CN202171239U - Novel boiler provided with air supply preheating device - Google Patents

Novel boiler provided with air supply preheating device Download PDF

Info

Publication number
CN202171239U
CN202171239U CN2011202383096U CN201120238309U CN202171239U CN 202171239 U CN202171239 U CN 202171239U CN 2011202383096 U CN2011202383096 U CN 2011202383096U CN 201120238309 U CN201120238309 U CN 201120238309U CN 202171239 U CN202171239 U CN 202171239U
Authority
CN
China
Prior art keywords
preheating device
air supply
air
heat
heater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202383096U
Other languages
Chinese (zh)
Inventor
李晓峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huisheng Group Co Ltd
Original Assignee
Huisheng Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huisheng Group Co Ltd filed Critical Huisheng Group Co Ltd
Priority to CN2011202383096U priority Critical patent/CN202171239U/en
Application granted granted Critical
Publication of CN202171239U publication Critical patent/CN202171239U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/34Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery

Landscapes

  • Air Supply (AREA)

Abstract

带有送风预热装置的新型锅炉,包括炉体、与炉体相连的连续排污装置、送风口安装于所述炉体上的送风机以及与所述送风机连通的送风管道,所述送风管道上设有用于加热送风的预热装置。本实用新型利用锅炉连排水的余热对送风进行加热,不仅提高了燃烧效率,而且减少了能源浪费。

A new type of boiler with an air supply preheating device, including a furnace body, a continuous sewage discharge device connected to the furnace body, a blower fan with an air supply port installed on the furnace body, and an air supply pipeline connected with the blower fan. The pipeline is provided with a preheating device for heating the air supply. The utility model uses the residual heat of the boiler and the drainage to heat the air supply, which not only improves the combustion efficiency, but also reduces energy waste.

Description

The New-type boiler that has the preheating device of blowing
Technical field
The utility model relates to a kind of boiler, is specifically related to a kind of New-type boiler that has the preheating device of blowing.
Background technology
For guaranteeing steam quality, the above boiler of 10t/h generally is equipped with continuous blow off equipment, and the flash steam that in continuous blow off equipment, produces gets into the feedwater of oxygen-eliminating device heating boiler, and gets into trench from a large amount of high-temperature water that continuous blow off equipment is discharged, and causes the waste of the energy.Simultaneously, traditional boiler is provided with pressure fan, utilizing pressure fan air-supply in the body of heater to realize the abundant burning of fuel, improves efficiency of combustion, but pressure fan sends into is cold air, and with respect to hot-air, cold air reduces efficiency of combustion greatly.
The utility model content
The utility model technical problem to be solved provides a kind of New-type boiler that has the preheating device of blowing, its can with pressure fan send in the body of heater air heat in advance, improve efficiency of combustion, thereby eliminate defective in the above-mentioned background technology.
For realizing above-mentioned purpose, the utility model adopts following technical scheme:
The New-type boiler that has the preheating device of blowing; Comprise the air supply duct that body of heater, the continuous blow off equipment that links to each other with body of heater, air outlet are installed on the pressure fan on the said body of heater and are communicated with said pressure fan, said air supply duct is provided with the preheating device that is used to heat air-supply.
As the design of routine, said preheating device can adopt firing equipments such as miniature boiler, and preheating device is installed on the upstream position of said pressure fan, with the air-supply heating that gets in the body of heater, has improved the efficiency of combustion of body of heater fuel.
As a kind of improvement, said preheating device is a gas-liquid heat-exchange, and said gas-liquid heat-exchange comprises housing and the heat exchanger tube that is arranged at enclosure interior.
As the design of routine, can feed hot water in the said heat exchanger tube, through heat exchange to temperature lower air-supply carry out preheating.
As a kind of further improvement, said heat exchanger tube is communicated with the outlet pipe of said continuous blow off equipment, and based on this structure, said heat exchanger tube can utilize the heating of will blowing of the waste heat of boiler platoon water, has not only improved efficiency of combustion, and has reduced energy waste.
The utility model has following beneficial effect owing to adopted above structure:
In the utility model, on the air supply duct of pressure fan, install and be used to heat the preheating device of air-supply, the air-supply that will get in the body of heater is heated, go into after the stove air is heated, can improve the efficiency of combustion of body of heater fuel.
In the utility model, preheating device adopts gas-liquid heat-exchange, and the heat exchanger tube of gas-liquid heat-exchange is communicated with the outlet pipe of continuous blowdown system of boiler device, can utilize the waste heat of boiler platoon water to give the air-supply heating, has reduced energy waste.
Description of drawings
Accompanying drawing is the utility model structural representation;
Among the figure: 1. body of heater, 2. continuous blow off equipment, 3. pressure fan, 4. gas-liquid heat-exchange, 5. air supply duct, 6. housing, 7. heat exchanger tube, 8. outlet pipe.
The specific embodiment
For technological means, creation characteristic that the utility model is realized, reach purpose and be easy to understand understanding with effect, below in conjunction with concrete diagram, further set forth the utility model.
Shown in accompanying drawing; The New-type boiler that has the preheating device of blowing; Comprise body of heater 1, be installed on the continuous blow off equipment 2 on the body of heater 1, the air supply duct 5 that the air-supply mouth of pipe is installed on the pressure fan 3 on the body of heater and is communicated with said pressure fan 3; It is characterized in that: also be provided with the preheating device that is used to heat air-supply, this preheating device adopts gas-liquid heat-exchange 4, and said gas-liquid heat-exchange 4 is installed on the said air supply duct 5; Said gas-liquid heat-exchange 4 comprises housing 6 and is arranged at housing 6 inside be used to the to circulate heat exchanger tube 7 of high-temp liquid that said heat exchanger tube 7 is communicated with the outlet pipe 8 of said continuous blow off equipment 2.
The principle of the utility model is following:
The flash steam that boiler produces in continuous blow off equipment 2 gets into the feedwater of oxygen-eliminating device heating boiler; And a large amount of high-temperature water of discharging from continuous blow off equipment 2; High-temperature water gets in the heat exchanger tube 7 of gas-liquid heat-exchange 4; Pressure fan 3 is sent into the air heat in the body of heater 1, and the air after the heating gets into body of heater 1 and participates in burning.The mode that this waste heat that utilizes boiler platoon water heats air-supply has not only improved efficiency of combustion, and has reduced energy waste.
The utility model is not limited to the above-mentioned specific embodiment, and all are based on the technical conceive of the utility model, and the structural improvement of having done all falls among the protection domain of the utility model.

Claims (3)

1. the New-type boiler that has the preheating device of blowing; Comprise the air supply duct that body of heater, the continuous blow off equipment that links to each other with body of heater, air outlet are installed on the pressure fan on the said body of heater and are communicated with said pressure fan, it is characterized in that: said air supply duct is provided with the preheating device that is used to heat air-supply.
2. the New-type boiler that has the preheating device of blowing according to claim 1 is characterized in that: said preheating device is a gas-liquid heat-exchange, and said gas-liquid heat-exchange comprises housing and the heat exchanger tube that is arranged at enclosure interior.
3. the New-type boiler that has the preheating device of blowing according to claim 2 is characterized in that: said heat exchanger tube is communicated with the outlet pipe of said continuous blow off equipment.
CN2011202383096U 2011-07-07 2011-07-07 Novel boiler provided with air supply preheating device Expired - Fee Related CN202171239U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202383096U CN202171239U (en) 2011-07-07 2011-07-07 Novel boiler provided with air supply preheating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202383096U CN202171239U (en) 2011-07-07 2011-07-07 Novel boiler provided with air supply preheating device

Publications (1)

Publication Number Publication Date
CN202171239U true CN202171239U (en) 2012-03-21

Family

ID=45829434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202383096U Expired - Fee Related CN202171239U (en) 2011-07-07 2011-07-07 Novel boiler provided with air supply preheating device

Country Status (1)

Country Link
CN (1) CN202171239U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108267031A (en) * 2018-01-25 2018-07-10 浙江旺能环保有限公司 The heat-exchanger rig of boiler inlet temperature is improved using platoon or hydrophobic waste heat

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108267031A (en) * 2018-01-25 2018-07-10 浙江旺能环保有限公司 The heat-exchanger rig of boiler inlet temperature is improved using platoon or hydrophobic waste heat
CN108267031B (en) * 2018-01-25 2023-10-13 浙江旺能环保有限公司 Heat exchange device for improving air inlet temperature of boiler by utilizing continuous-discharge or drainage waste heat energy

Similar Documents

Publication Publication Date Title
CN104654815A (en) Mosaic ceramic kiln waste heat power generation comprehensive utilization system
CN202546917U (en) Heater using smoke waste heat
CN210070225U (en) A boiler with condensing function
CN105570918A (en) Energy-saving boiler
CN202171239U (en) Novel boiler provided with air supply preheating device
CN201259303Y (en) Coal briquette energy-conserving environment protection water heater
CN204421052U (en) A kind of waste heat recovery furnace
CN104748367B (en) The dustless hot air boiler of Superstrong energy-saving
CN104501198B (en) Heat conduction oil boiler waste heat power generation system
CN106048183B (en) A kind of biomass electricity Dual-energy source heat-treatment furnace
CN204400929U (en) A kind of biomass gasifying furnace and the efficient heating system of industrial combustion gas unified boiler
CN204421038U (en) Thermal oil boiler waste heat power generation system
CN204513747U (en) A kind of cornue forced circulation burning coal powder hot-water boiler
CN202792545U (en) A gas water heater with a waste heat recovery device
CN204923441U (en) High -efficient environmental protection hot -blast furnace
CN204534546U (en) Biomass boiler environmental protection and energy saving control system
CN203687368U (en) Secondary heat exchanger of fuel gas heating water heater
CN100520268C (en) Fume-fume hot pipe heater exchanger for fume desulphurization in heat-engine plant
CN201916891U (en) Energy-saving overheating steamer
CN202361354U (en) Heat pipe heat exchange recovery fume waste heat series device
CN206905002U (en) Drying sludge burns and flue gas purification system
CN207599978U (en) Domestic heating miniature boiler
CN204063259U (en) A kind of energy-saving hot blast furnace
CN203177449U (en) Energy saving hot blast furnace
CN205119504U (en) Condensing gas heating bath dual-purpose furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120321

Termination date: 20150707