CN202188619U - Tea-making dedicated electric heater with water tank - Google Patents

Tea-making dedicated electric heater with water tank Download PDF

Info

Publication number
CN202188619U
CN202188619U CN2011202709809U CN201120270980U CN202188619U CN 202188619 U CN202188619 U CN 202188619U CN 2011202709809 U CN2011202709809 U CN 2011202709809U CN 201120270980 U CN201120270980 U CN 201120270980U CN 202188619 U CN202188619 U CN 202188619U
Authority
CN
China
Prior art keywords
water
water tank
heater
electric heater
special
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011202709809U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011202709809U priority Critical patent/CN202188619U/en
Application granted granted Critical
Publication of CN202188619U publication Critical patent/CN202188619U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The utility model discloses a tea-making dedicated electric heater with a water tank. The tea-making dedicated electric heater comprises a shell, wherein a water outlet faucet is arranged on the surface of the shell. The tea-making dedicated electric heater is characterized in that a pipeline heater, the water tank and a water quantity detection mechanism are also arranged on the shell; a water inlet and a water outlet are arranged on the pipeline heater; the water inlet is communicated with the water tank; the water outlet is connected with the water outlet faucet; the water quantity detection mechanism is arranged at the outer wall of the water tank or in the water tank, so as to control the work of the pipeline heater and prevent the parch of the pipeline heater caused by the water shortage in the water tank through detecting the weight of the water tank or the water level in the water tank; in addition, in the whole electric heater, the pipe heater and the water outlet faucet are arranged on the surface of the same shell, therefore, the whole electric heater has the advantages that the weight is light, and the volume is small, is convenient to carry and is energy-saving.

Description

The special-purpose electric heater of making tea of band water tank
Technical field
The utility model relates to a kind of special-purpose electric heater of making tea, and especially is a kind of with the special-purpose electric heater of making tea of water tank.
Background technology
Existing tea-making facility; Its structure includes the tea tray body; The tea tray body is provided with the tea tray face that is used to bear (bubble) teapot, teacup; The tea tray face is provided with sewage collecting tank, and tea tray body one side is as electric heater unit, and electric heater unit adopts electromagnetic oven more and is furnished with the kettle body formation that electromagnetism is heated; During use, people toward kettle perfusion in vivo running water, are placed on the electromagnetism boiler face with the kettle body again and are heated to boiling earlier, and are last, pour the water that boils into teapot (making tea), for drinking.
There is following weak point in the tea-making facility of above-mentioned traditional structure: (1) is because the volume of teapot is less, therefore; Boiling water in the kettle body can not all be introduced in the teapot, stays boiling water unnecessary in the kettle body, if temperature reduces slightly; Influence is made tea, even can not drink, therefore as making tea; Unnecessary boiling water in the kettle body is often toppled over, the waste electric energy; (2) make tea at every turn, all need be fed into running water in the kettle body, be placed on the heating of electromagnetism boiler face again, also will pour boiling water in the teapot at last, just can make tea and drink, whole operation is loaded down with trivial details, inconvenient; Have, the tea-making facility of above-mentioned traditional structure, the water source of its use mainly are running water again, to a certain extent, have limited the different choice of people to the water source.
For this reason, the part tea-making facility is arranged also, use instantaneously heated type electric heater unit, that is: the Instant heating type heater that setting is communicated with running water or storage tank on tea set, and installation is turned on the tap with Instant heating type heater is communicated with on tea tray; When people make tea, be put into teapot turn on the tap (" Instant heating type heater " at this moment
Energising work), will turn on the tap again to open and instant to flow out boiling water, and fill boiling water until teapot and turn off again and turn on the tap; Whole operation is simple and easy, convenient, and, really accomplish to drink the effect how much boiling water how much boiling water, heater boil; Can not cause waste, save electric energy.
Yet still there is following weak point in above-mentioned instantaneously heated type electric heater unit: the volume of (1) above-mentioned two tea tray is big, quality heavy, and carries inconvenience, causes inconvenience and restriction to use; (2) in view of the storage tank (or balanced reservoir) on the tea tray; Only play the purposes of water storage (or equilibrium level); Instantaneously heated type heater during lack of water, is worked if fail in time to stop (heating) in running into storage tank, and instantaneously heated type heater causes damage because of dry combustion method easily; (3) existing Instant heating type heater is adopted electric hot tray or electrothermal tube mode of heating more, and there are deficiencies such as the thermal efficiency is low, power consumption in this kind mode of heating.
The utility model content
The purpose of the utility model is to overcome the deficiency that exists in the above-mentioned prior art; And provide a kind of simple and reasonable for structure; Can prevent that water tank from causing the pipeline heater dry combustion method because of lack of water, and light weight, volume are little, the special-purpose electric heater of making tea of easy to carry, energy-conservation band water tank.
The purpose of the utility model is achieved in that
The special-purpose electric heater of making tea of band water tank comprises housing, on the surface of housing depotition cock is installed; It is characterized in that pipeline heater, water tank and water yield testing agency thereof also are installed on the said housing, and pipeline heater is provided with water inlet and delivery port; Water inlet and water tank conducting, delivery port is through the recanalization depotition cock, and water yield testing agency is arranged in tank outer wall or the water tank; So that through detecting the water level height in water tank weight or the water tank, the work of control valve channel heater prevents that water tank from causing the pipeline heater dry combustion method because of lack of water; And whole money heater; Its pipeline heater, depotition cock are installed on same surface of shell, its light weight, little, easy to carry, the energy-saving advantages of volume.
The utility model can also adopt following technical measures to solve.
As scheme more specifically, said water tank is a storage tank, and the storage tank bottom has drain gully, and pipeline adds
The drain gully of hot device and storage tank bottom is connected.
Said water tank also can be a balanced reservoir, and the level height of the level height of balanced reservoir and pipeline heater delivery port is approaching, so as water to be heated to be fed in the pipeline heater and be stored near the delivery port position.
Said water yield testing agency is the weight sense switch, and the weight detecting switch is the electric connection of connecting with pipeline heater, and the weight detecting switch is installed in the bottom of water tank; During work; Along with the water in the water tank reduces, water tank weight reduces, and the weight detecting switch that is located at water tank bottom can monitor the variation of weight in the water tank; If the water in the interior case is reduced to the setting weight value; The weight detecting switch breaks off, and cuts off the pipeline heater power supply, reaches the effect of protection tube channel heater.
Said water yield testing agency is the weight sense switch, and the weight detecting switch is the electric connection of connecting with pipeline heater, and the weight detecting switch hooks water tank with the form of hook; As: hook the water tank inner top, during work, along with the water in the water tank reduces; Water tank weight reduces; Make the weight detecting switch that hooks tank top monitor the variation of weight in the water tank, if the water in the interior case is reduced to the setting weight value, the weight detecting switch breaks off; Cut off the pipeline heater power supply, reach the effect of protection tube channel heater equally.
Said water yield testing agency also can be the buoyancy magnetic switch, and the buoyancy magnetic switch comprises ball float, ball float is spacing and tongue tube, and tongue tube is the electric connection of connecting with pipeline heater, and ball float is installed in the casing through ball float with the form of free floating; During work, ball float reduces along with the water in the water tank and reduces, if ball float is reduced to the cistern water level setting value, dry-reed tube switch breaks off, and cuts off the pipeline heater power supply, reaches the effect of protection tube channel heater equally.
More than multiple water yield testing agency, all have denominator: utilize water tank weight or cistern water level to reduce, and make water yield testing agency that mechanical action take place, cut off the electricity supply, realize the effect of protection tube channel heater.
Said water yield testing agency also can be water yield electronic monitoring switch, and water yield electronic monitoring switch is installed in the casing, and through electric control gear and pipeline heater electric connection; During work, water yield electronic monitoring switch is through induction end, monitors water level in the water tank when being lower than setting value, is sent to electric control gear to information, cuts off the pipeline heater power supply by electric control gear, reaches the effect of protection tube channel heater equally.
As better embodiment, said water yield testing agency also is electrically connected with alarm, and alarming horn and/or indicator lamp are installed on the alarm; So that when the water yield is lower than setting value; When cutting off pipeline heater work, the alarm signal of sounding, prompting user.
Said pipeline heater preferably uses the coating film on glass electrothermal tube, and it has multiple tracks tube chamber independently separately, and the top and bottom of each tube chamber are respectively as water inlet and delivery port, and the connection of plugging into of corresponding inlet channel and outlet conduit; Be provided with the metal level of heating power in view of the outer wall of coating film on glass electrothermal tube; And the glass tube inner chamber passes through pipeline as current, therefore, and each the independent tube chamber in the glass tube; Can heat be passed to each independent intraluminal water rapidly through the metal level heating, with the effect that realizes boiling immediately; The coating film on glass electrothermal tube has following benefit: 1. can not produce incrustation scale in the pipe, therefore, especially being fit to makes tea drinks; 2. coating film on glass electrothermal tube light weight, volume are little, are convenient for carrying, use; 3. the coating film on glass electrothermal tube efficiency of heating surface is fast, energy-conservation.
As better embodiment, other temperature controller and/or the fuse that anti-dry also is installed of said pipeline heater; Utilize temperature controller and/or fuse monitoring heater hull-skin temperature, if do not have current to pass through (dry combustion method) in the heater, the heater hull-skin temperature raises rapidly; Temperature controller and/or fuse cut off the heater power circuit; The protection heater is realized the effect of anti-dry, therefore; Temperature controller and/or fuse cooperate the water yield testing agency of water tank, realize the dual security protection to pipeline heater.
The beneficial effect of the utility model is.
(1) the special-purpose electric heater of making tea of this kind of band water tank utilizes water yield testing agency to be arranged in tank outer wall or the water tank, so that through detecting the water level height in water tank weight or the water tank; The work of control valve channel heater; Prevent that water tank from causing the pipeline heater dry combustion method because of lack of water, and whole money heater, its pipeline heater, depotition cock are installed on same surface of shell; Its light weight, little, easy to carry, the energy-saving advantages of volume.
(2) this kind of special-purpose electric heater of making tea discloses multiple water yield testing agency, all has denominator: utilize water tank weight or cistern water level to reduce, and make water yield testing agency that mechanical action take place, cut off the electricity supply, realize the effect of protection tube channel heater.
(3) have, it is also through being equipped with the temperature controller and/or the fuse of anti-dry on the pipeline heater side again; Utilize temperature controller and/or fuse monitoring heater hull-skin temperature, if do not have current to pass through (dry combustion method) in the heater, the heater hull-skin temperature raises rapidly; Temperature controller and/or fuse cut off the heater power circuit; The protection heater is realized the effect of anti-dry, therefore; Temperature controller and/or fuse cooperate the water yield testing agency of water tank, realize the dual security protection to pipeline heater.
Description of drawings
Fig. 1 is the structural representation of the special-purpose electric heater of making tea of the utility model.
Fig. 2 is another embodiment sketch map of the special-purpose electric heater of making tea of Fig. 1.
Fig. 3 is the special-purpose electric heater of making tea of a Fig. 2 embodiment sketch map again.
Fig. 4 is the another embodiment sketch map of the special-purpose electric heater of making tea of Fig. 2.
The specific embodiment
Embodiment one: as shown in Figure 1, a kind of with the special-purpose electric heater of making tea of water tank, comprise housing 1; Depotition cock 2 is installed on the surface of housing 1, pipeline heater 3, storage tank 4 and water yield testing agency 5 thereof also are installed on the said housing 1, pipeline heater 3 is the coating film on glass electrothermal tube; Pipeline heater 3 is provided with water inlet 31 and delivery port 32; Water inlet 31 and water tank 4 conductings, delivery port 32 is through recanalization depotition cock 2, and water yield testing agency 5 is arranged in water tank 4 outer walls or the water tank 4; So that through detecting the water level height in water tank 4 weight or the water tank 4,3 work of control valve channel heater.
Among Fig. 1, said water yield testing agency 5 is the weight sense switch, and weight detecting switch 5 is the electric connection of connecting with pipeline heater 3, and the weight detecting switch is installed in the bottom of water tank 4; During work; Along with the water in the water tank 4 reduces, water tank 4 weight reduce, and the weight detecting switch 5 that is located at water tank 4 bottoms can monitor the variation of weight in the water tank 4; If the water in the interior case 4 is reduced to the setting weight value; Weight detecting switch 5 breaks off, and cuts off pipeline heater 3 power supplys, reaches the effect of protection tube channel heater 3.
Also there is another kind of embodiment in said water yield testing agency 5, and it is the weight detecting switch equally, and the weight detecting switch is the electric connection of connecting with pipeline heater 3, and the weight detecting switch hooks water tank 4 with the form of hook; As: hook water tank inner top (not looking out), its operation principle is same as described above, no longer details here.
As better embodiment, said water yield testing agency 5 also is electrically connected with alarm 7, and alarming horn and/or indicator lamp are installed on the alarm 7; So that when the water yield is lower than setting value; When cutting off pipeline heater 3 work, the alarm signal of sounding, prompting user.
Said pipeline heater 3 other temperature controller and/or the fuses 8 that anti-dry also is installed; Utilize temperature controller and/or fuse 8 monitoring heaters 3 hull-skin temperatures, if do not have current to pass through (dry combustion method) in the pipeline heater 3, heater 3 hull-skin temperatures raise rapidly; Temperature controller and/or fuse 8 cut off the heater power circuit; Protection heater 3 is realized the effect of anti-dry, therefore; The water yield testing agency 5 that temperature controller and/or fuse 8 cooperate water tank realizes the dual security protection to pipeline heater 3.
Embodiment two: as shown in Figure 2; Its embodiment and embodiment one are approximate; Difference is merely: said water tank 4 is balanced reservoirs; The level height of the level height of balanced reservoir and pipeline heater delivery port 32 is approaching, so that the water in the pipeline heater 3 remains near low slightly some place of delivery port 32.
Embodiment three: as shown in Figure 3, its embodiment and embodiment one are approximate, and difference is merely: institute
State water yield testing agency 5 and be the buoyancy magnetic switch; The buoyancy magnetic switch comprises ball float 51, ball float spacing 52 and tongue tube 53; Tongue tube 53 is the electric connection of connecting with pipeline heater 3, and ball float 51 is installed in the casing 4 through ball float spacing 52 with the form of free floating; During work, ball float 51 reduces along with the water in the water tank 4 and reduces, if ball float 51 is reduced to water tank 4 water level settings values, dry-reed tube switch breaks off, and cuts off pipeline heater 3 power supplys, reaches the effect of protection tube channel heater 3 equally.
Embodiment four: as shown in Figure 4; Its embodiment and embodiment one are approximate; Difference is merely: said water yield testing agency 5 is water yield electronic monitoring switch, and water yield electronic monitoring switch is installed in the casing 4, and electrically connect through electric control gear 6 and pipeline heater 3; During work, water yield electronic monitoring switch is through induction end, monitors water levels in the water tank 4 when being lower than setting value, is sent to information and automatically controlledly adorns 6 and put, and cuts off pipeline heater 3 power supplys by electric control gear, reaches the effect of protection tube channel heater 3 equally.
Above-mentioned several embodiment can also also be provided with Steam Recovery mouth 9 near delivery port 32 places of said pipeline heater; Utilize Steam Recovery mouth 9, be directed into water inlet pipe 11 or water tank 4 peripheries to steam, after the steam heat radiation, the water temperature (warm water) in water inlet pipe or the water tank 4 raises, and is sent to pipeline heater 3 again, can save electric energy; Certainly, the steam port of direct connection atmosphere can also be set, with the steam of draining near delivery port 32 places of pipeline heater 3; The bottom of water tank 4 can also be equipped with check valve 10, so that water tank is when being removed, the water in the water tank 4 can not spill.
This all right external water source of special-purpose electric heater of making tea, as: bottled water, or running water.

Claims (10)

1. the special-purpose electric heater of making tea of band water tank comprises housing (1), and depotition cock (2) is installed on the surface of housing (1); It is characterized in that; Pipeline heater (3), water tank (4) and water yield testing agency (5) thereof also are installed on the said housing (1), and pipeline heater (3) is provided with water inlet (31) and delivery port (32), water inlet (31) and water tank (4) conducting; Delivery port (32) is through recanalization depotition cock (2); Water yield testing agency (5) is arranged in water tank (4) outer wall or the water tank (4), so that through detecting the water level height in water tank (4) weight or the water tank (4), control valve channel heater (3) work.
2. according to the special-purpose electric heater of making tea of the said band water tank of claim 1, it is characterized in that said water tank (4) is a storage tank.
3. according to the special-purpose electric heater of making tea of the said band water tank of claim 1, it is characterized in that said water tank (4) is a balanced reservoir, the level height of the level height of balanced reservoir and pipeline heater delivery port (32) is approaching.
4. according to the special-purpose electric heater of making tea of claim 1 or 2 or 3 said band water tanks; It is characterized in that; Said water yield testing agency (5) is the weight sense switch, and the weight detecting switch is the electric connection of connecting with pipeline heater (3), and the weight detecting switch is installed in the bottom of water tank (4).
5. according to the special-purpose electric heater of making tea of claim 1 or 2 or 3 said band water tanks; It is characterized in that; Said water yield testing agency (5) is the weight sense switch; The weight detecting switch is the electric connection of connecting with pipeline heater (3), and the weight detecting switch hooks water tank (4) with the form of hook.
6. according to the special-purpose electric heater of making tea of claim 1 or 2 or 3 said band water tanks; It is characterized in that; Said water yield testing agency (5) is the buoyancy magnetic switch; The buoyancy magnetic switch comprises ball float (51), ball float spacing (52) and tongue tube (53), and tongue tube (53) is the electric connection of connecting with pipeline heater (3), and ball float (51) is installed in the casing (4) through ball float spacing (52) with the form of free floating.
7. according to the special-purpose electric heater of making tea of claim 2 or 3 said band water tanks; It is characterized in that; Said water yield testing agency (5) is a water yield electronic monitoring switch, and water yield electronic monitoring switch is installed in the casing (4), also electrically connects through electric control gear (6) and pipeline heater (3).
8. according to the special-purpose electric heater of making tea of claim 2 or 3 said band water tanks, it is characterized in that said water yield testing agency (5) also is electrically connected with alarm (7), alarm is equipped with alarming horn and/or indicator lamp on (7).
9. according to the special-purpose electric heater of making tea of the said band water tank of claim 1, it is characterized in that said pipeline heater (3) is the coating film on glass electrothermal tube.
10. according to the special-purpose electric heater of making tea of the said band water tank of claim 1, it is characterized in that other temperature controller and/or the fuse (8) that anti-dry also is installed of said pipeline heater (3).
CN2011202709809U 2011-07-28 2011-07-28 Tea-making dedicated electric heater with water tank Expired - Lifetime CN202188619U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202709809U CN202188619U (en) 2011-07-28 2011-07-28 Tea-making dedicated electric heater with water tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202709809U CN202188619U (en) 2011-07-28 2011-07-28 Tea-making dedicated electric heater with water tank

Publications (1)

Publication Number Publication Date
CN202188619U true CN202188619U (en) 2012-04-11

Family

ID=45920066

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202709809U Expired - Lifetime CN202188619U (en) 2011-07-28 2011-07-28 Tea-making dedicated electric heater with water tank

Country Status (1)

Country Link
CN (1) CN202188619U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102901205A (en) * 2011-07-28 2013-01-30 罗伟林 Special electric heater for infusion of tea with water tank
CN108803687A (en) * 2018-07-25 2018-11-13 珠海格力电器股份有限公司 The control device and its method and electric appliance that liquid is protected are lacked for electric appliance

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102901205A (en) * 2011-07-28 2013-01-30 罗伟林 Special electric heater for infusion of tea with water tank
CN108803687A (en) * 2018-07-25 2018-11-13 珠海格力电器股份有限公司 The control device and its method and electric appliance that liquid is protected are lacked for electric appliance

Similar Documents

Publication Publication Date Title
CN201091512Y (en) Electric boiling water machine
CN202173031U (en) Tea table with detection mechanism for water quantity in water tank
CN202184561U (en) Tea set with water tank and water capacity detection mechanism
CN102894663B (en) A kind of tea table with detection mechanism for water quantity in water tank
CN103006062B (en) Open double-bucket water dispenser
CN201422758Y (en) Instant heating type water dispenser
CN202188619U (en) Tea-making dedicated electric heater with water tank
CN202229416U (en) Electrothermal boiler
CN102901205A (en) Special electric heater for infusion of tea with water tank
CN102894818B (en) Tea set with water volume detecting mechanism for water tank
CN201237340Y (en) Energy-saving instant water boiling equipment
CN102240174A (en) Water dispenser
CN201448994U (en) Immediately-boiling electric water boiler
CN202104777U (en) Water dispenser
CN202562015U (en) Intelligent energy-saving type water fountain
CN202173153U (en) Tea set with pipeline heater
CN102042671B (en) Intelligent fast-hot straight-through type boiler and operating method thereof
CN102901227B (en) Electric heating water boiler
CN201314689Y (en) Automatic DC water boiler
CN203000572U (en) Open water dispenser with double-bucket
CN201909423U (en) Intelligent rapid-heating through type water boiler
CN201452882U (en) Multifunctional water dispenser
CN204043214U (en) Health energy-saving boiler
CN208640399U (en) A kind of magnetic energy water dispenser
CN102305310A (en) Special water tap with pipeline heater for making tea

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120411