CN202187299U - Bridge jacking monitoring device - Google Patents
Bridge jacking monitoring device Download PDFInfo
- Publication number
- CN202187299U CN202187299U CN2011202671623U CN201120267162U CN202187299U CN 202187299 U CN202187299 U CN 202187299U CN 2011202671623 U CN2011202671623 U CN 2011202671623U CN 201120267162 U CN201120267162 U CN 201120267162U CN 202187299 U CN202187299 U CN 202187299U
- Authority
- CN
- China
- Prior art keywords
- monitoring
- jacking
- management module
- bridge
- supervising device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012806 monitoring device Methods 0.000 title abstract 2
- 238000012544 monitoring process Methods 0.000 claims abstract description 52
- 238000006073 displacement reaction Methods 0.000 claims description 18
- 238000004891 communication Methods 0.000 claims description 8
- 238000005086 pumping Methods 0.000 claims description 8
- 238000012545 processing Methods 0.000 claims description 4
- 230000001681 protective effect Effects 0.000 claims description 4
- 238000000034 method Methods 0.000 abstract description 25
- 230000008569 process Effects 0.000 abstract description 21
- 238000010276 construction Methods 0.000 abstract description 16
- 230000008901 benefit Effects 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000001514 detection method Methods 0.000 abstract description 2
- 238000007726 management method Methods 0.000 description 15
- 230000008859 change Effects 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 6
- 238000013519 translation Methods 0.000 description 6
- 230000003993 interaction Effects 0.000 description 4
- 239000003550 marker Substances 0.000 description 4
- 238000011161 development Methods 0.000 description 2
- 239000012467 final product Substances 0.000 description 2
- 230000000977 initiatory effect Effects 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 238000005457 optimization Methods 0.000 description 2
- 238000007639 printing Methods 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 230000007704 transition Effects 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000004438 eyesight Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Landscapes
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
Abstract
The utility model discloses a bridge jacking monitoring device, it includes: the system comprises a task management module, an interface management module and a monitoring system connected with the task management module and the interface management module; the utility model discloses relative prior art has following advantage and beneficial effect: the jacking process of the whole bridge can be monitored in a limited mode, relevant treatment measures can be timely and effectively adopted, the whole construction project is enabled to operate in a more standardized mode, and construction obstacles caused by manual detection are effectively avoided.
Description
Technical field
The utility model relates to the servicing unit that a kind of construction work is used, and relates in particular to the bridge jacking supervising device that a kind of large bridge is used.
Background technology
At present, because the needs of urban planning and development, many buildings, bridge etc. need reconstruction, but wherein are no lack of the building that much still has very high use value, rebuild the labor manpower and financial resources if torn open according to the conventional method.Therefore various jackings technology in building trade, the displacement technology develops rapidly with the emphasis reinforcing technique, becomes and utilizes building, protects the state-of-the-art method of science of building.Certainly, applying to above-mentioned technology aspect the bridge construction reconstruction too.
The bridge jacking The Application of Technology is in the integrality of protection bridge superstructure; The height of lifting bridge satisfies the navigation requirement, and very important meaning is arranged, and it had both saved the cost of investment; Shortened the duration of construction again, little to the pressure influence of traffic.
Certainly, artificial eyesight and experience are leaned in all operations basically during the engineering construction originally, and be so very high to people's requirement, the technical operation of engineering experience need be arranged very much, but still have higher accident rate.Therefore, along with the development of electronics technology, in the process of whole construction, more and more need a kind of electronization, effective detection and the next comprehensive whole construction process of supervising device of constructing.
In sum, along with the construction of large bridge engineering needs, a kind of invention new, that be fit to the bridge jacking supervising device of the safety that the large bridge jacking uses specially is imperative.
The utility model content
The purpose of the utility model is to overcome the deficiency that exists in the prior art, and a kind of bridge jacking supervising device that can be used in large bridge jacking engineering is provided, and the completion jacking safe smoothly for large bridge provides safeguard.
The purpose of the utility model realizes through following technical scheme:
A kind of bridge jacking supervising device is characterized in that it comprises: task management module and interface management module two large divisions and the monitoring system that is connected above-mentioned two modules.
Said task management module comprises hardware management module, communication module, real-time monitoring module and data processing module.
The monitoring position of said supervising device and monitoring content comprise: the observation of (1) bridge floor absolute altitude; (2) monitoring of box-beam structure deformation observation (3) jacking load; (4) jacking stroke observation.
Said supervising device comprises also that pumping plant valve piece place is provided with all carries protective valve.
Said interface management module comprises the setting of controlling parameter before the system operation, comprises pumping plant selections, displacement transducer grouping, hydraulic cylinder is related with displacement transducer and the synchronization accuracy affirmation.
The relative prior art of the utility model has the following advantages and beneficial effect: the jacking process of the whole bridge of monitoring that can be limited; And can take the relevant treatment measure timely and effectively; Make the more standard performance of whole construction engineering, effectively avoided because artificial detect former thereby the construction obstacle that causes.
Description of drawings:
Combine the description of its accompanying drawing through following embodiment, can further understand and use novel purpose, specific structural features and advantage in fact the utility model.Wherein, accompanying drawing is:
Fig. 1 is the overall flow sketch map of the utility model bridge jacking supervising device;
The specific embodiment:
Below in conjunction with the instance among the figure the utility model is done further to describe.
No matter jacking or translation, whole operation control all is in central control room, to accomplish, therefore, operating personnel should be able to monitor the various parameters of works transition process at central control room, and control procedure is adjusted in real time, reach the purpose of dynamic optimization.In order to accomplish above-mentioned purpose, on the master control computer monitoring software has been installed.Under Windows 2000 operating systems, adopt three-dimensional force control configuration software to work out monitoring software, the structure of this monitoring software is as shown in Figure 1.Monitoring software mainly is made up of task management module and interface management module two large divisions.
Task management module real-time comprises hardware management, communication, monitoring and data in real time, and hardware management module is mainly carried out self-test to various hardware before use, guarantees the hardware operate as normal; The communication module real-time is the strongest, and serial communication is here accomplished between master control computer and the PLC; Real-time monitoring module mainly is that each cylinder pressure and displacement are carried out the dynamic decision optimal control, shows in real time, also can observe with the form of performance graph simultaneously, is convenient to the overall process of monitor pressures and change in displacement; Data processing module can storage system initiation parameter and real-time data base, simultaneously also can printing data report form.
The function of man-machine interaction is mainly accomplished at the interface of monitoring system.Parameter is provided with the setting that the interface provides the preceding controlling parameter of system's operation; Comprise pumping plant selection, displacement transducer grouping, hydraulic cylinder is related with displacement transducer and synchronization accuracy etc.; These parameters are provided with all and can be kept in the engineering; If do not change when use next time, these parameters needn't be provided with again.Weigh, jacking, translation interface mainly be used for showing pressure and displacement, shows with the form of data, if want to observe the real-time change trend of pressure and displacement, need switch to the performance graph interface to get final product.Single cylinder debugging interface all can be called in any process, carries out man-machine interaction, adjusts the up-down of selected cylinder pressure.
Beam key point synchronously falls
Maximum difficult point in dropping process is that hydraulic power unit is being opened in a flash, and the jack that connects pumping plant all is to carry lighter opening earlier, causes the jack heavy duty of original pad heavy more like this, and underloading is light more, and this causes fatal danger to the whereabouts.The protective valve (balanced protection valve) that all carries that the applicant is provided with at pumping plant valve piece place has solved this crucial difficult point.When the oil cylinder that all carries protective valve when a plurality of bands supported a heavy duty simultaneously, when needs descended synchronously, the oil cylinder that load is bigger can be opened earlier.
The monitoring of this programme refers in the jacking process monitoring carried out for the whole attitude that guarantees bridge to comprise translation, rotation and the lateral attitude monitoring of structure that monitoring is in the jacking overall process.
The bridge jacking process is a dynamic process, and along with the lifting of superstructure, bigger variation can take place for the along track bias of beam, plate-girder gap etc.A whole set of monitoring system to be set for this reason, and will set necessary early warning value and limiting value, so that attitude data is fed back to construction loading process.
Monitoring position and monitoring content:
(1) foundation settlement survey: the foundation settlement survey system is set reacts cushion cap sedimentation situation, in time make relative measures.
(2) bridge floor absolute altitude observation: bridge floor elevation observation point is used for calculating the actual top lifting height of each bridge pier.Bridge floor absolute altitude observation point is set makes the actual top lifting height of every bridge pier define foundation, the bridge floor absolute altitude is effectively controlled to make jacking put in place afterwards.
(3) bent cap bottom surface level measurement: it is replenishing of control of bridge floor absolute altitude and measurement, and auxiliary jacking operation foundation is provided
(4) bent cap length travel observation
For observation to bent cap length travel in the jacking process and column verticality, eject vertical projecting line at the outer column lateral surface with the line of ink marker, the line of ink marker must be crossed below the cut surface by bullet, at shot of the top of vertical line of ink marker suspension.Whether the length travel of relatively judging bent cap and bent cap through the plumb bob line and the line of ink marker tilt.
(5) observation of support system
Through observation, can in time grasp the deflection that the stressed of support system and distortion situation in time take measures to control support system, construction is carried out under the controlled environment of safety.
Monitoring scheme is implemented
(1) monitoring is prepared
Mainly be to arrange measuring point.
(2) monitoring before the construction
It mainly is the initial value of each monitoring point being obtained each item monitoring parameter.Like observation point coordinate situation, absolute altitude etc.
(3) integral jacking monitoring
Comprise jacking, the monitoring of the processes such as beam that support, fall.The monitoring content mainly comprises the whole attitude monitoring, ess-strain monitoring etc. of displacement monitoring, bridge.
Monitoring organization arrangement
Monitoring plan should be coordinated with the Construction Plan of jacking mutually, and can in implementation process, improve, and its monitoring result should in time feed back to on-the-spot commander in chief.
Press following principle arrangement during monitoring:
1. the monitoring plan of formulating in advance;
2. crucial construction link carries out necessary monitoring;
When 3. special operation condition takes place, replenish monitoring;
4. monitoring result occurs when unusual, replenishes monitoring;
That is, the monitoring of the technical scheme of the utility model refers in the jacking process monitoring carried out for the whole attitude that guarantees bridge to comprise translation, rotation and the inclination of structure.Monitoring is in the jacking overall process.Monitoring position and monitoring content comprise: the observation of (1) bridge floor absolute altitude; (2) monitoring of box-beam structure deformation observation (3) jacking load; (4) jacking stroke observation;
Monitoring system: no matter jacking or translation; Whole operation control all is in central control room, to accomplish, and therefore, operating personnel should be able to monitor the various parameters of works transition process at central control room; And control procedure adjusted in real time, reach the purpose of dynamic optimization.In order to accomplish above-mentioned purpose, on the master control computer monitoring software has been installed.Under Windows 2000 operating systems, adopt three-dimensional force control configuration software to work out monitoring software.Monitoring software mainly is made up of task management module and interface management module two large divisions.
Task management module real-time comprises hardware management, communication, monitoring and data in real time, and hardware management module is mainly carried out self-test to various hardware before use, guarantees the hardware operate as normal; The communication module real-time is the strongest, and serial communication is here accomplished between master control computer and the PLC; Real-time monitoring module mainly is that each cylinder pressure and displacement are carried out the dynamic decision optimal control, shows in real time, also can observe with the form of performance graph simultaneously, is convenient to the overall process of monitor pressures and change in displacement; Data processing module can storage system initiation parameter and real-time data base, simultaneously also can printing data report form.
The function of man-machine interaction is mainly accomplished at the interface of monitoring system.Parameter is provided with the setting that the interface provides the preceding controlling parameter of system's operation; Comprise pumping plant selection, displacement transducer grouping, hydraulic cylinder is related with displacement transducer and synchronization accuracy etc.; These parameters are provided with all and can be kept in the engineering; If do not change when use next time, these parameters needn't be provided with again.Weigh, jacking, translation interface mainly be used for showing pressure and displacement, shows with the form of data, if want to observe the real-time change trend of pressure and displacement, need switch to the performance graph interface to get final product.Single cylinder debugging interface all can be called in any process, carries out man-machine interaction, adjusts the up-down of selected cylinder pressure.
Those of ordinary skill in the art will be appreciated that; Above embodiment only is the purpose that is used for explaining the utility model; And be not with the qualification of doing the utility model; As long as in the essential scope of the utility model, in the scope to the variation of the above embodiment, claim that modification all will drop on the utility model.
Claims (5)
1. bridge jacking supervising device is characterized in that it comprises: task management module and interface management module two large divisions and the monitoring system that is connected above-mentioned two modules.
2. bridge jacking supervising device according to claim 1 is characterized in that, said task management module comprises hardware management module, communication module, real-time monitoring module and data processing module.
3. bridge jacking supervising device according to claim 2 is characterized in that, the monitoring position of said supervising device and monitoring content comprise: the observation of (1) bridge floor absolute altitude; (2) monitoring of box-beam structure deformation observation (3) jacking load; (4) jacking stroke observation.
4. bridge jacking supervising device according to claim 2 is characterized in that, said supervising device comprises also that pumping plant valve piece place is provided with all carries protective valve.
5. bridge jacking supervising device according to claim 4; It is characterized in that; Said interface management module comprises the setting of controlling parameter before the system operation, comprises pumping plant selections, displacement transducer grouping, hydraulic cylinder is related with displacement transducer and the synchronization accuracy affirmation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202671623U CN202187299U (en) | 2011-07-25 | 2011-07-25 | Bridge jacking monitoring device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202671623U CN202187299U (en) | 2011-07-25 | 2011-07-25 | Bridge jacking monitoring device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202187299U true CN202187299U (en) | 2012-04-11 |
Family
ID=45918760
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011202671623U Expired - Fee Related CN202187299U (en) | 2011-07-25 | 2011-07-25 | Bridge jacking monitoring device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202187299U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103806376A (en) * | 2014-03-18 | 2014-05-21 | 上海理工大学 | Jack quick adjusting method in bridge four-point jacking construction |
CN104099868A (en) * | 2013-04-10 | 2014-10-15 | 财团法人中华顾问工程司 | Bridge jacking synchronous control integration system |
CN110671989A (en) * | 2019-05-31 | 2020-01-10 | 南京奥达升智能科技有限公司 | Control system based on bridge jacking intelligence double displacement sensor |
-
2011
- 2011-07-25 CN CN2011202671623U patent/CN202187299U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104099868A (en) * | 2013-04-10 | 2014-10-15 | 财团法人中华顾问工程司 | Bridge jacking synchronous control integration system |
CN103806376A (en) * | 2014-03-18 | 2014-05-21 | 上海理工大学 | Jack quick adjusting method in bridge four-point jacking construction |
CN103806376B (en) * | 2014-03-18 | 2015-10-28 | 上海理工大学 | Jack fast adjustment method in bridge 4 jack-up constructions |
CN110671989A (en) * | 2019-05-31 | 2020-01-10 | 南京奥达升智能科技有限公司 | Control system based on bridge jacking intelligence double displacement sensor |
CN110671989B (en) * | 2019-05-31 | 2020-10-09 | 南京奥达升智能科技有限公司 | Control system based on bridge jacking intelligence double displacement sensor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zhou et al. | Cyber-physical-system-based safety monitoring for blind hoisting with the internet of things: A case study | |
CN100478813C (en) | Hydraulic hoisting monitor system and its use in hydraulic hoisting control | |
RU2691270C2 (en) | Workflow digital support system | |
CN108002239A (en) | A kind of security monitoring system of hoister | |
CN102530732B (en) | Hydraulic hoisting, slipping and emplacing method and equipment for large scale press components | |
CN101763053A (en) | Movable type bridge security detection and analysis management system | |
CN202187299U (en) | Bridge jacking monitoring device | |
CN204898525U (en) | Railway frame bridge crane safety monitoring system | |
CN112761199A (en) | Static pressure anchor rod pile and broken pile underpinning supporting device for high-rise deviation correction and monitoring method thereof | |
CN115983649A (en) | Water conservancy wisdom building site system | |
CN113914289A (en) | Intelligent monitoring method for gravel vibroflotation pile construction process | |
CN110359373A (en) | Beam body method for correcting error for transom pier bridge | |
CN202298466U (en) | Synchronous jacking control device | |
CN104120885A (en) | Pump truck as well as system and method for monitoring fatigue health condition of pump truck boom | |
CN107451726B (en) | Dynamic compaction construction quality online real-time control method and dynamic compaction informatization construction method | |
CN102889984A (en) | In-situ static-loading safety performance detection method of waveform beam guardrail | |
CN111691909B (en) | Hydraulic support backpressure monitoring system and method | |
CN113775363B (en) | Intelligent sensing system for condition of roof of coal mine working face | |
CN207760903U (en) | High-precision coordinate measures excavator | |
CN110849455A (en) | Material weighing method of large mining excavator | |
CN202298465U (en) | Bridge jacking system | |
CN213579913U (en) | Force measuring sand box for swivel bridge | |
CN209256278U (en) | A kind of shield cutter assembly workbench | |
CN102662355B (en) | Safety monitoring and managing model of large-tonnage carrying and installing equipment | |
CN107558738B (en) | Build the vertical displacement automatic balancing method of reverse dismounting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
DD01 | Delivery of document by public notice |
Addressee: Shanghai Xianwei Civil Engineering Co., Ltd. Document name: Notification to Pay the Fees |
|
DD01 | Delivery of document by public notice |
Addressee: Shanghai Xianwei Civil Engineering Co., Ltd. Document name: Notification of Termination of Patent Right |
|
DD01 | Delivery of document by public notice | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120411 Termination date: 20160725 |
|
CF01 | Termination of patent right due to non-payment of annual fee |