CN202194669U - 一种tbm撑靴的改进结构 - Google Patents
一种tbm撑靴的改进结构 Download PDFInfo
- Publication number
- CN202194669U CN202194669U CN2011203126499U CN201120312649U CN202194669U CN 202194669 U CN202194669 U CN 202194669U CN 2011203126499 U CN2011203126499 U CN 2011203126499U CN 201120312649 U CN201120312649 U CN 201120312649U CN 202194669 U CN202194669 U CN 202194669U
- Authority
- CN
- China
- Prior art keywords
- supporting shoe
- tbm
- rock
- support boots
- arc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本实用新型公开了一种TBM撑靴的改进结构,涉及一种隧道掘进机,包括主梁、撑靴、水平油缸,所述撑靴两翼设有与撑靴表面弧度一致的弧形板且弧形板的外弧面与撑靴外弧面平齐。本实用新型通过在撑靴两翼设置相应的弧形板,增加弧形板与岩面的共同作用,首先大大降低TBM掘进过程中撑靴部位的围岩单位面积上承受的撑靴压力,减小撑靴工作时围岩内部应力的二次调整幅度,降低岩爆区及围岩破碎地层中撑靴部位围岩发生岩爆、塌方的几率,明显提高TBM在岩爆区和破碎地层中设备的适应性和掘进效率,其次在高硬度围岩中掘进,TBM需要较大推进力掘进时,大大降低了撑靴表面单位面积上承受的围岩反作用力,避免了撑靴的变形损坏。
Description
技术领域
本实用新型涉及一种隧道掘进机(TBM),尤其涉及一种开敞式硬岩隧道掘进机(TBM)上的撑靴的改进结构。
背景技术
目前,随着掘进机技术的发展,一些超大直径的硬岩掘进机逐步出现,并在一些地质复杂的隧洞工程中应用,这对TBM在复杂地质中掘进的适应性提出了较高的要求;尤其是在高地应力潜在岩爆区、软弱破碎地层以及硬度较大的围岩中掘进,如何从设备方面降低TBM掘进对围岩的扰动,减少围岩塌方、岩爆以及TBM设备自身损坏等风险,值得设备生产商及工程建设各方研究和探索。
如附图1和附图2所示,现有的TBM主要包括:刀盘1、护盾2、主梁3、推进油缸4、撑靴5、水平油缸6 等部件。
在掘进过程中,TBM撑靴5通过水平油缸6施加一定的力撑紧洞壁,利用撑靴5与洞壁间的摩阻力,并通过推进油缸4的作用,提供TBM向前掘进的推进力。
但现有的设备,在岩爆区、软弱破碎地层和硬度较大的围岩中掘进,主要存在以下问题:
1、大直径的TBM需要强大的推进力方能保证TBM的正常推进,这就需要更大的水平撑靴压力使撑靴能提供足够的摩阻力,但在岩爆区掘进,较大的撑靴压力作用于围岩上易导致围岩内部应力的二次大幅度调整,往往诱发撑靴部位围岩发生岩爆,当遇见软弱破碎地层时,也会导致撑靴部位围岩的塌方,对设备和人员造成损伤,增加底拱的清碴量,影响TBM的掘进进度。
2、在硬度较大的围岩中掘进,TBM需要的推进力增大,为保证TBM的正常掘进势必增加撑靴压力,以增大撑靴摩阻力,然而现有的撑靴设备刚度不足,在撑靴与围岩接触的部位稍有不平整的情况时,撑靴的表面易发生变形损坏。
实用新型内容
针对上述现有技术,本实用新型要解决的技术问题是提供一种适应于岩爆区、软弱破碎地层和硬度较大的围岩中掘进,减少岩爆、塌方以及撑靴变形而且提高掘进速度的TBM撑靴的改进结构。
为了解决上述技术问题,本实用新型采用如下技术方案:一种TBM撑靴的改进结构,包括主梁、撑靴、水平油缸,所述撑靴两翼设有与撑靴表面弧度一致的弧形板且弧形板的外弧面与撑靴外弧面平齐。
进一步地,所述弧形板为钢板,其与撑靴间为焊接平顺对接。
进一步地,所述弧形板的弧长与撑靴的弧长一致。
进一步地,所述弧形板的内弧面与撑靴间间隔设置多块加强筋板。
进一步地,所述加强筋板为钢板且为直角三角形状,两直角边分别与撑靴侧面和弧形板内弧面焊接固定。
与现有技术相比,本实用新型具有以下有益效果:通过在撑靴两翼设置相应的弧形板,增加弧形板与岩面的共同作用,具有如下优点:
1、大大降低TBM掘进过程中撑靴部位的围岩单位面积上承受的撑靴压力,减小撑靴工作时围岩内部应力的二次调整幅度,降低岩爆区及围岩破碎地层中撑靴部位围岩发生岩爆、塌方的几率,明显提高TBM在岩爆区和破碎地层中设备的适应性和掘进效率。
2、在高硬度围岩中掘进,TBM需要较大推进力掘进时,大大降低了撑靴表面单位面积上承受的围岩反作用力,避免了撑靴的变形损坏。
附图说明
图1为现有的隧道掘进机的结构示意图;
图2为图1的A-A剖视图;
图3为本实用新型实施例的结构示意图;
图4为图3的A-A剖视图;
图5为图4的B-B剖视图。
具体实施方式
下面将结合附图及具体实施方式对本实用新型作进一步的描述。
参见图3~图5,一种TBM撑靴的改进结构,包括刀盘1、护盾2、主梁3、推进油缸4、撑靴5、水平油缸6,还包括设于撑靴5两翼与撑靴5面板弧度和长度相一致的弧形板7,所述弧形板7与撑靴5的面板之间采用焊接平顺对接,并沿垂直于主梁3方向上(径向上)间隔设有多块加强筋板8与撑靴5焊接固定,作为优选,所述弧形板7和加强筋板8均为钢板,厚5cm(保证一定的刚度),其中弧形板7宽30cm(视撑靴5结构和实际需求选定),作为优选,加强筋板8做为直角三角形状,两直角边分别与弧形板7和撑靴5的侧面焊接固定。
本实施例在掘进过程中,弧形板7与撑靴5的面板一同接触围岩,通过水平油缸6传递的压力,作用于围岩表面产生摩阻力,通过推进油缸4的作用,提供TBM向前掘进的推进力。
Claims (5)
1.一种TBM撑靴的改进结构,包括主梁(3)、撑靴(5)、水平油缸(6),其特征在于:所述撑靴(5)两翼设有与撑靴(5)表面弧度一致的弧形板(7)且弧形板(7)的外弧面与撑靴(5)外弧面平齐。
2.根据权利要求1所述的一种TBM撑靴的改进结构,其特征在于:所述弧形板(7)为钢板,其与撑靴(5)间为焊接平顺对接。
3.根据权利要求1所述的一种TBM撑靴的改进结构,其特征在于:所述弧形板(7)的弧长与撑靴(5)的弧长一致。
4.根据权利要求1或2或3所述的一种TBM撑靴的改进结构,其特征在于:所述弧形板(7)的内弧面与撑靴(5)间间隔设置多块加强筋板(8)。
5.根据权利要求4所述的一种TBM撑靴的改进结构,其特征在于:所述加强筋板(8)为钢板且为直角三角形状,两直角边分别与撑靴(5)侧面和弧形板(7)内弧面焊接固定。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203126499U CN202194669U (zh) | 2011-08-25 | 2011-08-25 | 一种tbm撑靴的改进结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203126499U CN202194669U (zh) | 2011-08-25 | 2011-08-25 | 一种tbm撑靴的改进结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202194669U true CN202194669U (zh) | 2012-04-18 |
Family
ID=45949586
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011203126499U Expired - Fee Related CN202194669U (zh) | 2011-08-25 | 2011-08-25 | 一种tbm撑靴的改进结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202194669U (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104005771A (zh) * | 2014-05-30 | 2014-08-27 | 中铁工程装备集团有限公司 | 一种控制盾构单个推进油缸撑靴转动的实现方法 |
CN106285712A (zh) * | 2016-08-31 | 2017-01-04 | 中国铁建重工集团有限公司 | 用于掘进机的撑靴和全断面岩石掘进机 |
CN108086984A (zh) * | 2017-12-01 | 2018-05-29 | 辽宁三三工业有限公司 | 一种双护盾tbm硬岩掘进机撑紧装置 |
CN108915712A (zh) * | 2018-07-02 | 2018-11-30 | 石家庄铁道大学 | 敞开式tbm穿越强岩爆洞段掘进方法 |
CN109372557A (zh) * | 2018-11-21 | 2019-02-22 | 中铁工程装备集团有限公司 | 一种隧道掘进机开挖隧道圆弧板及其支护方法 |
-
2011
- 2011-08-25 CN CN2011203126499U patent/CN202194669U/zh not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104005771A (zh) * | 2014-05-30 | 2014-08-27 | 中铁工程装备集团有限公司 | 一种控制盾构单个推进油缸撑靴转动的实现方法 |
CN106285712A (zh) * | 2016-08-31 | 2017-01-04 | 中国铁建重工集团有限公司 | 用于掘进机的撑靴和全断面岩石掘进机 |
CN106285712B (zh) * | 2016-08-31 | 2019-01-22 | 中国铁建重工集团有限公司 | 用于掘进机的撑靴和全断面岩石掘进机 |
CN108086984A (zh) * | 2017-12-01 | 2018-05-29 | 辽宁三三工业有限公司 | 一种双护盾tbm硬岩掘进机撑紧装置 |
CN108915712A (zh) * | 2018-07-02 | 2018-11-30 | 石家庄铁道大学 | 敞开式tbm穿越强岩爆洞段掘进方法 |
CN109372557A (zh) * | 2018-11-21 | 2019-02-22 | 中铁工程装备集团有限公司 | 一种隧道掘进机开挖隧道圆弧板及其支护方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10494924B2 (en) | Longwall mine construction method N00 | |
CN202194669U (zh) | 一种tbm撑靴的改进结构 | |
CN104018837B (zh) | 一种处理卧底矸石的间隔充填沿空留巷方法 | |
CN103557000B (zh) | 利用抽帮充填防治沿空巷道冲击地压的方法 | |
CN103527198A (zh) | 切眼坚硬顶板/顶煤水力致裂控制方法 | |
CN102392642A (zh) | 一种无煤柱回采工作面的巷道布置方法 | |
CN101793152A (zh) | 软岩大变形巷道卸压法施工工艺及配套支架 | |
CN201080827Y (zh) | 可伸缩式衬砌管片 | |
CN104929649A (zh) | 隧道横洞进主洞挑顶工法及挑顶结构 | |
CN104141506A (zh) | 一种强烈矿压显现综采放顶煤工作面的矿压控制方法 | |
CN106194186A (zh) | 长壁工作面回采巷道超前支护段变形的钻采卸压控制方法 | |
CN205422752U (zh) | 暗挖车站中隔壁法中导洞内顶纵梁与中拱二衬同步施工结构 | |
CN104405392B (zh) | 三软厚煤层巷道托顶留底锚网索主动支护综放开采方法 | |
CN102080551A (zh) | 软弱破碎围岩隧道初期支护仰拱三幅施工方法 | |
CN202767982U (zh) | 大坡度掘进机辅助爬坡装置 | |
CN102182469B (zh) | 一种大跨隧道中洞二次衬砌防开裂的施工方法 | |
CN109882189B (zh) | 一种适用于断层破碎带的马蹄形半断面盾构机及施工方法 | |
CN108952715B (zh) | 一种倾斜厚/特厚煤层巷顶沿空掘巷顶煤支护加固方法 | |
CN109869151A (zh) | 实现工作面开采与保护煤柱回收的协同作业方法 | |
CN111335896B (zh) | 冲击地压煤层回采巷道宽掘窄用无煤柱防冲方法 | |
CN110714762B (zh) | 厚煤层放顶煤采空区残留煤体的往复式二次快速回采方法 | |
CN204877483U (zh) | 一种挖掘机用的挖斗 | |
CN107387114A (zh) | 一种基于巷旁钻孔的煤矿巷道连续卸压方法 | |
CN110344845B (zh) | 一种土质隧道模块化支护结构及其施工方法 | |
CN110130958A (zh) | 一种沿空留巷底鼓的防治方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120418 Termination date: 20160825 |