CN202187743U - High-energy mixer for well cementation of oil and gas field - Google Patents

High-energy mixer for well cementation of oil and gas field Download PDF

Info

Publication number
CN202187743U
CN202187743U CN2011202063810U CN201120206381U CN202187743U CN 202187743 U CN202187743 U CN 202187743U CN 2011202063810 U CN2011202063810 U CN 2011202063810U CN 201120206381 U CN201120206381 U CN 201120206381U CN 202187743 U CN202187743 U CN 202187743U
Authority
CN
China
Prior art keywords
pipe
gas field
well cementation
high energy
oil gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202063810U
Other languages
Chinese (zh)
Inventor
何长秋
王泽刚
李克雷
岳林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG CHENZHONG KNC PETROLEUM EQUIPMENT CO Ltd
Original Assignee
SHANDONG CHENZHONG KNC PETROLEUM EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG CHENZHONG KNC PETROLEUM EQUIPMENT CO Ltd filed Critical SHANDONG CHENZHONG KNC PETROLEUM EQUIPMENT CO Ltd
Priority to CN2011202063810U priority Critical patent/CN202187743U/en
Application granted granted Critical
Publication of CN202187743U publication Critical patent/CN202187743U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to a slurry mixing device used in well cementation of an oil and gas field, in particular to a high-energy mixer for the well cementation of the oil and gas field, which comprises a shell, an ash supply pipe, a water supply pipe and a secondary ash mixing pipe, and is characterized in that the secondary ash mixing pipe is in a single line structure and is provided with a valve. In the high-energy mixer, as the secondary ash mixing pipe is changed to be in the single line structure, the structure is simplified, the flow rate of secondary ash-mixed cement slurry entering into the shell is enhanced, and the phenomenon of clogging is avoided; as a water distribution thimble is fixed on the water supply pipe, the manual adjustment is avoided, the labor intensity is reduced, the possible errors in manual adjustment are avoided, the stability of water flow is ensured, the flow rate is improved, and the slurry mixing effect is improved; and as a tungsten carbide hard alloy layer is coated and plated on the inner wall of each pipe, the wearing resistance is improved, and further the service life of the mixer is prolonged.

Description

High energy mixers is used in the oil gas field well cementation
Technical field
The utility model relates to the mixed slurry equipment that uses when a kind of oil gas field is cemented the well, and high energy mixers is used in particularly a kind of oil gas field well cementation.
Background technology
High energy mixers is that the reinforcing oil well car is used for concrete grey and the first critical component that mixes of clear water; Phenomenons such as the high energy mixers ubiquity that uses at present complex structure, easy blocking, mixing efficiency is low, labour intensity is big, application life is short, main cause is following:
1, the secondary mixing ash pipe adopts ox head formula twin pipeline structure, and complex structure, cement paste form in housing easily and stop up;
2, the upper hose water inlet needs manual adjustment to divide the position of water thimble, and labour intensity is big, causes water (flow) direction and flow velocity unstable;
3, blender adopts the common material welding fabrication, and application life is short.
The utility model content
According to above deficiency of the prior art, the technical problem that the utility model will solve is: a kind of above-mentioned defective that solved is provided, has avoided clogging, improved the oil gas field well cementation of mixed slurry effect and used high energy mixers.
The utility model solves the technical scheme that its technical problem adopted: high energy mixers is used in a kind of oil gas field well cementation; Comprise housing, supply ash pipe, upper hose and secondary mixing ash pipe, wherein supply ash pipe to be connected the top of housing, the bottom of housing connects mixes stock tank; Supply ash pipe to comprise grey bend pipe, spray bend pipe and lining; Lining is positioned at enclosure interior, and upper hose welds together with the injection bend pipe along spraying the winding pipe exit center position, and the water side of upper hose is positioned at lower housing portion; The below, water side of upper hose is provided with branch water thimble; The secondary mixing ash pipe is connected a side of housing, it is characterized in that: the secondary mixing ash pipe is the individual tubes line structure, and the secondary mixing ash pipe is provided with valve.
The secondary mixing ash pipe adopts the individual tubes line structure, has improved secondary mixing buck mud and has got into the flow velocity of housing, and avoided clogging.
Valve on the described secondary mixing ash pipe is the gas control butterfly valve.
Described secondary mixing ash pipe is welded on the housing, simplifies the structure.
The level height of the bottom of described lining is lower than the level height of the secondary mixing ash pipe port of export, helps the secondary mixing ash.
The water thimble was fixedly connected on the tube wall of upper hose in described minute.
With minute fixed-site of water thimble, no longer need manual adjustment, reduced labour intensity, the error that possibly occur when having avoided manual adjustment has guaranteed flow stability, has improved flow velocity, has improved mixed slurry effect.
The water thimble was fixed on through supporting pin on the tube wall of upper hose in described minute, and the number of supporting pin is 2~4.
The end face of described minute water thimble is a conical structure, and the vertical distance between the conical surface of the tube wall bottom of upper hose water side and branch water thimble is 5~10mm.
The described inwall of grey bend pipe, injection bend pipe and housing, and on the inner and outer wall of lining, all be coated with and be coated with the Talide layer.
Coating Talide layer makes the case hardness of each pipeline inner wall reach HRC65~more than 70, improved abrasion resistance, thereby has prolonged application life.
The thickness of described Talide layer is 0.2~0.5mm.
The operating principle of the utility model:
In the course of normal operation, the gas control butterfly valve is in closed condition, according to construction cement slurry density requirement, controls concrete grey amount and the clear water amount that gets into high energy mixers well.After press water gets into upper hose; Branch water thimble through the upper hose bottom is dispersed into fan-shaped fast; Concrete grey is fed into grey bend pipe and gets into housing through spraying bend pipe and lining through pressure fan wind; In housing, realize mixed once, get into mixed stock tank after the mixed cement paste and fully mix processing with clear water.
When needs secondary mixing ash; The gas control butterfly valve is opened, and secondary mixing buck mud is through charge pump, in the pumping of secondary mixing ash pipe gets into housing; According to the requirement of construction cement slurry density; Control concrete grey amount and the clear water amount that gets into high energy mixers well, and realize mixing once more of cement paste, get into mixed stock tank afterwards and fully mix processing through the tapering annular space that forms between sleeve and the housing.
The beneficial effect that the utility model had is: the oil gas field well cementation, simplifies the structure through changing the secondary mixing ash pipe into the individual tubes line structure with high energy mixers, has improved the flow velocity of secondary mixing buck mud entering housing; And avoided clogging, divided the water thimble to be fixed on the upper hose, no longer needed manual adjustment; Reduced labour intensity, the error that possibly occur when having avoided manual adjustment has guaranteed flow stability; Improved flow velocity, improved mixed slurry effect, at each inside pipe wall coating Talide layer; Improve abrasion resistance, thereby prolonged application life.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the theory diagram of oil gas field well cementation.
Among the figure: 1, housing; 2, go up grey bend pipe; 3, spray bend pipe; 4, lining; 5, upper hose; 6, secondary mixing ash pipe; 7, divide the water thimble; 8, supporting pin; 9, gas control butterfly valve; 10, Talide layer; 11, supply ash pipe.
The specific embodiment
Below in conjunction with accompanying drawing the embodiment of the utility model is done and to further describe:
Shown in Fig. 1~2, supply ash pipe 11 to comprise grey bend pipe 2, injection bend pipe 3 and lining 4, lining 4 is positioned at housing 1 inside; The bottom of housing 1 connects mixes stock tank, and upper hose 5 welds together along spraying bend pipe 3 export center directions and spraying bend pipe 3, and the water side of upper hose 5 is positioned at housing 1 bottom; Secondary mixing ash pipe 6 is connected a side of housing 1; The below, water side of upper hose 5 is provided with branch water thimble 7, divides water thimble 7 to be fixedly connected on through supporting pin 8 on the tube wall of upper hose 5, and secondary mixing ash pipe 6 is the individual tubes line structure; On secondary mixing ash pipe 6 welded case 1, on secondary mixing ash pipe 6, be provided with gas control butterfly valve 9.
Dividing the end face of water thimble 7 is conical structure, and the vertical distance between the conical surface of the tube wall bottom of upper hose 5 water sides and branch water thimble 7 is 5~10mm.
The level height of the bottom of lining 4 is lower than the level height of secondary mixing ash pipe 6 ports of export.
Go up grey bend pipe 2, spray the inwall of bend pipe 3 and housing 1, and on the inner and outer wall of lining 4, all be coated with and be coated with Talide layer 10, the thickness of Talide layer 10 is 0.2~0.5mm.
The operating principle of the utility model:
In the course of normal operation, gas control butterfly valve 9 is in closed condition, according to construction cement slurry density requirement, controls concrete grey amount and the clear water amount that gets into high energy mixers well.After press water gets into upper hose 5; Branch water thimble 7 through upper hose 5 bottoms is dispersed into fan-shaped fast; Concrete grey is fed into grey bend pipe 2 and gets into housing 1 through spraying bend pipe 3 with lining 4 through pressure fan wind; In housing 1, realize mixed once, get into mixed stock tank after the mixed cement paste and fully mix processing with clear water.
The first cement paste that mixes gets into and mixes in the stock tank in the high energy mixers, detects through densometer, if density is qualified; Then cement paste is behind charge pump, through plunger displacement pump after high-pressure output tube squeeze in the well, if density is defective; Then gas control butterfly valve 9 is opened, and cement paste is gone in the housing 1 through secondary mixing slurry pipe 6 is counter behind charge pump; According to construction cement slurry density requirement, control high energy mixers concrete grey amount and the clear water amount of getting into well, and the mixing once more of the tapering annular space realization cement paste through formation between lining 4 bottoms and the housing 1; Get into mixed stock tank afterwards and fully mix processing, qualified until mixed cement slurry density.

Claims (9)

1. high energy mixers is used in an oil gas field well cementation, comprises housing, supplies ash pipe, upper hose and secondary mixing ash pipe, wherein supplies ash pipe to be connected the top of housing; The bottom of housing connects mixes stock tank, supplies ash pipe to comprise grey bend pipe, spray bend pipe and lining, and lining is positioned at enclosure interior; Upper hose welds together with the injection bend pipe along spraying the winding pipe exit center position; The water side of upper hose is positioned at lower housing portion, and the below, water side of upper hose is provided with branch water thimble, and the secondary mixing ash pipe is connected a side of housing; It is characterized in that: the secondary mixing ash pipe is the individual tubes line structure, and the secondary mixing ash pipe is provided with valve.
2. high energy mixers is used in oil gas field well cementation according to claim 1, and it is characterized in that: the valve on the described secondary mixing ash pipe is the gas control butterfly valve.
3. high energy mixers is used in oil gas field well cementation according to claim 1, and it is characterized in that: described secondary mixing ash pipe is welded on the housing.
4. high energy mixers is used in oil gas field well cementation according to claim 1, and it is characterized in that: the level height of the bottom of described lining is lower than the level height of the secondary mixing ash pipe port of export.
5. high energy mixers is used in oil gas field well cementation according to claim 1, and it is characterized in that: the water thimble was fixedly connected on the tube wall of upper hose in described minute.
6. high energy mixers is used in oil gas field well cementation according to claim 5, and it is characterized in that: the water thimble was fixed on through supporting pin on the tube wall of upper hose in described minute, and the number of supporting pin is 2~4.
7. high energy mixers is used in oil gas field well cementation according to claim 5, and it is characterized in that: the end face of described minute water thimble is a conical structure, and the vertical distance between the conical surface of the tube wall bottom of upper hose water side and branch water thimble is 5~10mm.
8. high energy mixers is used in oil gas field well cementation according to claim 1, it is characterized in that: the described inwall of grey bend pipe, injection bend pipe and housing, and on the inner and outer wall of lining, all be coated with and be coated with the Talide layer.
9. high energy mixers is used in oil gas field well cementation according to claim 8, and it is characterized in that: the thickness of described Talide layer is 0.2~0.5mm.
CN2011202063810U 2011-06-17 2011-06-17 High-energy mixer for well cementation of oil and gas field Expired - Fee Related CN202187743U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202063810U CN202187743U (en) 2011-06-17 2011-06-17 High-energy mixer for well cementation of oil and gas field

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202063810U CN202187743U (en) 2011-06-17 2011-06-17 High-energy mixer for well cementation of oil and gas field

Publications (1)

Publication Number Publication Date
CN202187743U true CN202187743U (en) 2012-04-11

Family

ID=45919202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202063810U Expired - Fee Related CN202187743U (en) 2011-06-17 2011-06-17 High-energy mixer for well cementation of oil and gas field

Country Status (1)

Country Link
CN (1) CN202187743U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322239A (en) * 2011-06-17 2012-01-18 山东晨钟科尼石油装备有限公司 High-energy mixer for well cementation in oil and gas fields
CN112677314A (en) * 2020-12-16 2021-04-20 中油国家油气钻井装备工程技术研究中心有限公司 Electric drive type high-energy mixer for well cementation and slurry premixing control method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322239A (en) * 2011-06-17 2012-01-18 山东晨钟科尼石油装备有限公司 High-energy mixer for well cementation in oil and gas fields
CN102322239B (en) * 2011-06-17 2014-03-19 山东晨钟科尼石油装备有限公司 High-energy mixer for well cementation in oil and gas fields
CN112677314A (en) * 2020-12-16 2021-04-20 中油国家油气钻井装备工程技术研究中心有限公司 Electric drive type high-energy mixer for well cementation and slurry premixing control method

Similar Documents

Publication Publication Date Title
CN102072327A (en) Water tap
CN202187743U (en) High-energy mixer for well cementation of oil and gas field
CN102322239B (en) High-energy mixer for well cementation in oil and gas fields
CN205446202U (en) Whirl preventer of low resistance
CN104339455A (en) Novel dry-mixed mortar material storage tank
CN107388040B (en) Ore pulp conveying device for mineral separation equipment
CN201560585U (en) Discharge device of concrete injecting machine
CN101768995A (en) High-efficiency water saving device
CN107972175A (en) A kind of mortar processing equipment
CN207344883U (en) Excavation machine mortar stirs spray system
CN102514098A (en) Novel foam concrete slurry producing and conveying machine
CN115254323A (en) Ultra-clean coal preparation device
CN211367428U (en) Polycarboxylate water reducing agent compound system
CN208330407U (en) A kind of double-liquid grouting system for constructing tunnel
CN204773009U (en) Cement blender
CN204221978U (en) Aeroconcrete proportioning and water system
CN203834482U (en) Closed continuous secondary watering wet shotcreting system
CN206746342U (en) Highly dense microvovtex blender
CN209302565U (en) A kind of closed flyash waterpower pulping system of large size
CN203389557U (en) Device for preparing alkali continuously
CN112610184A (en) Tank type adding device and adding method for particle temporary plugging agent for fracturing
CN207254235U (en) A kind of coating a mixing bowl
CN110469363A (en) A kind of vertical sand warehouse of continuous-stable discharge puts sand device
CN211754725U (en) Atomizing and spraying device of sintering mixer
CN109973993A (en) A kind of hydrogen, natural gas mix low-carbon combustion machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120411

Termination date: 20140617

EXPY Termination of patent right or utility model