CN202208443U - Tubular workpiece locking mechanism - Google Patents
Tubular workpiece locking mechanism Download PDFInfo
- Publication number
- CN202208443U CN202208443U CN2011203036632U CN201120303663U CN202208443U CN 202208443 U CN202208443 U CN 202208443U CN 2011203036632 U CN2011203036632 U CN 2011203036632U CN 201120303663 U CN201120303663 U CN 201120303663U CN 202208443 U CN202208443 U CN 202208443U
- Authority
- CN
- China
- Prior art keywords
- arc plate
- down bolt
- holding
- tubular workpiece
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Jigs For Machine Tools (AREA)
Abstract
The utility model relates to a tubular workpiece locking mechanism, wherein a left arc plate and a right arc plate are arranged on a frame. The frame is also provided with a support block arranged between the left arc plate and the right arc plate and used for supporting a tubular workpiece. The lower end of the left arc plate is movably connected with the frame through a left lower margin bolt assembly. With the cooperation with the left arc plate, the right arc plate is used for clamping a tubular workpiece. The lower end of the right arc plate is movably connected with the frame through a right lower margin bolt assembly. The upper end of the left arc plate is provided with a hook and the upper end of the right arc plate is provided with a retractor in a locking cooperation with the hook. The tubular workpiece locking mechanism has the advantages of simple structure, stable and reliable operation and convenient operation. When the locking mechanism is used for the batch clamping of tubular workpieces, the advantage of the locking mechanism is more prominent. Therefore, the locking mechanism can bring remarkable social benefits.
Description
Technical field
The utility model relates to a kind of tubular workpiece catch gear.
Background technology
The workpiece product of shape comparison rule such as tubulose be prone to roll, therefore discharging in the warehouse, and transportation, and use all must carry out fixing and locking, prevents its rolling.Existing locking method generally adopts vee-block to support, and soft nylon tape is tied up, tie up and the time of loosening long, loaded down with trivial details, when the batch tubular products lock, a kind of simple in structure, easy to operate locking method of needs.
Summary of the invention
The purpose of the utility model is to overcome the above-mentioned deficiency of prior art and provides a kind of simple in structure, stable and reliable operation tubular workpiece catch gear.
The technical scheme of the utility model is: frame is provided with left arc plate, right arc plate; Frame between left side arc plate, the right arc plate is provided with the back-up block that is used to support tubular workpiece; Arc plate lower end, a left side flexibly connects through left holding-down bolt assembly and frame; Be used to cooperate left arc plate to flexibly connect through right holding-down bolt assembly and frame with the right arc plate lower end of clamping tubular workpiece; Arc plate upper end, a left side is provided with hook, and right arc plate upper end is provided with and links up with the drag hook that locks.
Said left holding-down bolt assembly is fixed in frame; Arc plate lower end, a left side and left holding-down bolt assembly flexibly connect.
The top and bottom of said left arc plate, right arc plate all are poroid in the rolling.
Said left holding-down bolt assembly comprises left front holding-down bolt, left back holding-down bolt; Said left arc plate lower end endoporus and sleeve pipe kink; Said sleeve pipe is fixed in left front holding-down bolt, left back holding-down bolt through screw, nut.
Said right holding-down bolt assembly is fixed in frame; Right arc plate lower end and right holding-down bolt assembly flexibly connect.
Said right holding-down bolt assembly comprises right front holding-down bolt, right back holding-down bolt; Sleeve pipe is fixed in said right arc plate lower end; Said sleeve pipe is fixed in right front holding-down bolt, right back holding-down bolt through screw, nut.
Said left arc plate, right arc plate are separately positioned on the back-up block left and right sides, are symmetrical distribution.
The utility model is simple in structure, and working stability is reliable, and is easy to operate, and its advantage looms large when the batch tubular products is fastening, can produce remarkable social benefit.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Fig. 2 is the birds-eye view of Fig. 1.
Fig. 3 is the left view of Fig. 1.
Fig. 4 is the running condition scheme drawing of the utility model.
Among the figure, 1, screw, 2, frame, 3, sleeve pipe, 4, right arc plate, 5, left front holding-down bolt, 6, left arc plate, 7, hook, 8, drag hook, 9, tubular workpiece, 10, back-up block, 11, left back holding-down bolt, 12, nut.
The specific embodiment
Among Fig. 1, Fig. 2, the top and bottom of left arc plate 6, right arc plate 4 all are poroid in the rolling.Hook 7 and an end of drag hook 8 are connected with an end of left arc plate 6, right arc plate 4 respectively.Left side arc plate 6 other ends are connected with left back holding-down bolt 11, left front holding-down bolt 5 usefulness nuts 12 through sleeve pipe through screw 1, and the left arc plate 6 of right arc plate 4 usefulness connects with quadrat method.Rear foot bolt assembly, forward foot in a step bolt assembly and frame 2 are fixing.Back-up block 10 is fixed on the frame 2, and tubular workpiece 9 is placed on the back-up block 10.Only need drag hook 8 is hung on the hook 7 rotational hook 7 tubular workpiece 9 that can be locked during use.
Among Fig. 3, left arc plate 6 lower end endoporus and sleeve pipe 3 kinks.Left front holding-down bolt 5, left back holding-down bolt 11 are fixed in frame 2.It is fixing through nut 12 that screw 1 passes left back holding-down bolt 11, sleeve pipe 3, left front holding-down bolt 5 successively.
Fig. 4 is the running condition scheme drawing of the utility model.
Claims (7)
1. tubular workpiece catch gear, it is characterized in that: frame (2) is provided with left arc plate (6), right arc plate (4); Frame (2) between left side arc plate (6), the right arc plate (4) is provided with the back-up block (10) that is used to support tubular workpiece (9); Arc plate (6) lower end, a left side flexibly connects through left holding-down bolt assembly and frame (2); Be used to cooperate left arc plate (6) to flexibly connect through right holding-down bolt assembly and frame (2) with right arc plate (4) lower end of clamping tubular workpiece (9); Left side arc plate (6) upper end is provided with hook (7), and right arc plate (4) upper end is provided with and links up with the drag hook (8) that (7) lock.
2. tubular workpiece catch gear according to claim 1 is characterized in that: left holding-down bolt assembly is fixed in frame (2); Arc plate (6) lower end, a left side and left holding-down bolt assembly flexibly connect.
3. tubular workpiece catch gear according to claim 1 and 2 is characterized in that: the top and bottom of said left arc plate (6), right arc plate (4) all are poroid in the rolling.
4. tubular workpiece catch gear according to claim 3 is characterized in that: said left holding-down bolt assembly comprises left front holding-down bolt (5), left back holding-down bolt (11); Said left arc plate (6) lower end endoporus and sleeve pipe (3) kink; Said sleeve pipe (3) is fixed in left front holding-down bolt (5), left back holding-down bolt (11) through screw (1), nut (12).
5. tubular workpiece catch gear according to claim 1 is characterized in that: right holding-down bolt assembly is fixed in frame (2); Right arc plate (4) lower end and right holding-down bolt assembly flexibly connect.
6. tubular workpiece catch gear according to claim 5 is characterized in that: said right holding-down bolt assembly comprises right front holding-down bolt, right back holding-down bolt; Sleeve pipe is fixed in said right arc plate (4) lower end; Said sleeve pipe is fixed in right front holding-down bolt, right back holding-down bolt through screw, nut.
7. tubular workpiece catch gear according to claim 1 is characterized in that: said left arc plate (6), right arc plate (4) are separately positioned on back-up block (10) left and right sides, are symmetrical distribution.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203036632U CN202208443U (en) | 2011-08-19 | 2011-08-19 | Tubular workpiece locking mechanism |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203036632U CN202208443U (en) | 2011-08-19 | 2011-08-19 | Tubular workpiece locking mechanism |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202208443U true CN202208443U (en) | 2012-05-02 |
Family
ID=45987996
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011203036632U Expired - Fee Related CN202208443U (en) | 2011-08-19 | 2011-08-19 | Tubular workpiece locking mechanism |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202208443U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102951360A (en) * | 2011-08-19 | 2013-03-06 | 新兴重工湖北三六一一机械有限公司 | Tubular workpieces locking mechanism |
CN103662383A (en) * | 2013-11-30 | 2014-03-26 | 成都科盛石油科技有限公司 | Oil pipeline clamping fixture |
-
2011
- 2011-08-19 CN CN2011203036632U patent/CN202208443U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102951360A (en) * | 2011-08-19 | 2013-03-06 | 新兴重工湖北三六一一机械有限公司 | Tubular workpieces locking mechanism |
CN103662383A (en) * | 2013-11-30 | 2014-03-26 | 成都科盛石油科技有限公司 | Oil pipeline clamping fixture |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204881356U (en) | Section butt joint of large -scale body cabin and body tipping arrangement | |
CN102976055A (en) | Detachable roller carrying frame | |
CN202208443U (en) | Tubular workpiece locking mechanism | |
CN201714075U (en) | Novel external angle lock for building | |
CN203218760U (en) | Transferring trolley | |
CN201712906U (en) | Combination shelf for storing, stacking and transporting plates | |
CN201913635U (en) | Novel product storage rack | |
CN202609217U (en) | Split bottom support used for physical distribution | |
CN204916856U (en) | Large -scale pipe fitting conveyer | |
CN202175077U (en) | Trailed flower carrying trolley | |
CN102951360A (en) | Tubular workpieces locking mechanism | |
CN203961424U (en) | A kind of special tooling of installation and transportation electric pole | |
CN210310497U (en) | Make things convenient for inside turnover frock car of narrow switch board of hand push | |
CN207029212U (en) | A kind of hand pulling type transport cart of convenient handling | |
CN218582004U (en) | Multifunctional material rack fixing and connecting structure | |
CN207841274U (en) | A kind of detachable mould placing rack | |
CN206067816U (en) | A kind of switch panel tote cart | |
CN203496951U (en) | Folding chair conveying vehicle | |
CN219949511U (en) | Wooden door line transportation transfer trolley | |
CN203359659U (en) | Silk roll racking device | |
CN203284174U (en) | Forklift rack supporting base | |
CN206171511U (en) | Logistics car | |
CN207596256U (en) | A kind of safe tubular spool | |
CN202209042U (en) | Scaffold mechanism with double inclined struts | |
CN202840638U (en) | Supporting frame for water-cooled storage battery charging frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120502 Termination date: 20130819 |