunk road; the two sides of the both the transverse trunk road and the longitudinal trunk road are provided with right turning driveways, and the neighboring right turning driveways are communicated on the edges of the intersection part. By merely utilizing the occupied area of the ordinary crossing plane intersection to construct the two-storey whole interchange overpass, the turning traffic stream can be kept continuous in time and space.

Description

Two layers of full interchange viaduct of crossroads
Technical field
The utility model relates to two layers of full interchange viaduct design scheme of a kind of crossroads, belongs to the traffic design field.
Background technology
Big of the traffic bottlenecks of urban road network concentrate on level-crossing; According to the related data statistics, when motor vehicle went on the urban road, average 1/3 time was used on the level-crossing; 64% traffic accident occurs in crossing, and the traffic capacity generally reduces by 46%~50%.In order to improve the traffic capacity of intersection; Often adopt and widen the mode of entrance driveway, but in the urban road, often receive the restriction of neighboring buildings; Cost and the cost of widening the crossing inlet road are often very big, and these all are the insoluble difficult problems in surface road intersection.In order to solve urban traffic blocking, the grade separationization of intersection receives people's attention day by day.Graded crossing can separate traffic conflict point from different aspects; Be to solve level-crossing traffic conflict problem method the most completely; Therefore many people propose to utilize graded crossing to replace the serious level-crossing of congested problem, solve the urban traffic congestion problem with this.Graded crossing can realize, craspedodrome shunting spatially, improves the traffic capacity of crossing, reduces the delay rate of crossing's vehicle, reduces the generation of traffic accident.
The cross graded crossing is according to the difference of the mode that the left-hand bend vehicle is handled, the combination shape grade separation that roughly can be divided into directional type complete intercommunicating overpass, cloverleaf interchange, annular interchange and above-mentioned three kinds of left-hand bend vehicle processing modes are combined.
Directional type complete intercommunicating overpass (referring to Fig. 1) is that all directions vehicle all goes on directly current special-purpose ring road, and travel route is simple and direct, convenient, safety, and the traffic capacity is big.But the ring road number of plies of this kind grade separation is many, takes up an area of greatly, and engineering structures is complicated, and is costly, generally is applicable to the intersection that all directions vehicle flowrate is all bigger.According to the actual conditions of traffic, also can make the graded crossing of part directional type, promptly only directed ring road is set in the major flow direction.
Cloverleaf interchange (referring to Fig. 2) is the typical style of interchange.It is provided with 270 ° of circular ring roads in four quadrants around the intersection, use for left turning vehicle, turns left not turn left, and but oppositely turning right continuous 270 ° reaches the left-hand rotation purpose, all directly is communicated with outside ring road and turn right.This grade separation has been eliminated all conflict points, and only need build a bridge block, and the traffic capacity is big, is applicable to the decussation mouth that land used is sufficient, all directions vehicle flowrate is all very big.But it takes up an area of big, and cost is higher, is limited to save the area, and circular ring road radius can not be too big.
Annular interchange (referring to Fig. 3) is to realize the grade separation mode that all directions are turned through a circuit.With stride on the major road or under wear circuit directly through the intersection, unimpeded to guarantee the major road straight-going traffic, and other vehicles all along circuit by counterclockwise detouring, and the crossing direction of selecting to be gone is rolled away from.The traffic capacity of rotary interchange receives the restriction of the circuit section of the interweaving traffic capacity; When turning to wagon flow big, often cause traffic congestion easily; And road speed depends on the size of circuit radius, when the circuit radius is excessive, exists equally at urban inner and takes up an area of excessive shortcoming.
The utility model content
The purpose of the utility model provides two layers of full interchange viaduct of a kind of crossroads; Thoroughly the solution directional type complete intercommunicating overpass ring road number of plies is many, occupation of land is big, engineering structures is complicated, costly; Its occupation of land of cloverleaf interchange is big, the cost traffic capacity higher, left turning vehicle is limited by circular ring road radius; The annular interchange takes up an area of problems such as restriction big, that the traffic capacity receives the circuit section of the interweaving traffic capacity; It only utilizes the shared land area of conventional cross level-crossing; Build two layers overpass bridge, just can the traffic conflict of motor vehicle wagon flow be separated in space aspects fully, realize that all turn to wagon flow passing through continuously on time and space.
The utility model is that the technical scheme that its technical problem of solution is adopted is,
Two layers of full interchange viaduct of crossroads include the horizontal arterial highway and vertical arterial highway that are positioned at ground floor, and laterally the arterial highway is intersected in the staggered portion of cross with vertical arterial highway, it is characterized in that,
Said horizontal arterial highway has two-way direct lane, and the staggered portion of said cross is provided with down wears the tunnel, and said two-way direct lane is through wearing tunnel holing through under this, and said vertical arterial highway is provided with the craspedodrome viaduct, and the craspedodrome viaduct strides across the cross road surface vertical arterial highway is communicated with;
Vertically the arterial highway also is provided with the left-hand rotation viaduct, and the left-hand rotation viaduct strides across the cross road surface and is connected with horizontal arterial highway, and laterally the arterial highway is provided with left turn lane, and left turn lane passes through from the staggered portion of cross, is communicated with vertical arterial highway;
Laterally the both sides of arterial highway and vertical arterial highway are equipped with right-turn lane, and adjacent right-turn lane is communicated with at the staggered portion of cross edge.
Said craspedodrome viaduct is provided with two; Two craspedodrome viaduct current in the opposite direction; Said left-hand rotation viaduct is provided with two; Two left-hand rotation viaduct current in the opposite direction, said left-hand rotation viaduct is lighted the slope together and is kept same absolute altitude with craspedodrome viaduct in the same way, walks around this craspedodrome viaduct at the ground connection place of the craspedodrome viaduct of subtend and also curves left with horizontal arterial highway and be communicated with.
The advantage of the utility model is; This overpass bridge only utilizes the shared land area of conventional cross level-crossing; Build two layers overpass bridge, just can the traffic conflict of motor vehicle wagon flow be separated in space aspects fully, realize that all turn to wagon flow passing through continuously on time and space;
The craspedodrome wagon flow of its major road adopts the bridge crossing form to stride across road intersection; The craspedodrome wagon flow bridge crossing of uplink and downlink direction is taked the asymmetric design scheme; Be that uplink and downlink direction craspedodrome wagon flow bridge crossing strides across behind the road intersection ground connection immediately; And be not the same with common grade separation, the slope point that rises of uplink and downlink direction craspedodrome wagon flow bridge crossing is consistent with earth point;
The left turn traffic bridge crossing of major road and craspedodrome wagon flow bridge crossing in the same way play the slope simultaneously and keep same absolute altitude, stride across subtend craspedodrome wagon flow at the ground connection place of subtend craspedodrome wagon flow bridge crossing and accomplish;
The left turn traffic of road intersection and all right-hand rotation wagon flows are accomplished through ground floor and are turned to, and the craspedodrome wagon flow of road intersection adopts the underpass type tunnel style to pass through the intersection.Hour also can cancel the underpass type tunnel of craspedodrome wagon flow when the road intersection vehicle flowrate, craspedodrome wagon flow and left turn traffic pass through the intersection at ground floor employing control mode signal.
Description of drawings
Fig. 1 is a directional type intercommunicated overpass plan view;
Fig. 2 is a cloverleaf interchange overpass plan view;
Fig. 3 is annular interchange overpass plan view;
Fig. 4 is the structural representation of two layers of full interchange viaduct of crossroads of the utility model proposition;
Fig. 5 is the plan view of two layers of full interchange viaduct of crossroads.
The specific embodiment
For technological means, creation characteristic that the utility model is realized, reach purpose and be easy to understand with effect and understand, below in conjunction with illustrating and specific embodiment, further set forth the utility model.
Like Fig. 4, shown in Figure 5; Two layers of full interchange viaduct of crossroads that the utility model proposes include the horizontal arterial highway and vertical arterial highway that is positioned at ground floor; Laterally the arterial highway is intersected in the staggered portion of cross with vertical arterial highway; Said horizontal arterial highway has two-way direct lane 1, and the staggered portion of said cross is provided with down wears the tunnel, and said two-way direct lane 1 is through wearing tunnel holing through under this; Said vertical arterial highway is provided with the first craspedodrome viaduct 4 and the second craspedodrome viaduct 5, and the craspedodrome viaduct strides across the cross road surface vertical arterial highway is communicated with; Vertically the arterial highway also is provided with the first left-hand rotation viaduct 6 and the second left-hand rotation viaduct 7, and the left-hand rotation viaduct strides across the cross road surface and is connected with horizontal arterial highway, and laterally the arterial highway is provided with left turn lane, and left turn lane passes through from the staggered portion of cross, is communicated with vertical arterial highway; Laterally the both sides of arterial highway and vertical arterial highway are equipped with right-turn lane, and adjacent right-turn lane is communicated with at the staggered portion of cross edge.
Concrete; Vertically the arterial highway is provided with the first craspedodrome viaduct 4 and the second craspedodrome viaduct 5; Two craspedodrome viaduct current in the opposite direction; And be provided with the first left-hand rotation viaduct 6 and the second left-hand rotation viaduct 7; Two left-hand rotation viaduct current in the opposite direction, the first left-hand rotation viaduct 6 is lighted the slope together and is kept same absolute altitude with the first craspedodrome viaduct 4 in the same way, and the first left-hand rotation viaduct 6 is walked around this craspedodrome viaduct and is also curved left with horizontal arterial highway and be communicated with at the ground connection place of the second craspedodrome viaduct 5 of subtend; The second left-hand rotation viaduct 7 is lighted the slope together and is kept same absolute altitude with the second craspedodrome viaduct 5 in the same way, and the second left-hand rotation viaduct 7 is walked around this craspedodrome viaduct and turned left at the ground connection place of the first craspedodrome viaduct 4 of subtend and is communicated with horizontal arterial highway.
More than show and described the advantage of basic principle, principal character and the utility model of the utility model.The technician of the industry should understand; The utility model is not restricted to the described embodiments; The principle of describing in the foregoing description and the manual that the utility model just is described; The utility model also has various changes and modifications under the prerequisite that does not break away from the utility model spirit and scope, and these variations and improvement all fall in the utility model scope that requires protection.The utility model requires protection domain to be defined by appending claims and equivalent thereof.

Claims (2)

1. two layers of full interchange viaduct of crossroads include the horizontal arterial highway and vertical arterial highway that are positioned at ground floor, and laterally the arterial highway is intersected in the staggered portion of cross with vertical arterial highway, it is characterized in that,
Said horizontal arterial highway has two-way direct lane, and the staggered portion of said cross is provided with down wears the tunnel, and said two-way direct lane is through wearing tunnel holing through under this, and said vertical arterial highway is provided with the craspedodrome viaduct, and the craspedodrome viaduct strides across the cross road surface vertical arterial highway is communicated with;
Vertically the arterial highway also is provided with the left-hand rotation viaduct, and the left-hand rotation viaduct strides across the cross road surface and is connected with horizontal arterial highway, and laterally the arterial highway is provided with left turn lane, and left turn lane passes through from the staggered portion of cross, is communicated with vertical arterial highway;
Laterally the both sides of arterial highway and vertical arterial highway are equipped with right-turn lane, and adjacent right-turn lane is communicated with at the staggered portion of cross edge.
2. two layers of full interchange viaduct of crossroads according to claim 1; It is characterized in that said craspedodrome viaduct is provided with two, two craspedodrome viaduct current in the opposite direction; Said left-hand rotation viaduct is provided with two; Two left-hand rotation viaduct current in the opposite direction, said left-hand rotation viaduct is lighted the slope together and is kept same absolute altitude with craspedodrome viaduct in the same way, walks around this craspedodrome viaduct at the ground connection place of the craspedodrome viaduct of subtend and also curves left with horizontal arterial highway and be communicated with.
CN2011203322969U 2011-09-06 2011-09-06 Novel intersection two-storey whole interchange overpass Expired - Fee Related CN202227212U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203322969U CN202227212U (en) 2011-09-06 2011-09-06 Novel intersection two-storey whole interchange overpass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203322969U CN202227212U (en) 2011-09-06 2011-09-06 Novel intersection two-storey whole interchange overpass

Publications (1)

Publication Number Publication Date
CN202227212U true CN202227212U (en) 2012-05-23

Family

ID=46077805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203322969U Expired - Fee Related CN202227212U (en) 2011-09-06 2011-09-06 Novel intersection two-storey whole interchange overpass

Country Status (1)

Country Link
CN (1) CN202227212U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284009A (en) * 2016-10-18 2017-01-04 冯阳 Cross interchange overpass
CN106555409A (en) * 2017-01-16 2017-04-05 王燏斌 A kind of subway station with complete intercommunicating overpass
CN106758614A (en) * 2017-01-16 2017-05-31 王燏斌 A kind of complete intercommunicating overpass of crossroad
CN108316075A (en) * 2018-03-15 2018-07-24 王建友 A kind of crossroad of track fork
WO2019174527A1 (en) * 2018-03-15 2019-09-19 王建友 Road junction

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284009A (en) * 2016-10-18 2017-01-04 冯阳 Cross interchange overpass
CN106555409A (en) * 2017-01-16 2017-04-05 王燏斌 A kind of subway station with complete intercommunicating overpass
CN106758614A (en) * 2017-01-16 2017-05-31 王燏斌 A kind of complete intercommunicating overpass of crossroad
WO2018130210A1 (en) * 2017-01-16 2018-07-19 王燏斌 Full interchange at crossroads
CN108316075A (en) * 2018-03-15 2018-07-24 王建友 A kind of crossroad of track fork
WO2019174527A1 (en) * 2018-03-15 2019-09-19 王建友 Road junction

Similar Documents

Publication Publication Date Title
CN202247574U (en) Three-dimensional crossroad of traffic road
CN202227212U (en) Novel intersection two-storey whole interchange overpass
CN102234971B (en) Combined traffic facility of right running 'halberd'-shaped bifurcate bridge and bifurcate tunnel
CN207073044U (en) Bridge tunnel composite cross crossing road
CN2926299Y (en) Overpass with parking position
CN105155374A (en) Multifunctional cross-shaped overpass
CN105625127A (en) Intersection road of Chinese knot type interchange
CN104093905A (en) Crossroads structure to facilitate re-modelling of established crossroads
CN102234966B (en) The composite bridge of four independence " fore-telling " the shaped forked bridges turned left and keep straight on unimpeded
CN104831595A (en) Intercommunication type grade-separated junction layout structure
CN102900000B (en) Comprehensive complete straight-through direct left-hand rotation right lateral viaduct
CN104389251A (en) Combined interchange road system of city bridge
CN203451962U (en) Intersection fast-slow diverging cross road structure
CN204803700U (en) Quick cross overpass
CN101967784A (en) Combined structure of four L-shaped tunnels turning in same direction
CN204875403U (en) Multi -functional cross overpass
CN203451960U (en) Interchange road structure for shunting fast and slow vehicles
CN202559203U (en) Cruciform unimpeded type overpass
CN204825536U (en) Interchange bridge of people's car layering
CN204435148U (en) The intersection structure of a kind of little space Lothrus apterus point
CN207582207U (en) Urban road T-shaped road junction road structure
CN204825534U (en) City road bridge net
CN101705652A (en) Universal compact road overpass
CN202220318U (en) Left turning type directional interchange overpass
CN102234968B (en) The combination tunnel in four " fore-telling " font tunnels turned left and keep straight on unimpeded

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120523

Termination date: 20120906