CN202187319U - Improved quadrilateral hexahedron for revetment - Google Patents
Improved quadrilateral hexahedron for revetment Download PDFInfo
- Publication number
- CN202187319U CN202187319U CN201120292611XU CN201120292611U CN202187319U CN 202187319 U CN202187319 U CN 202187319U CN 201120292611X U CN201120292611X U CN 201120292611XU CN 201120292611 U CN201120292611 U CN 201120292611U CN 202187319 U CN202187319 U CN 202187319U
- Authority
- CN
- China
- Prior art keywords
- hexahedron
- quadrilateral
- pole
- improved
- revetment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses an improved quadrilateral hexahedron for revetment, which comprises support rods and bundling points and belongs to the field of river regulation works construction. Each of the support rods is divided into three equidistant parts by the bundling points and extends outwards by one third at four corner points of a traditional quadrilateral hexahedron. The improved quadrilateral hexahedron has the advantages that the extended support rods form a claw-shaped structure, thereby being beneficial to the automatic fixing of the quadrilateral hexahedron at the river bottom without easily moving.
Description
Technical field
A kind of improved shore protection of the utility model belongs to the river regulation field in the hydraulic engineering with four limit hexahedrons, especially a kind of four limit hexahedrons of special shape.
Background technology
Common river regulation method mainly comprises: jackstone, four sides hexahedron frame group, concrete hinge row and mattress etc.These engineering methods are widely used in the improvement of various bank sections, but because the pattern that adopts is different, each method all has its scope of application, in engineering practice, should correctly distinguish river course pattern and Field Characteristics, draws suitable resolution in conjunction with the economic condition analysis.When complicated condition, also can consider the method that the various engineering means mutually combine simultaneously.Riprap protection in use; To the piece stone in the certain grain size scope evenly be thrown into certain thickness block stone layer to the collapse on the bank location from the thalweg to the seashore through calculating, cover the bank, river course that is prone to avalanche comprehensively, increase its impact resistance; The poised river gesture plays bank protection effect [2].Generally speaking, jackstone thickness should be not less than 2 times of jackstone particle diameter, and The water is deep and the current fast locates to be preferably 3~4 times.In the current top-lashed action section, there are local scour hole and thalweg in the riverbed apart from the section of bank nearer (in 60~100m), should throw to thalweg; The non-stream top of meeting dashes section, and low water is steeper with descending slope, should throw to 1: 3 to 1: 4 place of the bank slope gradient, or certain deep trouth elevation place; Low water level must shore protection the time, should be looked its current, fringe conditions and collapse on the bank intensity with descending slope slow (being delayed in 1: 3), throws to certain deep trouth elevation place.
The four sides hexahedron in use; Generally be to be thrown in the offshore water with organizing the framework of tying up bunchiness more; Be built into various forms of accumulation bodies; Fluidised form changes after making current through the framework accumulation body, fluid is become washing away of bank slope dash or alluvial, thereby reach the protection embankment, stablize toe, reduce the scour hole degree of depth, become silted up to face and make the beach, control purposes such as leading the river gesture.
Concrete mattress is a kind of collect anti-impact, anti-filter in the novel bank protection structure of unitary whole formula.According to engineering experience, hinge mattress sinking shore protection is applicable to that water front is more smooth-going, bank slope is slow and more smooth section, and to row's body end to end portion need wrap up in head and handle, the forward position need add throwing piece stone town pin.Change greatly at water front, bank slope is steep and landform changes section greatly, and the bank section of guarding at existing a large amount of jackstones should not adopt, if need to adopt in these bank sections, elder generation is in addition smooth comprehensively with bank slope before the Ying Zaichen rafting body.
Mattress is to form with withy or assorted branch lace, and area is thousands of square metre a laminated structure thing.It is high to riverbed planeness and bank slope slope requirement, under row's body rock windrow should not be arranged, and requires to have enough work waters, land-based area, and row should not anchor a vessel in the district, and row's body main material is sufficient.
Relatively distinct issues are because four limit hexahedron housings can not be rushed at downstream through regular meeting by current attached to the river bed when using the four sides hexahedron, cause waste.The improvement of the utility model is just to this problem.
Summary of the invention
The utility model provides a kind of improved shore protection can avoid being rushed at downstream by current with four limit hexahedrons.Particularly comprise: pole, tie up a little, it is characterized in that: 1/3rd positions pole are tied up a little at described pole two ends.Tying up of pole o'clock just makes position, tetrahedral four angles steel pipe stretch out the top in 1/3rd positions, always have the steel pipe of several angles end to insert in the silt impulse force of opposing current after being convenient to like this in dropping into water.
Said strut lengths is 1.5m, and diameter is 0.05m.Through test of many times, pole is adopted the steel pipe of long 1.5m diameter 0.1, and two ends and centre respectively are divided into 0.5m, is convenient to throw in, and in water, can keeps stable.
Described pole two ends are welding.
Described pole is gone up welding short steel rod.Increased tetrahedral anchor holding power.
The utlity model has following advantage:
The utility model avoids making four limit hexahedrons under the effect of rushing to summit of current, to move downstream, has increased the hexahedral stability under water in four limits.
Description of drawings
Fig. 1 is the schematic side view of the utility model;
Fig. 2 is welded with the sketch map of bar dowel for the utility model.
The specific embodiment
The utility model comprises: pole 1, tie up a little 2, and it is characterized in that: 1/3rd positions pole are tied up a little at described pole two ends.Tying up of pole o'clock just makes position, tetrahedral four angles steel pipe stretch out the top in 1/3rd positions, always have the steel pipe of several angles end to insert in the silt impulse force of opposing current after being convenient to like this in dropping into water.
Said strut lengths is 1.5m, and diameter is 0.05m.Through test of many times, pole is adopted the steel pipe of long 1.5m diameter 0.1, and two ends and centre respectively are divided into 0.5m, is convenient to throw in, and in water, can keeps stable.
Described pole two ends are welding.
Described pole is gone up welding short steel rod.Welding short steel rod 3 on the pole, increased tetrahedral anchor holding power.
Claims (4)
1. an improved shore protection comprises with four limit hexahedrons: pole, tie up a little, and it is characterized in that: 1/3rd positions pole are tied up a little at described pole two ends.
2. a kind of improved shore protection according to claim 1 is characterized in that with four limit hexahedrons: said strut lengths is 1.5m, and diameter is 0.05m.
3. a kind of improved shore protection according to claim 1 is characterized in that with four limit hexahedrons: described pole two ends are welding.
According to the described a kind of improved shore protection of one of claim 1~3 with four limit hexahedrons, it is characterized in that described pole is gone up welding short steel rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120292611XU CN202187319U (en) | 2011-08-12 | 2011-08-12 | Improved quadrilateral hexahedron for revetment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120292611XU CN202187319U (en) | 2011-08-12 | 2011-08-12 | Improved quadrilateral hexahedron for revetment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202187319U true CN202187319U (en) | 2012-04-11 |
Family
ID=45918779
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201120292611XU Expired - Fee Related CN202187319U (en) | 2011-08-12 | 2011-08-12 | Improved quadrilateral hexahedron for revetment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202187319U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104831685A (en) * | 2015-05-21 | 2015-08-12 | 交通运输部天津水运工程科学研究所 | Ecological siltation promotion type beach protection structure |
CN105297676A (en) * | 2015-09-30 | 2016-02-03 | 山东省分析测试中心 | River ecological bank protection system formed by triangular pyramidal wood pile stone cage frames and construction method |
-
2011
- 2011-08-12 CN CN201120292611XU patent/CN202187319U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104831685A (en) * | 2015-05-21 | 2015-08-12 | 交通运输部天津水运工程科学研究所 | Ecological siltation promotion type beach protection structure |
CN105297676A (en) * | 2015-09-30 | 2016-02-03 | 山东省分析测试中心 | River ecological bank protection system formed by triangular pyramidal wood pile stone cage frames and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102677682B (en) | Ecological slope protection structure and construction method thereof | |
Pranzini | Coastal erosion and shore protection: A brief historical analysis | |
CN102070245A (en) | Riverway ecological decontaminating type square frame body and construction, combination and dam fending method thereof | |
CN104831685B (en) | A kind of ecological silt type that promotees protects beach structure | |
Van Dongeren et al. | MICORE: dune erosion and overwash model validation with data from nine European field sites | |
CN202187319U (en) | Improved quadrilateral hexahedron for revetment | |
JP2015048619A (en) | Revetment slope protection structural body and revetment construction method using the same | |
CN205171530U (en) | Add multi -level ecological bank protection of muscle mike pad type | |
CN102912762A (en) | Dam with pile groups and permeable frame and construction method of dam | |
CN205776073U (en) | A kind of shore-beach protection structure taking into account view | |
Xie et al. | Preliminary research on wave forces on quarter circular breakwater. | |
Ostrowski et al. | Groins and submerged breakwaters–new modeling and empirical experience | |
JP2013217052A (en) | Revetment slope protection structure and revetment construction method using the structure | |
CN203174559U (en) | Hydraulic engineering ecological wall | |
CN202989858U (en) | Pile group water permeating frame dam | |
CN105297676A (en) | River ecological bank protection system formed by triangular pyramidal wood pile stone cage frames and construction method | |
Grasso et al. | Experimental flume simulation of sandbar dynamics | |
JP4550231B2 (en) | Bottom sediment movement control method | |
Bulatov et al. | Computing values of crack characteristics in earth dam | |
CN202989757U (en) | Landing stage flood protection device of river bed bare rock | |
CN103122620B (en) | Protective hooking body | |
CN203846451U (en) | Vertical type continuously-distributed hydraulic reclamation dam structure for water area | |
CN103276691B (en) | wall pile frame construction | |
CN202430683U (en) | Underwater bearing platform type shore protection facility | |
CN204690684U (en) | A kind of ecological short silt type protects beach structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120411 Termination date: 20120812 |