CN202195580U - Water-saving energy-saving gas water heater - Google Patents

Water-saving energy-saving gas water heater Download PDF

Info

Publication number
CN202195580U
CN202195580U CN2011202875067U CN201120287506U CN202195580U CN 202195580 U CN202195580 U CN 202195580U CN 2011202875067 U CN2011202875067 U CN 2011202875067U CN 201120287506 U CN201120287506 U CN 201120287506U CN 202195580 U CN202195580 U CN 202195580U
Authority
CN
China
Prior art keywords
water
hydraulic pressure
ing
coil
heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202875067U
Other languages
Chinese (zh)
Inventor
李欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011202875067U priority Critical patent/CN202195580U/en
Application granted granted Critical
Publication of CN202195580U publication Critical patent/CN202195580U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a water-saving energy-saving gas water heater, which can shorten the time for waiting for hot water flowing out from a water outlet tube and facilitates water resource and gas resource saving. The gas water heater is mainly formed by setting a preheating system on the basis of the prior art, and the preheating system comprises a heating device for heating a heating coil and a preheating system switch for controlling the opening and closing of the heating device. The preheating system can preheat the water in the heating coil before a water outlet valve on a water outlet tube is opened, and when the water outlet valve is opened, the hot water can flow out quickly from the water outlet tube, thereby remarkably shortening the time for waiting for hot water to flow out. Even hot water can directly flow out from the water outlet tube so as to facilitate water resource and gas resource saving. Further, the gas water heater can improve the safety in using the preheating system by setting a water storage box, a water pressure indicating device and the like.

Description

The gas heater of saving water and energy
Technical field
The utility model relates to a kind of Mousehold water saving energy-saving gas water heater.
Background technology
Water inlet pipe, heat(ing) coil and outlet pipe that the domestic gas-fired water heater of prior art generally comprises shell and links to each other successively; Be connected with outlet valve on the outlet pipe; Also comprise aqueous vapor interlock igniting heating system; Above-mentioned aqueous vapor interlock igniting heating system comprises the igniting heating system and is used to control the aqueous vapor linked switch that the igniting heating system opens and closes that above-mentioned igniting heating system generally comprises gas inlet pipe, the magnetic valve of installing on the gas inlet pipe; The burner that the end of gas inlet pipe is provided with also comprises electromagnet, igniter and power supply.Above-mentioned electromagnet, igniter and power supply form ignition circuit, and this ignition circuit is by the control of aqueous vapor linked switch, after the outlet valve on the outlet pipe is unlocked; Water continues to flow out, and the aqueous vapor linked switch is opened and made ignition circuit closed, and at this moment electromagnet is switched on and magnetic valve is opened; Combustion gas can get into burner through gas inlet pipe; Meanwhile igniter makes burner operation through igniting, and the flame that burner produces continues heating to heat(ing) coil, makes the water temperature that outlet pipe flows out raise gradually.Not enough below above-mentioned domestic gas-fired water heater exists: in a period of time behind the unlatching outlet valve; Though burner heats heat(ing) coil; But the water temperature that outlet pipe flows out is still lower; This part water at low temperature generally is not used, but directly emits, thus the waste of the water resource of causing and gas energy; In addition, can know that just can flow out the higher water of temperature from outlet pipe after need waiting for a period of time, if in the winter time, this section stand-by period is longer from above-mentioned analysis.
The utility model content
The technical problem that the utility model solves provides a kind of the shortening and is used to wait for the gas heater of saving water and energy that flows out the time of hot water in the outlet pipe.
The utility model solves the technical scheme that its technical problem adopted: the gas heater of saving water and energy; Comprise shell; Water inlet pipe; Heat(ing) coil, outlet pipe and aqueous vapor interlock igniting heating system, said aqueous vapor interlock igniting heating system comprises the igniting heating system and is used to control the aqueous vapor linked switch that the igniting heating system opens and closes; Also comprise the system of preheating, the said system that preheats comprises the system switching that preheats that is used for the heater that heat(ing) coil is heated and is used to control the heater keying.
Further be: said heater comprises said igniting heating system, and said to preheat system switching parallelly connected with said aqueous vapor linked switch.
Further be: also comprise pressure switch; Said pressure switch comprises pressure detecting control part and the microswitch portion that is opened and closed by the control of pressure detecting control part; The pressure detecting control part of said pressure switch links to each other with said water inlet pipe, and the microswitch portion of said pressure switch connects with the said system switching that preheats.
Further be: the said system switching that preheats is a delay switch.
Further be: the temperature sensor that also comprises temperature controller and be used to detect the temperature of heat(ing) coil, the input of said temperature controller is electrically connected with temperature sensor, the output of said temperature controller with preheat system switching and be electrically connected.
Further be: be connected with storage tank between said water inlet pipe and the heat(ing) coil, said storage tank comprises the delivery port that links to each other with heat(ing) coil, and the water side of said water inlet pipe is positioned at the inside of storage tank and is higher than the delivery port of said storage tank.
Further be: the end face of the water side of said water inlet pipe is higher than the end face of said heat(ing) coil.
Further be: on the said storage tank liquid level gauge is installed, said shell is provided with the liquid level gauge observation window that is used to observe liquid level gauge.
Further be: be connected with the hydraulic pressure indicating device on the said water inlet pipe, said shell is provided with the hydraulic pressure observation window that is used to observe the hydraulic pressure indicating device.
Further be: said hydraulic pressure indicating device comprises that the hydraulic pressure that links to each other with water inlet pipe detects arm; Said hydraulic pressure detects in the arm and is provided with flexible sheet; The inner chamber of said hydraulic pressure detection arm is separated to form two chambers of mutual isolation by flexible sheet; Said two chambers are respectively intake antrum that is communicated with water inlet pipe and the indication chamber that isolates with intake antrum; Said indication is provided with the indicator collet that links to each other with flexible sheet in the chamber, and said indicator collet is provided with the qualified indicator of hydraulic pressure, and the tube wall that said hydraulic pressure detects arm is provided with the hydraulic pressure indicating window; When the qualified indicator of hydraulic pressure was positioned at the visual range of hydraulic pressure indicating window, the elastic deformation amount that flexible sheet takes place under the effect of hydraulic pressure was more than or equal to predetermined value.
The beneficial effect of the utility model is:
1,, before can the outlet valve on outlet pipe opening, earlier the water in the heat(ing) coil is preheated through heater is set; So on the one hand after outlet valve is opened; Outlet pipe can flow out hot water fast, significantly shortens the time that is used to wait for the hot water outflow, even can directly flow out hot water from outlet pipe; And gas energy is fully used, help conserve water resource and gas energy like this; On the other hand after heater stop is to the heat(ing) coil heating; Heat(ing) coil still keeps higher temperature; Outlet valve through opening on the outlet pipe can make the igniting heating system continue heat(ing) coil is heated; Make through the current of heat(ing) coil can be timely and lasting be heated to suitable serviceability temperature, the sometimes hot and sometimes cold situation of current that outlet pipe flows out can not appear;
2, said heater comprises said igniting heating system; It is said that to preheat system switching parallelly connected with said aqueous vapor linked switch; Adopt said structure can make full use of the structure of gas heater of the prior art, need not gas heater of the prior art is carried out large-scale redevelopment, both helped reducing production costs; Also help making the compact conformation of gas heater, be convenient to install and use;
3, through using delay switch, can realize closing automatically the system of preheating as required to controlling the heat time heating time that preheats system;
4, through serviceability temperature sensor and temperature controller; Can preestablish closing temperature; When the temperature of heat(ing) coil reaches closing temperature; Temperature controller preheats system switching through the signal at stop of temperature sensor, can realize that just will preheat system according to preset closing temperature closes automatically;
5, when anhydrous when supplying with gas heater and using in the water inlet pipe; When just cutting off the water; Through storage tank is set, make the water side of water inlet pipe be positioned at the inside of storage tank and be higher than the delivery port of said storage tank, the water in the heat(ing) coil can not flow backwards back into water pipe fully; Can guarantee that the system that preheats can not carry out sky to heat(ing) coil and burn; Above-mentioned empty the burning is exactly when having water in the heat(ing) coil heat(ing) coil not to be heated, because empty burning might be damaged heat(ing) coil and bring potential safety hazard, therefore should avoid empty as far as possible and burn;
6, the end face of the water side of said water inlet pipe is higher than the end face of said heat(ing) coil; Like this when anhydrous when supplying with gas heater and using in the water inlet pipe; Can guarantee effectively that also the most of space in the heat(ing) coil is full of water, when heat(ing) coil is preheated, be difficult for heat(ing) coil is caused damage;
7, through liquid level gauge and liquid level gauge observation window are set; Can in time observe the water level in the storage tank; Can judge the water yield that stores in the heat(ing) coil according to the water level in the storage tank, also can judge whether to cut off the water, can be convenient to judge whether to use the system that preheats of gas heater like this according to actual conditions;
8, through pressure switch or hydraulic pressure indicating device are set, can guarantee when hydraulic pressure satisfies instructions for use, to preheat again, help guaranteeing heat(ing) coil is carried out pre-warmed security.
Description of drawings
Fig. 1 is the schematic diagram of the gas heater of saving water and energy of the utility model;
Fig. 2 is that the position of water inlet pipe, storage tank and heat(ing) coil concerns sketch map;
Fig. 3 is that the position of flexible sheet, indicator collet, the qualified indicator of hydraulic pressure and hydraulic pressure indicating window concerns sketch map.
Be labeled as among the figure: the 1-burner, the 2-igniter, the 3-magnetic valve, the 4-power supply, the 5-temperature controller, 6-preheats system switching; 7-aqueous vapor linked switch, 8-outlet valve, 9-outlet pipe, 10-heat(ing) coil, 11-temperature sensor, 12-water inlet pipe; The 13-heating system of lighting a fire, 14-storage tank, 15-water side, 16-delivery port, 17-shell, 18-liquid level gauge; 19-liquid level gauge observation window, 20-end face, 21-end face, 22-gas inlet pipe, 23-electromagnet, 24-pressure detecting control part; 25-microswitch portion, 26-hydraulic pressure indicating device, 27-hydraulic pressure observation window, 28-hydraulic pressure indicating window, 29-hydraulic pressure detects arm, 30-flexible sheet; The 31-intake antrum, 32-indicates the chamber, 33-indicator collet, the defective indicator of 34-hydraulic pressure, the qualified indicator of 35-hydraulic pressure.
The specific embodiment
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is further specified.
As shown in Figure 1, the gas heater of saving water and energy of the utility model comprises shell 17; Water inlet pipe 12; Heat(ing) coil 10, outlet pipe 9 and aqueous vapor interlock igniting heating system, said aqueous vapor interlock igniting heating system comprises igniting heating system 13 and is used to control the aqueous vapor linked switch 7 that igniting heating system 13 opens and closes; Also comprise the system of preheating, the said system that preheats comprises and is used for the heater of heat(ing) coil heating and is used to control that heater opens and closes preheats system switching 6.
During use, open heater, heat(ing) coil 10 is preheated through heater through preheating system switching 6; After water in the coil pipe 10 to be heated is heated to suitable temperature; Can close heater through preheating system switching 6, the normal use of method for using according to gas heater of the prior art gets final product then, because the water in the heat(ing) coil 10 is heated in advance; Therefore have only the lower water of a small amount of temperature to flow out from outlet pipe 9; After this part water flowed out, water subsequently was the hot water of the higher suitable use of temperature, can significantly shorten the time that is used to wait for the hot water outflow like this; Conserve water resource and gas energy; On the other hand after heater stop is to the heat(ing) coil heating; Heat(ing) coil still keeps higher temperature; Outlet valve through opening on the outlet pipe can make the igniting heating system continue heat(ing) coil is heated; Make through the current of heat(ing) coil can be timely and lasting be heated to suitable serviceability temperature, the sometimes hot and sometimes cold situation of current that outlet pipe flows out can not appear.
The set-up mode of above-mentioned heater has multiple, and a cover heater for example can be set separately in the shell 17 of gas heater, and this heater can be flue; Feed high-temperature flue gas in this flue, make heat(ing) coil 10 heating, preheat system switching 6 accordingly for being installed in the control valve on the flue through the heat exchange between flue and the heat(ing) coil 10; After control valve is opened; Flue gas can flow in flue, and after control valve was closed, flue gas can't flow; Above-mentioned heater also can be a cover gas heating system, just in the prior art the gas heater another set of gas heating system is installed again, and the flame that produces through combustion gas heats heat(ing) coil 10.But the above-mentioned mode that a cover heater is set separately can make the internal structure of gas heater complicated, installs and the maintenance inconvenience.As shown in Figure 1, for simplified structure, be easy for installation and maintenance; Also in order to reduce production costs, said heater comprises said igniting heating system 13, and said to preheat system switching 6 parallelly connected with said aqueous vapor linked switch 7; Just can use igniting heating system 13 of the prior art as above-mentioned heater, preheat system switching 6 and the said aqueous vapor linked switch 7 parallelly connected keyings of controlling heater with above-mentioned then, for example shown in Fig. 1; Above-mentioned igniting heating system 13 comprises the structure in the frame of broken lines among Fig. 1, just comprises power supply 4, electromagnet 23; Igniter 2, gas inlet pipe 22, magnetic valve 3 and burner 1.Adopt aforesaid way to control igniting heating systems 13 through the above-mentioned system switching 6 that preheats, after preheating system switching 6 unlatchings, power supply 4 gives electromagnet 23 energisings; Electromagnet 23 is opened the magnetic valve 3 on the gas inlet pipe 22, and combustion gas can get into burner 1, and burner 1 can heat heat(ing) coil 10 after lighting a fire through igniter 2; After heat(ing) coil 10 heats a period of times; Can close preheating system switching 6, magnetic valve 3 cuts out thereupon, thereby makes burner 1 stop heat(ing) coil 10 heating; Open the outlet valve 8 on the outlet pipe 9 then; Aqueous vapor linked switch 7 is opened thereupon, makes power supply 4 give electromagnet 23 energisings again, impels magnetic valve 3 to open; Burner 1 begins heat(ing) coil 10 is heated under the effect of igniter 2, and outlet pipe 9 flows out just sustainable outflow behind the lower water of a small amount of temperature and is fit to the higher water of temperature that uses.
On the basis of the above; In order to guarantee that heat(ing) coil is carried out pre-warmed security; Also comprise pressure switch; Said pressure switch comprises pressure detecting control part 24 and the microswitch portion 25 that is opened and closed by 24 controls of pressure detecting control part, and the pressure detecting control part 24 of said pressure switch links to each other with said water inlet pipe 12, and the microswitch portion 25 of said pressure switch connects with the said system switching 6 that preheats.Above-mentioned pressure switch is a pressure switch of the prior art; Pressure switch of the prior art generally comprises continuous pressure detecting control part 24 and microswitch portion 25; Pressure detecting control part 24 generally comprises pressure sensing spare and control piece; Pressure sensing spare produces signal through hydraulic pressure, and this signal passes to control piece, and control piece is controlled the keying of microswitch portion 25 according to this signal.During use; As shown in Figure 1, when the hydraulic pressure in the water inlet pipe satisfies instructions for use, the microswitch portion 25 of pressure switch will preheat system switching 6 and connect with igniting heating system 13; At this moment can be through preheating system switching 6 control igniting heating systems 13; When the hydraulic pressure in the water inlet pipe does not satisfy instructions for use, the microswitch portion 25 of pressure switch will preheat system switching 6 and break off with igniting heating system 13, at this moment preheat system switching 6 uncontrollable igniting heating systems 13.Can know to have only when hydraulic pressure satisfies instructions for use through above-mentioned analysis, just can preheat, therefore can guarantee heat(ing) coil is carried out pre-warmed security heat(ing) coil.
The above-mentioned system switching 6 that preheats can be common switch, but needs manually-operated to preheat the opening and closing of system switching 6 like this, and in order to realize preheating closing automatically of system switching 6, the said system switching 6 that preheats is delay switch.Delay switch can be set one time-delay closing period according to actual needs; This section period has pass the back delay switch and can close automatically; Thereby realize preheating closing automatically of system switching 6, so only need artificial unlatching preheat system switching 6, need not manual work and close and preheat system switching 6.Above-mentioned delay switch can use acoustic control formula delay switch commonly used in the prior art or touch delay switch etc., and the acoustic control formula is just controlled the unlatching of delay switch, the touch unlatching of just controlling delay switch through touch manner through sound.
In order to make the water in the heat(ing) coil 10 preheated to suitable serviceability temperature; On the basis of the above; As shown in Figure 1; The temperature sensor 11 that also comprises temperature controller 5 and be used to detect the temperature of heat(ing) coil 10, the input of said temperature controller 5 is electrically connected with temperature sensor 11, the output of said temperature controller 5 with preheat system switching 6 and be electrically connected.Temperature sensor 11 can detect the temperature of heat(ing) coil 10; After the temperature of heat(ing) coil 10 reaches suitable serviceability temperature; Temperature sensor 11 can send temperature signal and give temperature controller 5; Temperature controller 5 will preheat system switching 6 according to this signal and cut out, and then stop heat(ing) coil 10 is preheated.
Burn in order to help avoiding above-mentioned heater that heat(ing) coil 10 is carried out sky; Be connected with storage tank 14 between said water inlet pipe 12 and the heat(ing) coil 10; Said storage tank 14 comprises the delivery port 16 that links to each other with heat(ing) coil 10, and the water side 15 of said water inlet pipe 12 is positioned at the inside of storage tank 14 and is higher than the delivery port 16 of said storage tank 14.Through storage tank is set; Make the water side of water inlet pipe be positioned at the inside of storage tank and be higher than the delivery port of said storage tank; When in the water inlet pipe during anhydrous the supply; Water in the heat(ing) coil can not flow backwards back into water pipe fully, just still can keep a certain amount of water in the heat(ing) coil, can make the system of preheating can not carry out sky to heat(ing) coil like this and burn.
Though can making the system of preheating can not carry out sky to heat(ing) coil, burns said structure; But because the surplus water in the heat(ing) coil might be less; When therefore heat(ing) coil being preheated, heat(ing) coil might be heated to very high temperature, so also might cause the damage of heat(ing) coil; In order to overcome above-mentioned defective, the end face 20 of the water side 15 of said water inlet pipe 12 is higher than the end face 21 of said heat(ing) coil 10.The principle of said structure and communicating pipe is similar; The interior water of the following back of end face storage tank that water level in the storage tank drops to the water inlet end of water inlet pipe can't pass back into water inlet pipe again; And storage tank is communicated with heat(ing) coil; Make the water level in the heat(ing) coil can be tending towards identical with water level in the storage tank, again because the end face 20 of the water side 15 of water inlet pipe 12 is higher than the end face 21 of said heat(ing) coil 10, this just makes that heat(ing) coil 10 is interior and can keep higher water level; Most of space that just can guarantee heat(ing) coil 10 is full of water, can prevent effectively that therefore heat(ing) coil 10 is preheated to very high temperature.
In order can the water level real-time monitoring in the storage tank 14 to be guaranteed heat(ing) coil 10 is carried out pre-warmed security, as shown in Figure 2, on the said storage tank 14 liquid level gauge 18 is installed, said shell 17 is provided with the liquid level gauge observation window 19 that is used to observe liquid level gauge 18.Can observe liquid level gauge 18 through liquid level gauge observation window 19, liquid level gauge 18 can demonstrate the water level in the storage tank 14.Height through the water level in the storage tank 14 can judge whether to be fit to heat(ing) coil 10 is preheated.
In addition,, can on said water inlet pipe 12, connect hydraulic pressure indicating device 26, on shell 17, be provided for observing the hydraulic pressure observation window 27 of hydraulic pressure indicating device 26 in order to guarantee that heat(ing) coil is carried out pre-warmed security.Can observe the hydraulic pressure value on the hydraulic pressure indicating device 26 through hydraulic pressure observation window 27; And then can judge whether hydraulic pressure satisfies instructions for use, if satisfy instructions for use, just hydraulic pressure is enough big; Again heat(ing) coil is preheated, can guarantee like this heat(ing) coil is carried out pre-warmed security.Above-mentioned hydraulic pressure indicating device 26 can be water pressure gauge.Because the mode of the indication hydraulic pressure of water pressure gauge of the prior art is comparatively complicated; Oversimplify in order to make the hydraulic pressure indication; Be convenient to judge fast whether hydraulic pressure satisfies instructions for use; Said hydraulic pressure indicating device 26 comprises that the hydraulic pressure that links to each other with water inlet pipe 12 detects arm 29, and said hydraulic pressure detects in the arm 29 and is provided with flexible sheet 30, and the inner chamber of said hydraulic pressure detection arm 29 is separated to form two chambers of mutual isolation by flexible sheet 30; Said two chambers are respectively intake antrum 31 that is communicated with water inlet pipe 12 and the indication chamber 32 that isolates with intake antrum 31; Be provided with the indicator collet 33 that links to each other with flexible sheet 30 in the said indication chamber 32, said indicator collet 33 is provided with the qualified indicator 35 of hydraulic pressure, and the tube wall that said hydraulic pressure detects arm 29 is provided with hydraulic pressure indicating window 28; When the qualified indicator 35 of hydraulic pressure was positioned at the visual range of hydraulic pressure indicating window 28, the elastic deformation amount that flexible sheet 30 takes place under the effect of hydraulic pressure was more than or equal to predetermined value.Above-mentioned predetermined value is the hydraulic pressure elastic deformation amount's that flexible sheet takes place under the hydraulic pressure effect when just satisfying instructions for use a value; The elastic deformation amount of flexible sheet is during more than or equal to predetermined value; Hydraulic pressure satisfies instructions for use certainly; At this moment the qualified indicator of hydraulic pressure is positioned at the visual range of hydraulic pressure indicating window, just can observe the qualified indicator of hydraulic pressure from the hydraulic pressure indicating window.For example shown in Figure 3, the top of indicator collet 33 is provided with qualified indicator 35 of hydraulic pressure and the defective indicator 34 of hydraulic pressure, is the qualified indicator 35 of hydraulic pressure between defective indicator 34 of hydraulic pressure and the flexible sheet 30; The top of indicator collet 33 is a hydraulic pressure indicating window 28, and when the water in the intake antrum 31 made flexible sheet 30 to indication chamber 32 direction generation strains, indicator collet 33 was moved under the drive of flexible sheet 30; If at this moment hydraulic pressure is not enough; Then the elastic deformation amount of flexible sheet 30 can only observe the defective indicator 34 of hydraulic pressure from hydraulic pressure indicating window 28, when hydraulic pressure satisfies instructions for use less than above-mentioned predetermined value; The elastic deformation amount of flexible sheet 30 is more than or equal to predetermined value; Can observe the qualified indicator 35 of hydraulic pressure from hydraulic pressure indicating window 28, can find out thus, if can observe the qualified indicator 35 of hydraulic pressure from hydraulic pressure indicating window 28; Explain that then hydraulic pressure satisfies instructions for use, at this moment heat(ing) coil is preheated safer.In addition, the defective indicator 34 of above-mentioned hydraulic pressure is provided with in order to observe convenient, that is to say that the defective indicator 34 of above-mentioned hydraulic pressure also can not be provided with, and can't observe the qualified indicator 35 of hydraulic pressure from hydraulic pressure indicating window 28 and just explain that hydraulic pressure does not satisfy instructions for use.Further be; Can be on the end face of indicator collet 33 with flexible sheet 30 adjacent areas colored green pigment as the qualified indicator 35 of hydraulic pressure; 35 exterior lateral area colored red pigment are as the defective indicator 34 of above-mentioned hydraulic pressure in the qualified indicator of hydraulic pressure; This set mode is comparatively easy, also is convenient to observe.

Claims (10)

1. the gas heater of saving water and energy; Comprise shell (17); Water inlet pipe (12); Heat(ing) coil (10), outlet pipe (9) and aqueous vapor interlock igniting heating system, said aqueous vapor interlock igniting heating system comprises igniting heating system (13) and is used for the aqueous vapor linked switch (7) that control igniting heating system (13) opens and closes; It is characterized in that: also comprise the system of preheating, the said system that preheats comprises and is used for the heater of heat(ing) coil (10) heating and is used to control that heater opens and closes preheats system switching (6).
2. the gas heater of saving water and energy as claimed in claim 1 is characterized in that: said heater comprises said igniting heating system (13), and said to preheat system switching (6) parallelly connected with said aqueous vapor linked switch (7).
3. the gas heater of saving water and energy as claimed in claim 2; It is characterized in that: also comprise pressure switch; Said pressure switch comprises pressure detecting control part (24) and the microswitch portion (25) that is opened and closed by pressure detecting control part (24) control; The pressure detecting control part (24) of said pressure switch links to each other with said water inlet pipe (12), and the microswitch portion (25) of said pressure switch connects with the said system switching (6) that preheats.
4. like claim 1, the 2 or 3 described gas heaters of saving water and energy, it is characterized in that: the said system switching (6) that preheats is a delay switch.
5. like claim 1, the 2 or 3 described gas heaters of saving water and energy; It is characterized in that: the temperature sensor (11) that also comprises temperature controller (5) and be used to detect the temperature of heat(ing) coil (10); The input of said temperature controller (5) is electrically connected with temperature sensor (11), the output of said temperature controller (5) with preheat system switching (6) and be electrically connected.
6. like claim 1, the 2 or 3 described gas heaters of saving water and energy; It is characterized in that: be connected with storage tank (14) between said water inlet pipe (12) and the heat(ing) coil (10); Said storage tank (14) comprises the delivery port (16) that links to each other with heat(ing) coil (10), and the water side (15) of said water inlet pipe (12) is positioned at the inside of storage tank (14) and is higher than the delivery port (16) of said storage tank (14).
7. the gas heater of saving water and energy as claimed in claim 6 is characterized in that: the end face (20) of the water side (15) of said water inlet pipe (12) is higher than the end face (21) of said heat(ing) coil (10).
8. the gas heater of saving water and energy as claimed in claim 6 is characterized in that: liquid level gauge (18) is installed on the said storage tank (14), and said shell (17) is provided with the liquid level gauge observation window (19) that is used to observe liquid level gauge (18).
9. the gas heater of saving water and energy as claimed in claim 1 is characterized in that: be connected with hydraulic pressure indicating device (26) on the said water inlet pipe (12), said shell is provided with the hydraulic pressure observation window (27) that is used to observe hydraulic pressure indicating device (26).
10. the gas heater of saving water and energy as claimed in claim 9; It is characterized in that: said hydraulic pressure indicating device (26) comprises that the hydraulic pressure that links to each other with water inlet pipe (12) detects arm (29); Said hydraulic pressure detects in the arm (29) and is provided with flexible sheet (30); The inner chamber of said hydraulic pressure detection arm (29) is separated to form two chambers of mutual isolation by flexible sheet (30); Said two chambers are respectively intake antrum (31) that is communicated with water inlet pipe (12) and the indication chamber (32) that isolates with intake antrum (31); Be provided with the indicator collet (33) that links to each other with flexible sheet (30) in the said indication chamber (32), said indicator collet (33) is provided with the qualified indicator of hydraulic pressure (35), and the tube wall that said hydraulic pressure detects arm (29) is provided with hydraulic pressure indicating window (28); When the qualified indicator of hydraulic pressure was positioned at the visual range of hydraulic pressure indicating window (28), the elastic deformation amount that flexible sheet (30) takes place under the effect of hydraulic pressure was more than or equal to predetermined value.
CN2011202875067U 2011-08-09 2011-08-09 Water-saving energy-saving gas water heater Expired - Fee Related CN202195580U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202875067U CN202195580U (en) 2011-08-09 2011-08-09 Water-saving energy-saving gas water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202875067U CN202195580U (en) 2011-08-09 2011-08-09 Water-saving energy-saving gas water heater

Publications (1)

Publication Number Publication Date
CN202195580U true CN202195580U (en) 2012-04-18

Family

ID=45950485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202875067U Expired - Fee Related CN202195580U (en) 2011-08-09 2011-08-09 Water-saving energy-saving gas water heater

Country Status (1)

Country Link
CN (1) CN202195580U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104236066A (en) * 2013-06-21 2014-12-24 青岛经济技术开发区海尔热水器有限公司 Water heater
WO2019015628A1 (en) * 2017-07-21 2019-01-24 苏强 Water-saving, power-saving and time-saving electric heating faucet
CN109579311A (en) * 2018-12-29 2019-04-05 沈炜 Water heater saves water conduit
CN110425743A (en) * 2019-07-25 2019-11-08 广东万家乐燃气具有限公司 A kind of gas and hot water equipment of band expansion gas tank
CN112283932A (en) * 2020-10-19 2021-01-29 杭州墙镪科技有限公司 Heat exchanger device of household water heater with real-time hot water

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104236066A (en) * 2013-06-21 2014-12-24 青岛经济技术开发区海尔热水器有限公司 Water heater
WO2019015628A1 (en) * 2017-07-21 2019-01-24 苏强 Water-saving, power-saving and time-saving electric heating faucet
CN109579311A (en) * 2018-12-29 2019-04-05 沈炜 Water heater saves water conduit
CN110425743A (en) * 2019-07-25 2019-11-08 广东万家乐燃气具有限公司 A kind of gas and hot water equipment of band expansion gas tank
CN112283932A (en) * 2020-10-19 2021-01-29 杭州墙镪科技有限公司 Heat exchanger device of household water heater with real-time hot water

Similar Documents

Publication Publication Date Title
CN202195580U (en) Water-saving energy-saving gas water heater
CN102109220B (en) Instant-heating air source water heater and control method thereof
CN201875806U (en) Dual-purpose wall-hung furnace for plate-type heat exchanger
CN202032728U (en) Step water gradually heating intelligent double-bladder electromagnetic water heater
CN201837077U (en) Novel energy-saving two-purpose wall-mounted gas boiler
CN207674732U (en) A kind of gas-heating water heater with energy saver mode
CN202660755U (en) Gas water heater
CN210220200U (en) Pressure starting circulating wall-mounted gas water heater
CN204187804U (en) Full-automatic instant boiling type gas burning water heater
CN201874529U (en) Control system for well-mouth fuel-gas heating furnace
CN203709817U (en) Pipeline machine
CN208349558U (en) Based on computer-controlled water boiler
CN202032756U (en) Crude oil heating furnace with automatic control temperature
CN203190605U (en) Constant temperature water supply system for water heater
CN2708175Y (en) Gas and electricity dual-purpose oil well pipeline heating furnace
CN205208937U (en) Integrated form gas is from hot -water tank
CN204254878U (en) A kind of electric automatization gas fired-boiler
CN109668181A (en) A kind of multifunction burning oil vapour energy-saving stove
CN218179230U (en) Gas wall-mounted furnace provided with sleeve heat exchanger
CN219995557U (en) Domestic boiler
CN213577418U (en) Energy-saving gas steam generator
CN2559926Y (en) Instant boiling electric water heater
CN208154802U (en) Gas heater
CN210861036U (en) Full-premixing steam boiler
CN208720365U (en) A kind of plug and play boiled water machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120418

Termination date: 20130809