CN202201597U - Intelligent control system of lifter used for building construction - Google Patents

Intelligent control system of lifter used for building construction Download PDF

Info

Publication number
CN202201597U
CN202201597U CN2011202606304U CN201120260630U CN202201597U CN 202201597 U CN202201597 U CN 202201597U CN 2011202606304 U CN2011202606304 U CN 2011202606304U CN 201120260630 U CN201120260630 U CN 201120260630U CN 202201597 U CN202201597 U CN 202201597U
Authority
CN
China
Prior art keywords
cage
control system
intelligent control
elevator
processing unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202606304U
Other languages
Chinese (zh)
Inventor
季军
李熠愫
李骏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEFEI ZHONGBAO MACHINERY MANUFACTURING Co Ltd
Original Assignee
HEFEI ZHONGBAO MACHINERY MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEFEI ZHONGBAO MACHINERY MANUFACTURING Co Ltd filed Critical HEFEI ZHONGBAO MACHINERY MANUFACTURING Co Ltd
Priority to CN2011202606304U priority Critical patent/CN202201597U/en
Application granted granted Critical
Publication of CN202201597U publication Critical patent/CN202201597U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to an intelligent control system of a lifter used for building construction. The intelligent control system comprises at least two motors which are used driving the lifter used for building construction to go up and down, a processing unit electrically connected with at least two motors as well as a speed measurement sensor, a weighing sensor and an alarm unit which are respectively electrically connected with the processing unit. The lifter used for building construction comprises a guiding track framework provided with a rack, a cage which is provided with a gear meshed with the rack of the guiding track framework, a support fixed on the cage and a rotating part pivoted with the support. The speed measurement sensor is arranged on the cage and is close to the gear of the cage, and the weighing sensor is arranged on a motor transmission plate and inside a pin shaft on a cage connecting lug. The intelligent control system is energy-saving and environmentally-friendly and can ensure the lifter used for building construction to have longer service life.

Description

A kind of building operation is with the intelligent control system of elevator
Technical field
The utility model relates to a kind of intelligent control system, relates in particular to the intelligent control system of a kind of building operation with elevator.
Background technology
Elevator is used in building operation; Like the dual-purpose building hoist of SCD200/200 people's goods is a kind of construction machinery and equipment that leans on the rack-and-gear transmission; The people, the shipping that are mainly used in high-building construction are defeated; Being furnished with the very electric and mechanical safety system of failure-free, is safety, vertical transport equipment efficiently in the building operation.Transmission adopted three (two) motor of building hoist, three (two) retarder drive; Two covers are independent separately; Every motor all is equipped with dc electromagnetic brake; Motor → elastic coupling → reductor → reductor output gear through the engagement of the tooth bar on reductor output gear and the guide rail bracket, is realized the operation of cage on rail bracket.Building hoist is furnished with very failure-free safety control system, is made up of the safety switching apparatus that is provided with in the circuit and other control device.When abnormal condition take place in the elevator operation, will cut off the electricity supply automatically, make cage out of service, to guarantee the safety of elevator.Like the speed-limiting protection of anti-falling safety device, when building hoist overspeed occurred for various reasons, if during the critical action rotating speed that running velocity reaches that velocity limiter sets up, then velocity limiter produced braking maneuver, with the cage braking on guide rail bracket.Motor power is cut off in travel switch conversion in the velocity limiter simultaneously, also plays the effect of protection electrical motor.
Because no matter building hoist when operation is zero load or heavy duty, three (two) motor of driving system all must all be opened operation according to rating horsepower, has caused the unnecessary loss of part electric energy when unloaded.Anti-falling safety device is most important parts on the building hoist.In case but anti-falling safety device action meeting causes certain infringement to tooth bar, need the personnel and special-purpose instrument of specialty during recovery.
The utility model content
In view of this, be necessary to provide a kind of can energy-conserving and environment-protective and can make building operation have the intelligent control system in preferable life-span with elevator.
The utility model is achieved in that the intelligent control system of a kind of building operation with elevator, and it comprises and is used to drive building operation with at least two motors of cage lifter lifting and the processing unit that electrically connects with these at least two motors.This building operation comprises guide rail bracket with tooth bar, has and the cage of the tooth bar gears in mesh of this guide rail bracket, the tumbler that is fixed on the bearing on this cage and articulates with this bearing with elevator.This intelligent control system also comprises respectively tachogenerator, LOAD CELLS and the alarm unit that electrically connects with this processing unit; This tachogenerator is installed on this cage and near the gear of this cage, this LOAD CELLS is installed on the pivot between this tumbler and this bearing.
Further, this intelligent control system also comprises the display unit that electrically connects with this processing unit.
Further, this display unit is a text display.
Further, this intelligent control system also comprises the signal transmitting device that is electrically connected between this tachogenerator and this processing unit.
The utility model compared with prior art, beneficial effect is: the intelligent control system that the utility model provides, through the setting of LOAD CELLS; Energy savings reduces the electric energy loss of equipment, and the text display through faulty condition has shortened the time of searching fault greatly simultaneously; Improve the efficient of maintenance and repair work, promoted the craftmanship of complete machine, and the setting through tachogenerator; Velocity anomaly appears when in a single day cage is moved; This control system will be forced to break off motor and band-type brake power supply before other fender guard (like anti-falling safety device) does not move in advance, played the effect that prevents trouble before it happens.So intelligent control system can energy-conserving and environment-protective and can be made building operation have the preferable life-span with elevator.
Description of drawings
Fig. 1 forms scheme drawing for the module of the intelligent control system that the utility model preferred embodiments provides.
Fig. 2 is that the building operation of intelligent control system in the application drawing 1 is formed scheme drawing with the structure of elevator.
Fig. 3 be among Fig. 2 building operation with the LOAD CELLS installation site scheme drawing of elevator.
Nomenclature
Intelligent control system 100
Building operation is with elevator 200
Motor 10
Processing unit 20
Tachogenerator 30
LOAD CELLS 40
Alarm unit 50
Display unit 60
Signal transmitting device 70
Cage 11
Guide rail bracket 12
Head sheave 13
Steel rope 14
Counterweight body 15
Tumbler 16
Rope roll assembling 161
Bearing 17
Drive of motor plate 21
Cage connects otic placode 22
Bearing pin 23
The specific embodiment
For the purpose, technical scheme and the advantage that make the utility model is clearer,, the utility model is further elaborated below in conjunction with accompanying drawing and embodiment.Should be appreciated that specific embodiment described herein only in order to explanation the utility model, and be not used in qualification the utility model.
Please consult Fig. 1 and Fig. 2 in the lump; Its building operation that provides for the utility model preferred embodiments is formed scheme drawing with the module of the intelligent control system 100 of elevator, intelligent control system 100 comprise two motors 10, processing unit 20, tachogenerator 30, LOAD CELLS 40, alarm unit 50, display unit 60 and be electrically connected at LOAD CELLS 40 and this processing unit 20 between signal transmitting device 70.Processing unit 20 all electrically connects with two motors 10, tachogenerator 30, LOAD CELLS 40, alarm unit 50 and display unit 60.In this embodiment, display unit 60 is a text display, is appreciated that in other embodiments, and display unit 60 can also be display devices such as touch-control read-out, LCD display, charactron.
Processing unit 20 is used to control the operation of intelligent control system 100; Motor 10 is used to drive the up-down of building operation with elevator 200; Tachogenerator 30 is used under the control of processing unit 20, measuring the moving velocity of building operation with elevator 200, and LOAD CELLS 40 is used under the control of processing unit 20, measuring the real-time weight of building operation with elevator 200.Alarm unit 50 is used for when building operation surpasses a predetermined speed range with the moving velocity of elevator 200 prompting reports to the police, and is used for prompting warning when building operation surpasses a preset weight value with the real-time weight of elevator 200.Display unit 60 is used to show rising or falling speed, load carrying ability and the prompt messages of building operation with elevator 200.Alarm unit 50 also is used for the various faulty conditions of each travel switch of operational process are reported to the police, and does corresponding demonstration by display unit 60.
Building operation comprises the cage 11 with gear, the guide rail bracket 12 with tooth bar, head sheave 13, steel rope 14, counterweight body 15, tumbler 16 and bearing 17 with elevator 200.
Please combine Fig. 3, guide rail bracket 12 sets up on the ground, and its top is fixed with head sheave 13.The top of bearing 17 fixed cap cages 11, tumbler 16 is articulated in bearing 17, the tooth bar engagement of the gear of cage 11 and guide rail bracket 12, thus cage 11 can move along the tooth bar of guide rail bracket 12, and motor 10 is arranged on cage 11 tops and moves with cage 11.Tumbler 16 comprises rope roll assembling 161.Steel rope 14 is hung on the head sheave 13; And an end of steel rope 14 is fixed in the rope roll assembling 161; Thereby can twine and be contained in the rope roll assembling 161; The other end of steel rope 14 is fixed on the counterweight body 15, thus counterweight body 15 do and the rightabout perpendicular movement of cage 11 operation along the counterweight slideway of guide rail bracket 12, thereby reduced the propulsive effort of motor 10.
Tachogenerator 30 is installed on the guide rail bracket 12, is used to calculate guide rail bracket 12 gears ingear number of teeth on the tooth bar of guide rail bracket 12 in a period of time, and sends this number of teeth to processing unit 20.Processing unit 20 is according to the moving velocity of the Tooth Number Calculation cage 11 in this known time section, that is, this number of teeth is the moving velocity of cage 11 divided by this known time.Alarm unit 50 judges whether this moving velocity exceeds this predetermined speed range, if then send prompt messages and shown by display unit 60.Therefore; Velocity anomaly appears in cage 11 when in a single day moving; Intelligent control system 100 will be before other fender guard (like anti-falling safety device) move; Force to break off motor and band-type brake power supply in advance, play the effect that prevents trouble before it happens, and have sound and light alarm and character image on display unit 60, to show the fault prompting.
LOAD CELLS 40 is installed in drive of motor plate 21 and is connected bearing pin 23 inside on the otic placode 22 with cage, is used for the stress of this bearing pin of sensing and produces the correspondent voltage value, and send this magnitude of voltage to signal transmitting device 70, carries out signal by signal transmitting device 70 and amplifies.This magnitude of voltage has characterized the real-time weight of cage 11, and the real-time weight of cage 11 comprises the weight and the load carrying ability of cage 11 itself.Therefore, these different magnitudes of voltage are represented the real-time weight of different cage 11, can be pre-formed a voltage weight contrast table through experiment thus.This voltage weight contrast table is stored in the processing unit 20 in advance, and therefore, processing unit 20 is tabled look-up in this voltage weight contrast table according to this magnitude of voltage can learn the real-time weight of cage 11.Alarm unit 50 judges that the real-time weight of cage 11 does not exceed this preset weight value, if then send prompt messages and shown by display unit 60.
Processing unit 20 is used to also to judge that the real-time weight of cage 11 belongs to preset underloading scope and still is in preset heavily loaded scope; When the real-time weight of judging cage 11 belongs to this preset underloading scope; 10 operations of motor of processing unit 20 controls; When the real-time weight of judging cage 11 belongs to this preset heavily loaded scope, 10 operations of two motors of processing unit 20 controls.The load of the electrode 10 in this embodiment is that the weight of cage 11 adds load carrying ability, deducts the weight of counterweight body 15 again.In other embodiments, can also do further division, be divided into zero load, underloading, heavy duty the real-time weight of cage 11; Correspondingly the quantity of motor 10 is not limited to two of this embodiment, can also be more, and Ru Santai; When being judged as zero load, move a motor 10; When being judged as underloading, move two motors 10; When being judged as heavy duty, move three motors 10.
Therefore, utilization intelligent control system 100 can reduce electric energy loss effectively.If by work every day 8 hours (according to observation, building operation uses the mode of operation of elevator 20040% to be underloading), 40% single machine operation, 0.8 yuan/degree of commercial power calculates, and can practice thrift 50 yuan of left and right sides electricity charge in theory.
In sum, the intelligent control system 100 that the utility model provides is through the setting of LOAD CELLS 40; Energy savings reduces the electric energy loss of equipment, and the text display through faulty condition has shortened the time of searching fault greatly simultaneously; Improve the efficient of maintenance and repair work, promoted the craftmanship of complete machine, and passed through the setting of tachogenerator 30; Velocity anomaly appears when in a single day cage 11 is moved; This control system will be forced to break off motor and band-type brake power supply before other fender guard (like anti-falling safety device) does not move in advance, played the effect that prevents trouble before it happens.So intelligent control system 100 can energy-conserving and environment-protective and can be made building operation have the preferable life-span with elevator 200.
The above is merely the preferred embodiment of the utility model; Not in order to restriction the utility model; Any modification of being done within all spirit and principles at the utility model, be equal to replacement and improvement etc., all should be included within the protection domain of the utility model.

Claims (4)

1. a building operation is with the intelligent control system of elevator; It comprises and is used to drive building operation with at least two motors of cage lifter lifting and the processing unit that electrically connects with these at least two motors; This building operation comprises guide rail bracket with tooth bar, has and the cage of the tooth bar gears in mesh of this guide rail bracket, the tumbler that is fixed on the bearing on this cage and articulates with this bearing with elevator; It is characterized in that; This intelligent control system also comprises respectively tachogenerator, LOAD CELLS and the alarm unit that electrically connects with this processing unit; This tachogenerator is installed on this cage and near the gear of this cage, this LOAD CELLS is installed in the drive of motor plate and is connected with cage on inner this tumbler of bearing pin and the pivot between this bearing on the otic placode.
2. building operation as claimed in claim 1 is characterized in that with the intelligent control system of elevator this intelligent control system also comprises the display unit that electrically connects with this processing unit.
3. building operation as claimed in claim 2 is characterized in that with the intelligent control system of elevator this display unit is a text display.
4. building operation as claimed in claim 1 is characterized in that with the intelligent control system of elevator this intelligent control system also comprises the signal transmitting device that is electrically connected between this LOAD CELLS and this processing unit.
CN2011202606304U 2011-07-22 2011-07-22 Intelligent control system of lifter used for building construction Expired - Fee Related CN202201597U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202606304U CN202201597U (en) 2011-07-22 2011-07-22 Intelligent control system of lifter used for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202606304U CN202201597U (en) 2011-07-22 2011-07-22 Intelligent control system of lifter used for building construction

Publications (1)

Publication Number Publication Date
CN202201597U true CN202201597U (en) 2012-04-25

Family

ID=45965731

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202606304U Expired - Fee Related CN202201597U (en) 2011-07-22 2011-07-22 Intelligent control system of lifter used for building construction

Country Status (1)

Country Link
CN (1) CN202201597U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103350939A (en) * 2013-07-03 2013-10-16 南通东之杰电气有限公司 Intelligent and sensing type construction hoist
CN104748900A (en) * 2013-12-30 2015-07-01 山东省建筑科学研究院 Detection and monitoring system and calculation method for load weight, bending moment and torque of double-layer operation platform in building construction
CN105819308A (en) * 2015-01-06 2016-08-03 义乌恒邦建筑智能科技有限公司 Rack type vertical elevator operation checking-controlling and positioning system
CN106629285A (en) * 2016-12-08 2017-05-10 上海电机学院 Elevator anti-falling system
CN112456269A (en) * 2020-11-25 2021-03-09 广州广日电梯工业有限公司 Intelligent braking system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103350939A (en) * 2013-07-03 2013-10-16 南通东之杰电气有限公司 Intelligent and sensing type construction hoist
CN103350939B (en) * 2013-07-03 2015-05-27 南通东之杰电气有限公司 Intelligent and sensing type construction hoist
CN104748900A (en) * 2013-12-30 2015-07-01 山东省建筑科学研究院 Detection and monitoring system and calculation method for load weight, bending moment and torque of double-layer operation platform in building construction
CN104748900B (en) * 2013-12-30 2016-12-07 山东省建筑科学研究院 Construction bilayer operating platform weight moment of flexure moment of torsion Inspection and monitoring system and computational methods
CN105819308A (en) * 2015-01-06 2016-08-03 义乌恒邦建筑智能科技有限公司 Rack type vertical elevator operation checking-controlling and positioning system
CN105819308B (en) * 2015-01-06 2018-04-13 义乌恒邦建筑智能科技有限公司 A kind of rack type vertical-lifting machine operation prosecution and alignment system
CN106629285A (en) * 2016-12-08 2017-05-10 上海电机学院 Elevator anti-falling system
CN112456269A (en) * 2020-11-25 2021-03-09 广州广日电梯工业有限公司 Intelligent braking system

Similar Documents

Publication Publication Date Title
CN202201597U (en) Intelligent control system of lifter used for building construction
CN2892780Y (en) Overload detection protector for rack and pinion driving construction lifting machine
CN203382437U (en) Winch cable traction displacement sensing and monitoring device
CN202912529U (en) Loading elevator capable of vertically ascending and descending
CN101462665A (en) Elevator safety level apparatus with multiple startup modes
CN209367594U (en) A kind of building fire protection facility detection elevator fault detection means
CN212924224U (en) Comprehensive protection device for blast furnace winding feeding system
CN203048373U (en) Small machine room elevator guide wheel protective cover structure
CN205772576U (en) A kind of novel limiter of speed safety tongs puies forward pull test instrument
CN205294536U (en) Elevator device to limit speed
CN201322661Y (en) Test device of tension precision of switch machine
CN103991802A (en) Large tower crane capable of carrying driver
CN203806896U (en) Whole-course safe device against slack rope
CN201486389U (en) Flexible lifting door
CN202785315U (en) Big wheeled crane
CN101665208A (en) Machine-room-less elevator counterweight traction device
CN202400743U (en) Slip-preventing device for crane
CN206574382U (en) A kind of electrical control system of crane apparatus for demonstrating
CN108335613A (en) A kind of electrical control system of crane apparatus for demonstrating and its application method
CN203373053U (en) Winch speed monitoring device
CN111910979A (en) 5G communication signal tower is with maintenance equipment
CN201089687Y (en) Large spanning steel tower elevator
CN201791750U (en) Guide device of sheet rolling mill
CN201517008U (en) Counterweight driving traction device of elevator without machine room
CN204490248U (en) A kind of improved type elevator safety tongs shift mechanism

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120425

Termination date: 20160722