CN202166730U - Alarm apparatus for ONU device double-channel redundant power supply - Google Patents

Alarm apparatus for ONU device double-channel redundant power supply Download PDF

Info

Publication number
CN202166730U
CN202166730U CN 201120261148 CN201120261148U CN202166730U CN 202166730 U CN202166730 U CN 202166730U CN 201120261148 CN201120261148 CN 201120261148 CN 201120261148 U CN201120261148 U CN 201120261148U CN 202166730 U CN202166730 U CN 202166730U
Authority
CN
China
Prior art keywords
alarm
power supply
onu
power
redundant power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120261148
Other languages
Chinese (zh)
Inventor
陆广林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sky, Shenzhen intelligence development net Science and Technology Ltd.
Original Assignee
SHENZHEN SKYEE OPTICAL FIBER COMMUNICATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN SKYEE OPTICAL FIBER COMMUNICATION TECHNOLOGY Co Ltd filed Critical SHENZHEN SKYEE OPTICAL FIBER COMMUNICATION TECHNOLOGY Co Ltd
Priority to CN 201120261148 priority Critical patent/CN202166730U/en
Application granted granted Critical
Publication of CN202166730U publication Critical patent/CN202166730U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The alarm apparatus for an ONU device double-channel redundant power supply, comprising a double redundant power supply circuit; an alarm detection chip, wherein two I/O pins of the alarm detection chip are respectively connected with two power supply circuits of the double redundant power supply circuit; and two-channel alarm signal output end, wherein the first channel of alarm signal is output through an external interface, and the second channel of alarm signal is output to a power supply management chip CPU. The alarm apparatus for ONU device double channel redundant power supply thoroughly resolves the technical problem that the ONU power supply is provided with no an effective management method, thereby greatly increasing the power supplying guarantee of the ONU, and can reflect the power supply condition of all ONUs of an electric power EPON in an area in real time, thereby providing reliable basis for the robustness assessment of the whole intelligent power grid.

Description

The alarm device of ONU equipment two-way redundant power
Technical field
The utility model relates to electrical network and detects, particularly the failure detector of Ethernet passive optical network ONU equipment two-way redundant power in the electric intelligent electrical network field.
Background technology
In recent years national grid has proposed all-round construction and has been the basis with electrical networks at different levels, turns to the autonomous innovation of characteristic, intelligent grid leading in the world with informationization, digitizing, robotization, interaction.
The EPON technology in the field of telecommunications widespread use, and is realized the major technique ingredient of power distribution automation as a kind of communication technology of maturation as intelligent grid by the national grid approval.EPON is applied to the power industry field of high reliability request as a kind of up-to-date access network technology, aspect the high reliability assurance, needs to drop into a large amount of basic research works.Electric power EPON system is mainly by three parts: OLT system, ONU system, ODN Optical Distribution Network are formed.At present a lot of research institutions and device fabrication manufacturer to three chief components of electric power EPON, have done a large amount of high reliability researchs and design.At present to the intelligent grid high reliability request; ONU equipment has adopted two-way redundant power technology, and ONU power supply link high reliability guarantees to improve a lot, under the situation of one tunnel power-fail; Another road power supply operate as normal, thus the equipment that guarantees runs without interruption.But one road power supply breaks down, and under the situation of another road power supply operate as normal, whole ONU equipment is just in the work of single service state.This single channel power work state has just lost the initial design meaning that double loop power supply designs.How to learn that some ONU has been in this single channel duty, the ONU that particularly is in the power industry environment is hundreds and thousands of, is distributed in each complicated place of operation power, and regular visit obviously is inappropriate method.Electric power ONU to electric power ONU power management, does not form power-fail detection, warning information transmission and the alarm report measure of a cover system at present except taking two-way redundant power technology to improve the ONU power supply assurance.Do not have effective ONU electric power management mechanism, there is defective in electric power ONU high reliability, and then has influence on the stability of whole electric power EPON transmission system, and might the high reliability of whole intelligent grid be exerted far reaching influence.
Summary of the invention
The utility model provides a kind of alarm device of two-way redundant power, adopts detection chip that dual power supply is detected, and power supply is effectively managed, and solves in the prior art with nowhere to turn to alert machine-processed technical matters.
The utility model is the alarm device that solves the problems of the technologies described above this ONU equipment two-way redundant power that provides; Comprise two redundant power circuits; Also comprise the alarm detection chip; Two I/O pins of this alarm detection chip connect respectively in two power circuits of above-mentioned pair of redundant power circuits, and this alarm detection chip also includes the alarm signal output terminal.This alarm device also comprises power management chip CPU, and said alarm detection chip and power management chip are same chip.
Said alarm signal output terminal is a two-way; Wherein first via alarm signal is through external interface output; The second tunnel alarm signal exports power management chip CPU to, and this alarm device also includes relay, and said first via alarm signal exports external interface to through relay; This alarm device also comprises two groups of signal lamps, and these two groups of signal lamps are connected in two power circuits of two redundant power circuits.
The warning system design of electric power ONU high reliability two-way redundant power; Thoroughly having solved the ONU power supply does not have the technical matters of effective management method; A series of realistic problems in the application have also been solved; Improved the power supply guarantee of ONU greatly, can reflect the power supply situation of section all ONU of electric power EPON in real time, for whole intelligent grid robustness assessment provides reliable basis.This warning system can reduce intelligent grid communication facilities maintainer scene greatly and patrol and examine working strength, can the minimizing personnel drops into, and reduces because frequent power equipment field maintemance, the security risk or the accident risk that bring to the maintainer.When bringing more high reliability, for the electric power networks operation, safeguard considerable economic benefit for intelligent grid.
Description of drawings
Fig. 1 is the circuit diagram that the utility model power supply detects.Fig. 2 is the circuit diagram of first alarm signal output in the utility model.Fig. 3 is the utility model alarm device principle of work block diagram.Fig. 4 is the process block diagram of the utility model fault warning.Fig. 5 is the process block diagram of the utility model trouble shooting.
Embodiment
Specific embodiment in conjunction with above-mentioned description of drawings the utility model.
By knowing among Fig. 1 to Fig. 5; The alarm device of this ONU equipment two-way redundant power comprises two redundant power circuits; Also comprise alarm detection chip U; Two I/O pins (V1_DATECT and V2_DATECT) of this alarm detection chip are connected respectively in two power circuits of above-mentioned pair of redundant power circuits, and this alarm detection chip also includes the alarm signal output terminal.This alarm device also comprises power management chip CPU, and the alarm detection chip can be same chip with power management chip, and said alarm signal output terminal is a two-way; Wherein first via alarm signal is through external interface output; The second tunnel alarm signal exports power management chip CPU to, and this alarm device also includes relay, and said first via alarm signal exports external interface to through relay; When the I/O mouth V1_DATECT that is connected to CPU and V2_DATECT signal produce when unusual; Another level that is used to produce the GPIO pin of alarm signal will change, and drives relay LS with this signal, will produce a switching value signal.This alarm device also comprises two groups of signal lamp LED1 and LED2, and these two groups of signal lamps are connected in two power circuits of two redundant power circuits.
By can knowing among Fig. 1 and Fig. 2, ONU adopts the power supply of two-way redundant power, and losing efficacy when the power supply of one road power supply is, other one the tunnel still can normal power supply, guarantees that ONU equipment is not because one tunnel power-fail and interrupt run.This inefficacy comprises that externally fed lost efficacy the inefficacy that the ONU power supply causes itself.When one road power supply power supply occurring and losing efficacy, the two-way alarm signal of ONU through the hardware generation first via and the second tunnel (below be called A, B road alarm signal).A road alarm signal is through the device external interface, offers other watch-dog with the mode of switching value, does subsequent use.B road alarm signal is told ONU CPU management through the ONU internal mechanism, and the ONU CPU management is further notified OLT equipment through ONU internal alarm mechanism, and OLT internal alarm mechanism further feeds back to network management center.The electrical network Operation and Maintenance Center is received the alarm notification of network management center; Can further make a strategic decision; Whether need send electrical network O&M personnel site disposal fault in real time,, can be used as section electrical network network equipment robustness assessment foundation simultaneously to the tabulate statistics of above warning information.
By knowing among Fig. 3 to Fig. 5, the alarm business flow process comprises following process:
System initialization:
When ONU initiates registration, local all the alarm status information of ONU System Cleaning; When registration was accomplished, ONU was through the alarm mode, and the local alarm information newly collecting is reported to the upper management system successively, comprises power alarm.When ONU initiates registration, all alarm statuses of this ONU of EMS System Cleaning.
Alarm:
Power supply occurs unusual, and ONU power-supply system hardware detection is provided with the alarm of alarm switch amount for certain state to unusual; The ONU CPU management detects power alarm through the GPIO interface, starts ONU power alarm flow process; The ONU management system is further judged the current power alarm state of ONU, and whether decision initiates new power alarm; If the new power fail (power alarm of non-new generation that produces; The ONU management system is ignored); ONU management system assembling alarm information message; Alarming mechanism through ONU CTC protocol stack is delivered to OLT to warning message, and OLT further is delivered to EPON management system EMS to alarm information; The current power supply status of EMS systematic analysis ONU; If the new power fail alarm (power alarm of non-new generation, the EMS system is ignored) that produces, the power supply status of modification ONU; Be set to alarm status, the state of revising EMS grid topological diagram device node is the power alarm state; EMS ALM system is through alarm liaison method (list etc. is sent in SMS, Email, plant maintenance), sending to the plant maintenance personnel for information about.
Alarm is removed:
Power fail is eliminated, and ONU power-supply system hardware detection power supply is normal, and it is that power supply is normal that the alarm switch amount is set; It is normal that the ONU CPU management detects power supply through the GPIO interface, starts ONU power alarm flow process; The ONU management system is further judged the current power alarm state of ONU, and whether decision is initiated new power fail and eliminated alarm; If current state is that (power supply status is for normal for power fail; The ONU management system is ignored), ONU management system assembling alarm information message is through the alarming mechanism of ONU CTC protocol stack; Be delivered to OLT to warning message, OLT further is delivered to EPON management system EMS to alarm information; The current power supply status of EMS systematic analysis ONU; If current state is power fail (power supply status is for normal, and the EMS management system is ignored), revise the power supply status of ONU; Be set to normal condition, the state of revising EMS grid topological diagram device node is the power supply normal condition; EMS ALM system is through alarm liaison method (list etc. is sent in SMS, Email, plant maintenance), sending to the plant maintenance personnel for information about.
Above content is to combine concrete preferred implementation to the further explain that the present invention did, and can not assert that practical implementation of the present invention is confined to these explanations.For the those of ordinary skill of technical field under the present invention, under the prerequisite that does not break away from the present invention's design, can also make some simple deduction or replace, all should be regarded as belonging to protection scope of the present invention.

Claims (6)

1. the alarm device of an ONU equipment two-way redundant power; Comprise two redundant power circuits; It is characterized in that: also comprise the alarm detection chip; Two I/O pins of this alarm detection chip connect respectively in two power circuits of above-mentioned pair of redundant power circuits, and this alarm detection chip also includes the alarm signal output terminal.
2. according to the alarm device of the said ONU equipment of claim 1 two-way redundant power, it is characterized in that: this alarm device also comprises power management chip CPU.
3. according to the alarm device of the said ONU equipment of claim 2 two-way redundant power, it is characterized in that: said alarm detection chip and power management chip are same chip.
4. according to the alarm device of claim 2 or 3 said ONU equipment two-way redundant powers; It is characterized in that: said alarm signal output terminal is a two-way; Wherein first via alarm signal is through external interface output, and the second tunnel alarm signal exports power management chip CPU to.
5. according to the alarm device of the said ONU equipment of claim 1 two-way redundant power, it is characterized in that: this alarm device also includes relay, and said first via alarm signal exports external interface to through relay.
6. according to the alarm device of the said ONU equipment of claim 1 two-way redundant power, it is characterized in that: this alarm device also comprises two groups of signal lamps, and these two groups of signal lamps are connected in two power circuits of two redundant power circuits.
CN 201120261148 2011-07-22 2011-07-22 Alarm apparatus for ONU device double-channel redundant power supply Expired - Fee Related CN202166730U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120261148 CN202166730U (en) 2011-07-22 2011-07-22 Alarm apparatus for ONU device double-channel redundant power supply

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120261148 CN202166730U (en) 2011-07-22 2011-07-22 Alarm apparatus for ONU device double-channel redundant power supply

Publications (1)

Publication Number Publication Date
CN202166730U true CN202166730U (en) 2012-03-14

Family

ID=45802547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120261148 Expired - Fee Related CN202166730U (en) 2011-07-22 2011-07-22 Alarm apparatus for ONU device double-channel redundant power supply

Country Status (1)

Country Link
CN (1) CN202166730U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110488199A (en) * 2019-09-04 2019-11-22 国网湖南省电力有限公司 A kind of high capacity cell energy-accumulating power station battery system alarm response method
CN111123139A (en) * 2018-10-30 2020-05-08 中国移动通信集团广东有限公司 Power supply guarantee system, early warning device and guarantee and early warning method of optical line terminal

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111123139A (en) * 2018-10-30 2020-05-08 中国移动通信集团广东有限公司 Power supply guarantee system, early warning device and guarantee and early warning method of optical line terminal
CN110488199A (en) * 2019-09-04 2019-11-22 国网湖南省电力有限公司 A kind of high capacity cell energy-accumulating power station battery system alarm response method

Similar Documents

Publication Publication Date Title
CN102510048B (en) Anti-override trip protection method
CN106452571B (en) Electric power terminal communication access net topological relation faulty section determines and analysis method
CN105896470A (en) Double loop network-based protection device free of main in-situ transformer and protection method
CN105529831A (en) Auxiliary fault analysis system for secondary equipment of intelligent substation
CN110460372A (en) A kind of passive optical network alarm management method and device
CN109687590A (en) A kind of be classified stops send a telegram in reply report method, system
CN105790990A (en) Method and system for monitoring and managing power distribution and utilization communication business
CN103095501B (en) A kind of method of real-time of ONU equipment operation conditions
CN104468508A (en) Automatic-adapting protocol converter
CN110752959A (en) Intelligent substation process layer physical link fault positioning system
CN111654104A (en) Power distribution room running state fault monitoring system
CN101166069A (en) Method and system for automatic switching of optical module in optical transmission network
CN107785998B (en) Monitoring method of distribution automation equipment in distribution system
CN202166730U (en) Alarm apparatus for ONU device double-channel redundant power supply
CN104869012B (en) System and method are monitored based on dispatching of power netwoks phone comprehensive warning
CN103296756A (en) Managing and monitoring system for transformer substation
CN203455712U (en) Transformer station equipment centralized control and inspection tour online-monitoring system
CN106712298B (en) Monitoring system for distribution automation system
CN103441793A (en) Method for realizing reliable communication between optical links
CN103065428A (en) Alarming method of converting station monitoring system
CN102394765A (en) Method for positioning faults of cable television network management system
CN201403096Y (en) Fault and power-off protection device for optical transmission device
CN101839955B (en) Network video coder for realizing power failure alarm and method for monitoring power failure
CN107040309B (en) Optical fiber communication broken link rapid monitoring method based on physical layer
CN205595896U (en) Net monitored control system is joined in marriage to distributing type photovoltaic

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Alarm apparatus for ONU device double-channel redundant power supply

Effective date of registration: 20121017

Granted publication date: 20120314

Pledgee: Shenzhen SME credit financing guarantee Group Co., Ltd.

Pledgor: Shenzhen Skyee Optical Fiber Communication Technology Co., Ltd.

Registration number: 2012990000609

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20131212

Granted publication date: 20120314

Pledgee: Shenzhen SME credit financing guarantee Group Co., Ltd.

Pledgor: Shenzhen Skyee Optical Fiber Communication Technology Co., Ltd.

Registration number: 2012990000609

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Alarm apparatus for ONU device double-channel redundant power supply

Effective date of registration: 20131212

Granted publication date: 20120314

Pledgee: Shenzhen high tech investment and financing Company limited by guarantee

Pledgor: Shenzhen Skyee Optical Fiber Communication Technology Co., Ltd.

Registration number: 2013990000963

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
C56 Change in the name or address of the patentee

Owner name: SHENZHEN SKYEE OPTICAL FIBER COMMUNICATION TECHNOL

Free format text: FORMER NAME: SHENZHEN TIANYI FIBRE-OPTICAL COMMUNICATION TECHNOLOGY CO., LTD.

CP03 Change of name, title or address

Address after: Nanshan District Xueyuan Road in Shenzhen city of Guangdong province 518000 No. 1001 Nanshan Chi Park C3 building 16 floor

Patentee after: Sky, Shenzhen intelligence development net Science and Technology Ltd.

Address before: 518000 Guangdong city of Shenzhen province Nanshan District Xili Street Ma Hom Village Road No. 31 Yimin Industrial Zone Fifth 1-6

Patentee before: Shenzhen Skyee Optical Fiber Communication Technology Co., Ltd.

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20150128

Granted publication date: 20120314

Pledgee: Shenzhen high tech investment and financing Company limited by guarantee

Pledgor: Sky, Shenzhen intelligence development net Science and Technology Ltd.

Registration number: 2013990000963

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Alarm apparatus for ONU device double-channel redundant power supply

Effective date of registration: 20150129

Granted publication date: 20120314

Pledgee: Shenzhen high tech investment and financing Company limited by guarantee

Pledgor: Sky, Shenzhen intelligence development net Science and Technology Ltd.

Registration number: 2015990000081

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PM01 Change of the registration of the contract for pledge of patent right

Change date: 20150128

Registration number: 2013990000963

Pledgor after: Sky, Shenzhen intelligence development net Science and Technology Ltd.

Pledgor before: Shenzhen Skyee Optical Fiber Communication Technology Co., Ltd.

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20160318

Granted publication date: 20120314

Pledgee: Shenzhen high tech investment and financing Company limited by guarantee

Pledgor: Sky, Shenzhen intelligence development net Science and Technology Ltd.

Registration number: 2015990000081

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120314

Termination date: 20180722

CF01 Termination of patent right due to non-payment of annual fee