CN202159372U - Processing device suitable for management and control of asset life-cycle business of power system - Google Patents
Processing device suitable for management and control of asset life-cycle business of power system Download PDFInfo
- Publication number
- CN202159372U CN202159372U CN2011201910612U CN201120191061U CN202159372U CN 202159372 U CN202159372 U CN 202159372U CN 2011201910612 U CN2011201910612 U CN 2011201910612U CN 201120191061 U CN201120191061 U CN 201120191061U CN 202159372 U CN202159372 U CN 202159372U
- Authority
- CN
- China
- Prior art keywords
- module
- management
- control
- application server
- cycle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
The utility model relates to a processing device suitable for management and control of asset life-cycle businesses of a power system. The device includes client terminals, an application server, and a database server. The client terminal, the application server and the database server are in interconnection. The application server includes a scheming and planning module, a material purchasing module, a project building module, an operation and maintenance module, a retirement module, a target design and distribution module, a business data integration module, a target analyzing module and a business management and control module. Compared with the prior art, the processing device suitable for management and control of the asset life-cycle businesses of the power system has advantages of realizing the effective sharing and integration of node information of business processes, the transverse run-through of business departments and the like.
Description
Technical field
The utility model relates to the signal conditioning package of professional management and control of a kind of assets life-cycle, especially relates to a kind of treating apparatus that is applicable to the professional management and control of electric system assets life-cycle.
Background technology
Power grid enterprises belong to infrastructure service industry and PW, and power network safety operation involves the interests of the state and the people.Simultaneously power grid enterprises are typical capital-intensive enterprises, and electrical network assets value amount is huge.Guaranteeing power network safety operation, ensure power supply reliability, improve power grid operation efficient, is the top priority that power grid enterprises face.Along with the acceleration of power network development, the problem under the mode of asset data information management in the past progressively manifests, mainly show as following some:
1, the electrical network asset operation is implemented assets " segmentation " management mode based on function, and planning, construction, operation, retirement phase lack of uniform standard fail to form lean closed loop management mechanism.
Self there is the management method in some departments in each business department, can't be connected orderly between the business department.Whether each operation flow is carried out efficiently, and whether the flow process running is timely, do not form unified evaluation system.The assets life-cycle management is lacked data interchange, can't realize that information is in time corresponding between each module, operation flow can't realize the effective monitoring of overall process.
2, electrical network basic data management system imperfection; Lack the standardization accumulation and the analysis of basic data and management information; Each relevant information system is separate, and information is isolated, data deficiency unified standard standard; Data interaction, integrated, shared mechanism imperfection can't provide assessment basis and foundation for the asset management overall process.
3, fail to form comprehensive Asset State evaluation mechanism, do not have the information-based integrated framework of unified assets life-cycle cycle management, can't realize respectively managing hierarchical information and obtain visual requirement, can not the normality monitoring mechanism be provided for assets life-cycle cycle management.
The utility model content
The purpose of the utility model is exactly for the defective that overcomes above-mentioned prior art existence a kind of treating apparatus that is applicable to the professional management and control of electric system assets life-cycle to be provided.
The purpose of the utility model can realize through following technical scheme:
A kind of treating apparatus that is applicable to the professional management and control of electric system assets life-cycle is characterized in that, comprises client, application server, database server, interconnects between described client, application server, the database server.
Described application server comprises program plan module, purchase of goods and materials module, engineering construction module, O&M maintenance module, retired module, index Design and decomposing module, business datum integration module, indicator analysis module, the professional management and control module of scrapping; Described program plan module, purchase of goods and materials module, engineering construction module, O&M maintenance module, the retired module of scrapping are connected with the business datum integration module respectively; Described index Design is connected with indicator analysis module, professional management and control module respectively with decomposing module; Described business datum integration module is connected with indicator analysis module, professional management and control module respectively; Described indicator analysis module is connected with professional management and control module, and described professional management and control module is connected with program plan module, purchase of goods and materials module, engineering construction module, O&M maintenance module, the retired module of scrapping respectively.
Compared with prior art, the utlity model has following advantage:
(1) the utility model has been set up a cover and has been run through basic data standard and the information coding scheme of disposing overall process information management requirement from strategy, planning, design, investment, purchase of goods and materials, engineering construction, asset management, equipment control and waste and old material, has realized that each operation flow nodal information effectively shares the lateral direction penetrating of integrated and each business department.
(2) serve as theme with project, realization is approved and initiate a project, designs, purchases, builds until pinching of the full-range project nodal information of final acceptance of construction total, realizes each operation flow management and control.Serve as theme with assets (equipment), realize from assets put into operation change money, operation maintenance, overhaul of the equipments, state estimation, technological transformation, retired, scrap/utilize again, each key node monitoring has covered the overall process of assets life-cycle managements.
(3) under the support of each service node, launch the professional whole process management and control of assets life-cycle, realize respectively managing level managing visual demand, optimize assets life-cycle operation flow management and control means.
Description of drawings
Fig. 1 is the hardware configuration synoptic diagram of the utility model;
Fig. 2 is the structural representation of the application server of the utility model;
Fig. 3 is the workflow diagram of the utility model.
Embodiment
Below in conjunction with accompanying drawing and specific embodiment the utility model is elaborated.
Embodiment
Like Fig. 1, Fig. 2, shown in Figure 3, the workflow of the utility model is following:
1) nodal information that provided in routine duties of client a will be sent in the corresponding service stage module automatically; Nodal information in the separate service stage module sends to business datum integration module 7; Carry out association, and gather with engineering number of the account, asset number, device coding;
2) client a carries out the setting of index computing formula and information is sent to index Design and decomposing module 6 gathers;
3) indicator analysis module 8 is calculated the nodal information of from professional data integration module 7, sending according to parameter request after receiving the computing formula of from index Design and decomposing module 6, sending and decomposing index, and obtains desired value;
4) indicator analysis module 8 is carried out the analysis of various dimensions according to the desired value that is calculated, and has comprised branch unit statistics, by monthly, year statistics etc.;
5) the index analysis result sends to professional management and control module 9, this business is changed with the desired value variation set up incidence relation;
6) each service node information can directly send to professional management and control module, operation flow is accomplished untimely node carry out after-action review, also can remind the node of clear and definite time standard in the operation flow in advance.
The hardware configuration of the utility model comprises client a, application server b, database server c; Interconnect between described client a, application server b, the database server c, described application server b has comprised program plan module 1, purchase of goods and materials module 2, engineering construction module 3, O&M maintenance module 4, retired module 5, index Design and decomposing module 6, business datum integration module 7, indicator analysis module 8, the professional management and control module 9 of scrapping.Described program plan module 1, purchase of goods and materials module 2, engineering construction module 3, O&M maintenance module 4, the retired module 5 of scrapping are connected with business datum integration module 7 respectively; Described index Design is connected with indicator analysis module 7, professional management and control module 8 respectively with decomposing module 6; Described business datum integration module 7 is connected with indicator analysis module 8, professional management and control module 9 respectively; Described indicator analysis module 8 is connected with professional management and control module 9, and described professional management and control module 9 is connected with program plan module 1, purchase of goods and materials module 2, engineering construction module 3, O&M maintenance module 4, the retired module 5 of scrapping respectively.
Claims (2)
1. a treating apparatus that is applicable to the professional management and control of electric system assets life-cycle is characterized in that, comprises client, application server, database server, interconnects between described client, application server, the database server.
2. the treating apparatus that is applicable to the professional management and control of electric system assets life-cycle according to claim 2; It is characterized in that; Described application server comprises program plan module, purchase of goods and materials module, engineering construction module, O&M maintenance module, retired module, index Design and decomposing module, business datum integration module, indicator analysis module, the professional management and control module of scrapping; Described program plan module, purchase of goods and materials module, engineering construction module, O&M maintenance module, the retired module of scrapping are connected with the business datum integration module respectively; Described index Design is connected with indicator analysis module, professional management and control module respectively with decomposing module; Described business datum integration module is connected with indicator analysis module, professional management and control module respectively; Described indicator analysis module is connected with professional management and control module, and described professional management and control module is connected with program plan module, purchase of goods and materials module, engineering construction module, O&M maintenance module, the retired module of scrapping respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201910612U CN202159372U (en) | 2011-06-08 | 2011-06-08 | Processing device suitable for management and control of asset life-cycle business of power system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201910612U CN202159372U (en) | 2011-06-08 | 2011-06-08 | Processing device suitable for management and control of asset life-cycle business of power system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202159372U true CN202159372U (en) | 2012-03-07 |
Family
ID=45767000
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201910612U Expired - Lifetime CN202159372U (en) | 2011-06-08 | 2011-06-08 | Processing device suitable for management and control of asset life-cycle business of power system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202159372U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102629342A (en) * | 2012-04-25 | 2012-08-08 | 上海市电力公司 | Asset wall-based asset management forecast information processing method suitable for power system |
CN110930111A (en) * | 2019-11-13 | 2020-03-27 | 国网天津市电力公司 | APP (application) for unified management of physical assets and mobile operation |
CN111291955A (en) * | 2018-12-07 | 2020-06-16 | 国网浙江省电力有限公司 | Distribution network asset overall process management evaluation method and system |
CN112669005A (en) * | 2020-12-25 | 2021-04-16 | 中铁大桥局集团有限公司 | Intelligent cooperative management system and method suitable for engineering project life cycle |
-
2011
- 2011-06-08 CN CN2011201910612U patent/CN202159372U/en not_active Expired - Lifetime
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102629342A (en) * | 2012-04-25 | 2012-08-08 | 上海市电力公司 | Asset wall-based asset management forecast information processing method suitable for power system |
CN102629342B (en) * | 2012-04-25 | 2015-03-18 | 上海市电力公司 | Asset wall-based asset management forecast information processing method suitable for power system |
CN111291955A (en) * | 2018-12-07 | 2020-06-16 | 国网浙江省电力有限公司 | Distribution network asset overall process management evaluation method and system |
CN110930111A (en) * | 2019-11-13 | 2020-03-27 | 国网天津市电力公司 | APP (application) for unified management of physical assets and mobile operation |
CN112669005A (en) * | 2020-12-25 | 2021-04-16 | 中铁大桥局集团有限公司 | Intelligent cooperative management system and method suitable for engineering project life cycle |
CN112669005B (en) * | 2020-12-25 | 2024-03-05 | 中铁大桥局集团有限公司 | Intelligent collaborative management system and method applicable to engineering project whole life cycle |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108009758B (en) | BIM-based intelligent management method for field construction materials | |
US10116165B2 (en) | Powergrid operation and supervision system | |
CN111210108B (en) | Performance management and control model of electric power material supply chain | |
US9208529B2 (en) | Smoothing power output from a wind farm | |
WO2012055295A1 (en) | Battery charge/swap monitoring system and method based on internet of things | |
WO2023045654A1 (en) | Blockchain-based green power authentication method, apparatus and system | |
CN110570083A (en) | inter-area spot market technical support system | |
CN106952032A (en) | A kind of equipment manufacture big data management system | |
CN103093320A (en) | Management method of equipment in metro operation network | |
CN107123982A (en) | A kind of distribution network reliability analysis method of economic benefit based on equipment alteration | |
CN202159372U (en) | Processing device suitable for management and control of asset life-cycle business of power system | |
US20200117151A1 (en) | Outage and switch management for a power grid system | |
CN109102426A (en) | A kind of wisdom energy management method and system | |
O’Driscoll et al. | The development of energy performance indicators within a complex manufacturing facility | |
CN112465349A (en) | Marketing line loss calculation and evaluation system based on one district and one index | |
CN202795451U (en) | Asset entire life-cycle management process control application system based on topic base | |
CN112418548B (en) | Intelligent workshop management method and system based on artificial intelligence technology | |
CN201654838U (en) | Asset life-cycle information integrated control device applicable to electric power systems | |
CN102663566A (en) | Asset management decision analysis information processing method suitable for power system | |
KR100584903B1 (en) | System for real time controlling driving data of power plant | |
CN206147719U (en) | Commodity circulation scheduling control system based on big data | |
CN107194529B (en) | Power distribution network reliability economic benefit analysis method and device based on mining technology | |
CN114706732A (en) | Method and device for monitoring operation data of photovoltaic power station | |
Maadani et al. | Analysis of demand-side business opportunities in Iran, as a digital transformation perspective | |
CN202795445U (en) | Asset managing decision and analysis information processing device suitable for power system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20120307 |
|
CX01 | Expiry of patent term |