CN202210024U - Anchor chain conveyor - Google Patents

Anchor chain conveyor Download PDF

Info

Publication number
CN202210024U
CN202210024U CN2011202465471U CN201120246547U CN202210024U CN 202210024 U CN202210024 U CN 202210024U CN 2011202465471 U CN2011202465471 U CN 2011202465471U CN 201120246547 U CN201120246547 U CN 201120246547U CN 202210024 U CN202210024 U CN 202210024U
Authority
CN
China
Prior art keywords
anchor chain
push pedal
chain
driven
underframe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202465471U
Other languages
Chinese (zh)
Inventor
祁辉德
祁海
茅家银
童志镇
赵让荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENJIANG BAOHAI SHIPS HARDWARE CO.,LTD.
Original Assignee
JURONG BLUE OCEAN ANCHOR CHAIN FACTORY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JURONG BLUE OCEAN ANCHOR CHAIN FACTORY filed Critical JURONG BLUE OCEAN ANCHOR CHAIN FACTORY
Priority to CN2011202465471U priority Critical patent/CN202210024U/en
Application granted granted Critical
Publication of CN202210024U publication Critical patent/CN202210024U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses an anchor chain conveyor, which includes an underframe, a guiding rail used for conveying an anchor chain and installed at the bottom of the underframe, a pushing plate mechanism and a transmission mechanism, wherein the transmission mechanism includes a driving shaft installed with two driving chain wheels and a driven shaft installed with two driven chain wheels; the driving shaft and the driven shaft are installed at the two ends of the underframe respectively; the driving shaft is driven through a motor; the driving chain wheel and the driven chain wheel on the same side are connected through a chain for transmission; the pushing plate mechanism includes a pushing plate rack and a pushing plate used for pushing the anchor chain; the pushing plate rack is fixed on the chains; the pushing plate is hinged with the pushing plate rack; and the front end of the pushing plate faces to the direction the same as the conveying direction of the anchor chain. The anchor chain conveyor has long stroke, high efficiency, reliable operation, convenience for maintenance and lower cost.

Description

A kind of anchor chain conveyor
Technical field
The utility model relates to a kind of anchor chain tensile test equipment, the conveying equipment when being specifically related to the anchor chain tensile test.
Background technology
After anchor chain production is intact, need carries out tensile test to it, and when anchor chain is carried out tensile test, need the anchor chain that test be released the tensile test machine.
Existing anchor chain manufacturing enterprise all uses the anchor chain propulsion system of traditional structure; It adopts the lengthening oil cylinder as thrust power; When supporting more corresponding hydraulic power unit simultaneously, this arrangement works since oil cylinder limited length and oil cylinder operation slowly, so its inefficiency; Increased pumping plant and oil cylinder simultaneously, equipment cost is expensive.
The utility model content
Goal of the invention: the utility model is to the deficiency of prior art, and a kind of high-level efficiency, anchor chain conveyor cheaply are provided.
Technical scheme: to achieve these goals, the utility model adopts following technical scheme: a kind of anchor chain conveyor comprises underframe, is installed in guide rail, rushing board mechanism and conveying mechanism that the underframe bottom is used to carry anchor chain; Said conveying mechanism comprises main drive shaft that two drive sprockets are installed and the driven shaft that two driven sprockets are installed; Said main drive shaft and driven shaft are installed in the underframe two ends respectively; And main drive shaft is through driven by motor, and said drive sprocket is connected transmission with the driven sprocket of homonymy through chain; Said rushing board mechanism comprises push pedal frame and the push pedal that is used to promote anchor chain, and said push pedal frame is fixed on the chain, and said push pedal and push pedal frame are hinged, and the front end of this push pedal is consistent with the anchor chain throughput direction.
The principle of work of the utility model: behind anchor chain process tensile test; Drive sprocket on the anchor chain conveyor by driven by motor after; Then drive driven sprocket through chain, thereby the push pedal that is fixed on the rushing board mechanism on the chain promotes anchor chain along guide rail slip conveying.When since chain be go round and begin again around sprocket wheel motion, so delivery stroke is big, efficient is high, and cost is lower.
The friction force of equipment operation when carrying in order to reduce anchor chain, said underframe two inboards are respectively equipped with chute; Said push pedal frame is " well " shape framework, and two bearings are installed at the two ends of this push pedal frame respectively, and place in the said chute.
Anchor chain passes through from the anchor chain conveyor for ease, and is separated in the said driven shaft.
Beneficial effect: compared with prior art, the utlity model has following advantage: delivery stroke is big, and efficient is high, and is reliable, easy to maintenance, and cost is lower.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the vertical view of Fig. 1.
Embodiment
Below in conjunction with accompanying drawing, the utility model technical scheme is elaborated.
As depicted in figs. 1 and 2, the anchor chain conveyor comprises underframe 1, driven sprocket 5, rushing board mechanism and conveying mechanism; 1 liang of inboard of this underframe is provided with chute, and this driven sprocket 5 is laid on the bottom of underframe 1 along the anchor chain throughput direction, is used to carry anchor chain; Main drive shaft 2 and driven shaft 3 are installed respectively at the two ends of underframe 1; The conveying of anchor chain for ease; Separated in the driven shaft 3, two drive sprockets 4 and another sprocket wheel that links to each other with reducing motor 9 are set on the main drive shaft 2, this main drive shaft 2 is driven through sprocket wheel by the reducing motor 9 that is installed on the underframe 1; On the driven shaft 3 two driven sprockets 5 are set simultaneously, the drive sprocket 4 of the same side is connected transmission with driven sprocket 5 through chain 11; Above-mentioned rushing board mechanism comprises push pedal frame 7 and push pedal 8; This push pedal frame 7 is " well " shape framework, and is weldingly fixed on the upper strata chain 11, and two bearings 10 is installed at these push pedal frame 7 two ends simultaneously; This bearing 10 also is placed in the inboard chute of underframe 1, thus the friction force can reduce work the time; Be hinged with push pedal 8 on the push pedal frame 7 simultaneously, these push pedal 8 front ends are consistent with the direction of carrying anchor chain, and press on anchor chain, and this push pedal 8 is from the horizontal by 27 ° of angles.
When anchor chain behind tensile test, 9 work of reducing motor on the anchor chain conveyor also drive the sprocket rotation on the main drive shaft 2, this moment, the fltting speed of chain 11 was 0.4m/s.Push pedal 8 travels forward and promotes the anchor chain on the track during work because push pedal 8 is from the horizontal by 27 ° of angles, the power of its output be vertically downward with the making a concerted effort of tangential movement direction, skidding does not appear so push pedal 8 push pedal 8 when travelling forward can not be lifted.After anchor chain is advanced to predetermined length, the motion of reducing motor 9 directions, chain 11 turns back to starting point, and this moment, the friction force of anchor chain and push pedal 8 was not enough, and push pedal 8 is lifted naturally and is got back to starting point, prepares to carry for the second time.
The above only is the preferred implementation of the utility model; Be noted that for those skilled in the art; Under the prerequisite that does not break away from the utility model principle; Can also make some improvement and retouching, these improvement and retouching also should be regarded as the protection domain of the utility model.

Claims (3)

1. an anchor chain conveyor is characterized in that: comprise underframe (1), be installed in guide rail (6), rushing board mechanism and conveying mechanism that underframe (1) bottom is used to carry anchor chain; Said conveying mechanism comprises main drive shaft (2) that two drive sprockets (4) are installed and the driven shaft (3) that two driven sprockets (5) are installed; Said main drive shaft (2) and driven shaft (3) are installed in underframe (1) two ends respectively; And main drive shaft (2) drives through motor (9), and said drive sprocket (4) is connected transmission with the driven sprocket (5) of homonymy through chain (11); Said rushing board mechanism comprises push pedal frame (7) and is used to promote the push pedal (8) of anchor chain, and this push pedal frame (7) is fixed on the chain (11), and said push pedal (8) is hinged with push pedal frame (7), and the front end of said push pedal (8) is consistent with the anchor chain throughput direction.
2. anchor chain conveyor according to claim 1 is characterized in that: said underframe (1) two inboard is respectively equipped with chute; Said push pedal frame (7) is " well " shape framework, and two bearings (10) are installed at the two ends of this push pedal frame (7) respectively, and said bearing (10) places in the said chute.
3. anchor chain conveyor according to claim 1 is characterized in that: separated in the said driven shaft (3).
CN2011202465471U 2011-07-13 2011-07-13 Anchor chain conveyor Expired - Fee Related CN202210024U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202465471U CN202210024U (en) 2011-07-13 2011-07-13 Anchor chain conveyor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202465471U CN202210024U (en) 2011-07-13 2011-07-13 Anchor chain conveyor

Publications (1)

Publication Number Publication Date
CN202210024U true CN202210024U (en) 2012-05-02

Family

ID=45989569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202465471U Expired - Fee Related CN202210024U (en) 2011-07-13 2011-07-13 Anchor chain conveyor

Country Status (1)

Country Link
CN (1) CN202210024U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102944408A (en) * 2012-11-23 2013-02-27 亚星(镇江)系泊链有限公司 Push chain device of anchor chain tension tester
CN102980804A (en) * 2012-11-16 2013-03-20 无锡蓝海船舶舾装设备有限公司 Test stand of chain-link clamping device
CN105738135A (en) * 2016-01-22 2016-07-06 安徽捷迅光电技术有限公司 Slope machine debugging tool

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102980804A (en) * 2012-11-16 2013-03-20 无锡蓝海船舶舾装设备有限公司 Test stand of chain-link clamping device
CN102944408A (en) * 2012-11-23 2013-02-27 亚星(镇江)系泊链有限公司 Push chain device of anchor chain tension tester
CN102944408B (en) * 2012-11-23 2015-07-08 亚星(镇江)系泊链有限公司 Push chain device of anchor chain tension tester
CN105738135A (en) * 2016-01-22 2016-07-06 安徽捷迅光电技术有限公司 Slope machine debugging tool

Similar Documents

Publication Publication Date Title
CN201231980Y (en) Steel bar splitting rack for steel rail feeding
CN205652732U (en) Chain -plate conveyor
CN205589877U (en) Online radium carving machine
CN202210024U (en) Anchor chain conveyor
CN201761890U (en) Chain plate type feeder
CN204751466U (en) A assembly line for assembly of car seat back
CN202098805U (en) Transmission chain of sorting machine
CN206683396U (en) Tunnel cave finished product kiln car chain-type pull ferry device
CN203997972U (en) Belt conveyor automatic cleaning reclaims elevator system
CN204457014U (en) The lifting drive apparatus of lift-sliding machinery garage
CN202016748U (en) Plate superposing machine
CN202054393U (en) Board feeding mechanism of block making machine
CN202943184U (en) Slipping and continuous feeding device for high-speed punching machine
CN203006593U (en) Automatic stacker crane for rock wool boards
CN205367573U (en) Elevator
CN204640470U (en) Push away brick brick cutting device
CN203568558U (en) Delivery system applied to paper financial products
CN106892374A (en) A kind of animals with diseases harmless treatment list pocket elevator
CN206645627U (en) One kind dislocation stacking machine
CN202529162U (en) Belt box filling machine
CN207077252U (en) A kind of steel pipe sawing machine of automatic blanking
CN206203226U (en) A kind of conveyer for being easy to quick replacement chain bucket
CN101376458A (en) Instrument board end head pneumatic elevating gear
CN202625244U (en) Novel conveying device
CN204604508U (en) A kind of conveyer of particieboard

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: Room 718, small commodity complex building, South Gate Street, Jiangsu, Zhenjiang 212001

Patentee after: Jingkou District Zhenjiang City BlueOcean anchor chain factory

Address before: 212434 Jurong Jurong blue sea anchor chain factory, Jiangsu Town, Ge Village Development Zone, Zhenjiang City, Sichuan Province

Patentee before: Jurong Blue Ocean Anchor Chain Factory

TR01 Transfer of patent right

Effective date of registration: 20151209

Address after: 212431, Jiangsu City, Zhenjiang province Jurong Guo Zhen Ge Village Development Zone

Patentee after: ZHENJIANG BAOHAI SHIPS HARDWARE CO.,LTD.

Address before: Room 718, small commodity complex building, South Gate Street, Jiangsu, Zhenjiang 212001

Patentee before: Jingkou District Zhenjiang City BlueOcean anchor chain factory

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120502

Termination date: 20190713

CF01 Termination of patent right due to non-payment of annual fee