CN202152535U - Foot line - Google Patents

Foot line Download PDF

Info

Publication number
CN202152535U
CN202152535U CN2011201601021U CN201120160102U CN202152535U CN 202152535 U CN202152535 U CN 202152535U CN 2011201601021 U CN2011201601021 U CN 2011201601021U CN 201120160102 U CN201120160102 U CN 201120160102U CN 202152535 U CN202152535 U CN 202152535U
Authority
CN
China
Prior art keywords
support
payment
panel
porter
clamping part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201601021U
Other languages
Chinese (zh)
Inventor
肖文求
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN XINMEIGE NEW DECORATION MATERIALS CO Ltd
Original Assignee
HUNAN XINMEIGE NEW DECORATION MATERIALS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN XINMEIGE NEW DECORATION MATERIALS CO Ltd filed Critical HUNAN XINMEIGE NEW DECORATION MATERIALS CO Ltd
Priority to CN2011201601021U priority Critical patent/CN202152535U/en
Application granted granted Critical
Publication of CN202152535U publication Critical patent/CN202152535U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model provides a foot line, which is characterized by comprising a plurality of hanging boards (1), a bracket (3) and a panel (5), wherein the hanging boards (1) are fixed on a to-be-mounted wall at intervals; the inner side of the bracket is mounted on the outer sides of the hanging boards (1), and a panel mounting groove is formed on the outer side; and the panel (5) is mounted in the panel mounting groove. According to the utility model, the bracket is independently arranged to fix the panel, so that the technical problems in the prior art that the materials are wasted when the panel is replaced and the operation is complicated are solved, the materials are saved, and the operation is simple and convenient.

Description

The ground payment to a porter
Technical field
The utility model relates to the architectural decoration field, is specifically related to the payment to a porter of a kind of ground.
Background technology
The ground payment to a porter has another name called skirting; Be a kind of people widely used constructional materialss when house fitting-up; Ground payment to a porter is in the market used materials such as pottery, solid wood, alloy, engineering plastics always and is processed; Its mounting method is looked material difference and is had nothing in common with each other, and with regard to the ground payment to a porter of solid wood, alloy, engineering plastics material, existing mounting method majority is that payment to a porter base plate in ground is installed on metope earlier; And then before the panel of suitable length is directly installed on ground payment to a porter base plate, cover in ground payment to a porter base plate and metope fully with it.
This panel is directly installed on the payment to a porter integrally before the ground payment to a porter base plate, the panel of local payment to a porter is aging when damaged, must whole front panel all be changed, and has so both wasted material, and the operation of replacing is unusual complicacy also.
The utility model content
The utility model aims to provide the payment to a porter of a kind of ground, to solve existing ground payment to a porter waste material when changing panel, the technical problem of complicated operation.
For realizing above-mentioned purpose, the utility model provides the payment to a porter of a kind of ground.This ground payment to a porter comprises: a plurality of link plates, and fixed interval is on wall to be installed; Support, installed inside are on the outside of a plurality of link plates, and the outside has the panel mounting groove; And panel, be installed in the panel mounting groove.
Further, the outside of link plate has clamping part, and the inboard of support and the corresponding position of link plate are provided with the Plug Division of matching with clamping part with mutual clamping.
Further, clamping part comprises: first clamping part is arranged on the outer upper of link plate; Second clamping part is arranged on the outer lower portion of link plate; The Plug Division comprises: first Plug Division is arranged on the inboard on the top of support, with the clamping mutually of first clamping part; Second Plug Division is arranged on the inboard of the bottom of support, with the clamping mutually of second clamping part.
Further, first clamping part is the plate-shaped springs wing along the outside upper limb longitudinal extension of link plate, and second clamping part is the plate-shaped springs hook along the outside, the bottom lower edge longitudinal extension of link plate; First Plug Division is first plate-shaped springs hook that is arranged on the upper inner of support, and second Plug Division is second plate-shaped springs hook that is arranged on the bottom inside of support.
Further, the upper inner of support and bottom have embedding groove respectively, are separately installed with in the embedding groove of upper and lower and suppress part, and two heads that suppress part prop up wall to be installed and floor respectively.
Further, suppress part and comprise: inlay is embedded in the embedding groove; Suppress head, in a tubular form and have elastic tube wall, elastic tube wall props up wall to be installed or floor.
Further, the embedding groove on top is positioned at the upper inner of support, and opens wide towards wall to be installed; The embedding groove of bottom is positioned at the bottom of support, and opens wide towards the floor.
Further, embedding groove is by the wedge structure that expands in the opening.
Further, the outer middle side part of link plate has the inboard support portion of supporting bracket.
Further, panel is fixed in the panel mounting groove on the support through the rifle nail, perhaps sticks with glue in the panel mounting groove of knot on support, and the rifle nail is squeezed in the panel from the inboard of support.
According to the technical scheme of the utility model, owing to separately support is set and fixes panel, thus waste material when having overcome of the prior art ground payment to a porter replacing panel, the technical problem of complicated operation has reached the saving material, effect easy and simple to handle.In addition, a plurality of link plate fixed interval are used for mounting bracket on wall to be installed, not only firmly but also saved material.
Description of drawings
The accompanying drawing that constitutes the application's a part is used to provide the further understanding to the utility model, and illustrative examples of the utility model and explanation thereof are used to explain the utility model, do not constitute the improper qualification to the utility model.In the accompanying drawings:
Fig. 1 is the backsight structural representation according to the ground payment to a porter of the utility model;
Fig. 2 is the sectional structure sketch map according to the ground payment to a porter of the utility model; And
Fig. 3 is the structural representation that suppresses part according to the ground payment to a porter of the utility model.
The specific embodiment
Embodiment to the utility model is elaborated below in conjunction with accompanying drawing, but the multitude of different ways that the utility model can be defined by the claims and cover is implemented.
Shown in Figure 1 is a kind of preferred implementation of the ground payment to a porter of the utility model, and as can beappreciated from fig. 1, this ground payment to a porter comprises: a plurality of link plates 1, and fixed interval is on wall to be installed; Support 3, installed inside are on the outside of a plurality of link plates 1, and the outside has the panel mounting groove; And panel 5, be installed in the panel mounting groove.Owing to separately support is set and fixes panel, realized the quick replacing of panel, save the replacing time, operate also more easyly, simultaneously, need change panel, reduce replacement cost and saved material.In addition, a plurality of link plate fixed interval are used for mounting bracket on wall to be installed, not only firmly but also saved material.Preferably, the material of panel adopts solid wood, because former panel promptly is equal to the support (not having other annex) of the utility model; Being fixed on the base plate, is to process with metal material, because the shaping limitation of metal material; The metalloid goods are aluminium mostly, and its wall is thin, and intensity is not high; Broken easily, and the thickness of solid-wood panels is big more than aluminium, the power that passes to after being collided on the support that carries it is evenly distributed; Thereby make external force play good Sui Chong effect, effectively protected the ground payment to a porter the destruction of support.
As a kind of preferred implementation, the outside of link plate 1 has clamping part 11, and the relevant position of the inboard of support 3 is provided with the Plug Division 31 of matching with clamping part 11 with mutual clamping.Preferably, clamping part 11 comprises: first clamping part 111 is arranged on the outer upper of link plate 1; Second clamping part 112 is arranged on the exterior bottom of link plate 1; Plug Division 31 comprises: first Plug Division 311 is arranged on the upper inner of support 3, with first clamping part 11 clamping mutually; Second Plug Division 312 is arranged on the bottom outside of support 3, with second clamping part 112 clamping mutually.In the installation process, earlier link plate 1 usefulness steel nail is fixed on the wall to be installed, the support 3 that panel 5 will be installed then is connected on the link plate 1, and this mounting means convenient disassembly is convenient to change, and fastness is good.
It can also be seen that by Fig. 1 first clamping part 111 is the plate-shaped springs wing along the outside upper limb longitudinal extension of link plate 1, second clamping part 112 is to link up with along the plate-shaped springs of outer rim longitudinal extension along the outside, bottom of link plate 1; First Plug Division 311 is first plate-shaped springs hook of the upper inner that is arranged on support 3, and second Plug Division 312 is second plate-shaped springs hook of the inboard of the bottom that is arranged on support 3.After the Plug Division is connected to corresponding clamping part, under the acting in conjunction of the elastic force of Plug Division and clamping part, make card hang very firmly, be not easy to come off, dismounting simultaneously is very convenience also.
Fig. 2 is the sectional structure sketch map according to the ground payment to a porter of the utility model; Fig. 3 is the structural representation that suppresses part according to the ground payment to a porter of the utility model.As preferred embodiment a kind of, as shown in Figure 2, the top of support 3 and bottom have embedding groove respectively, are separately installed with the wall and the floor of suppressing after head that 7, two of parts suppress part 7 props up installation respectively in the embedding groove of top and bottom.Preferably, as shown in Figure 3, suppress part 7 and comprise: inlay 71 is embedded in the embedding groove; Preferably, embedding groove is the wedge structure that expands in the opening.Can block the inlay 71 that is embedded in the groove securely.Suppress 72, in a tubular form and have elastic tube wall, elastic tube wall props up wall to be installed or floor.When the ground payment to a porter is installed; Not high ground payment to a porter that causes of planeness and the not tight problem of its applying owing to wall and floor; Elastic tube wall distortion by suppressing 72 has obtained compensation; Thereby accomplished careful the fitting together of ground payment to a porter and wall and floor, so just greatly reduced requirement, made things convenient for installation wall and floor flatness.
Preferably, the embedding groove on top is positioned at the top of support 3 inboards, and opens wide towards wall to be installed; The embedding groove of bottom is positioned at the bottom of support 3, and opens wide towards the floor.Such structure helps two suppresses part 7 and after installation, can prop up wall to be installed and floor respectively, to realize ground payment to a porter and the careful applying of wall and floor.
It can also be seen that by Fig. 1 the outer middle side part of link plate 1 has the support portion 13 of supporting bracket 3 inboards.Because support 3 has only inboard top and the bottom to be fixed on the link plate 1 through the Plug Division, the middle part lacks support, the damage that is collided easily, and the support portion 13 at middle part can effectively solve this type of problem.
Preferably, panel 5 is fixed in the panel mounting groove on the support through the rifle nail, perhaps sticks with glue in the panel mounting groove of knot on support, and the rifle nail is squeezed in the panel 5 from the inboard of support 3.When the ground payment to a porter is installed; Follow closely groove and pass support 3 from the rifle of support 3 through the rifle nail earlier and hammer into panel 5; Thereby fixed panel 5 perhaps is bonded in panel 5 in the mounting groove on the support with glue, can firmly fix panel 5 like this; Change simultaneously also very convenience, and then support 3 cards that will enclose panel 5 hang on the link plate 1.
The preferred embodiment that the above is merely the utility model is not limited to the utility model, and for a person skilled in the art, the utility model can have various changes and variation.All within the spirit and principle of the utility model, any modification of being done, be equal to replacement, improvement etc., all should be included within the protection domain of the utility model.

Claims (10)

1. a ground payment to a porter is characterized in that, comprising:
A plurality of link plates (1), fixed interval is on wall to be installed;
Support (3), installed inside is on the outside of said a plurality of link plates (1), and the outside has the panel mounting groove; And
Panel (5) is installed in the said panel mounting groove.
2. payment to a porter according to claim 1ly; It is characterized in that; The outside of said link plate (1) has clamping part (11), and the inboard of said support (3) and the corresponding position of said link plate (1) are provided with the Plug Division (31) of matching with said clamping part (11) with mutual clamping.
3. payment to a porter according to claim 2ly is characterized in that,
Said clamping part (11) comprising:
First clamping part (111) is arranged on the outer upper of said link plate (1);
Second clamping part (112) is arranged on the outer lower portion of said link plate (1);
Said Plug Division (31) comprising:
First Plug Division (311) is arranged on the inboard on the top of said support (3), with said first clamping part (111) clamping mutually;
Second Plug Division (312) is arranged on the inboard of the bottom of said support (3), with said second clamping part (112) clamping mutually.
4. payment to a porter according to claim 3ly; It is characterized in that; Said first clamping part (111) is the plate-shaped springs wing along the outside upper limb longitudinal extension of said link plate (1), and second clamping part (112) is the plate-shaped springs hook along the outside, the bottom lower edge longitudinal extension of said link plate (1); Said first Plug Division (311) is first plate-shaped springs hook that is arranged on the upper inner of said support (3), and said second Plug Division (312) is second plate-shaped springs hook that is arranged on the bottom inside of said support (3).
5. payment to a porter according to claim 1ly; It is characterized in that; The upper inner and the bottom of said support (3) have embedding groove respectively, are separately installed with in the embedding groove of said upper and lower to suppress part (7), and two said heads that suppress part (7) prop up said wall to be installed and floor respectively.
6. payment to a porter according to claim 5ly is characterized in that, the said part (7) that suppresses comprising:
Inlay (71) is embedded in the said embedding groove;
Suppress head (72), in a tubular form and have elastic tube wall, said elastic tube wall props up said wall to be installed or floor.
7. payment to a porter according to claim 5ly is characterized in that, the embedding groove on said top is positioned at the upper inner of said support (3), and opens wide towards said wall to be installed; The embedding groove of said bottom is positioned at the bottom of said support (3), and opens wide towards said floor.
8. payment to a porter according to claim 5ly is characterized in that, said embedding groove is by the wedge structure that expands in the opening.
9. payment to a porter according to claim 1ly is characterized in that, the outer middle side part of said link plate (1) has the support portion (13) of supporting said support (3) inboard.
10. payment to a porter according to claim 1ly is characterized in that, said panel (5) is fixed in the said panel mounting groove through the rifle nail, perhaps sticks with glue knot in said panel mounting groove, and said rifle nail is squeezed in the said panel (5) from the inboard of said support (3).
CN2011201601021U 2011-05-18 2011-05-18 Foot line Expired - Fee Related CN202152535U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201601021U CN202152535U (en) 2011-05-18 2011-05-18 Foot line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201601021U CN202152535U (en) 2011-05-18 2011-05-18 Foot line

Publications (1)

Publication Number Publication Date
CN202152535U true CN202152535U (en) 2012-02-29

Family

ID=45693035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201601021U Expired - Fee Related CN202152535U (en) 2011-05-18 2011-05-18 Foot line

Country Status (1)

Country Link
CN (1) CN202152535U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103452298A (en) * 2013-09-16 2013-12-18 刘天盛 Skirting

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103452298A (en) * 2013-09-16 2013-12-18 刘天盛 Skirting
CN103452298B (en) * 2013-09-16 2016-10-05 刘天盛 Baseboard

Similar Documents

Publication Publication Date Title
CN205276590U (en) Insulating glass curtain wall is concealed to horizontal bright vertical stroke of thin steel
CN106284779A (en) A kind of bright hidden frame of curtain wall connects auxiliary frame, curtain wall system and construction method thereof
CN203961172U (en) Folded-edge dry-hang stone
CN103290962B (en) A kind of building curtain wall stone material dry suspending structure
CN104929297A (en) Combined type ceiling hanging part and wood veneer ceiling installing process
CN204940621U (en) Half hidden curtain wall system device
CN105019586A (en) Semi-hidden frame curtain wall system device
CN208830546U (en) A kind of Novel stone curtain-wall cladding system
CN203284924U (en) Building curtain wall stone dry hanging structure
CN202152535U (en) Foot line
CN202299262U (en) Installation mechanism for stone compound board
CN203320772U (en) Stone dry-hanging system
CN205134649U (en) Bright frame mechanism of half hidden frame curtain wall system device
CN203560842U (en) Lighting device mounting structure adaptive to building curtain wall
CN204940620U (en) The Yin Kuang mechanism of half hidden curtain wall system device
CN102505823A (en) Honeycomb stone composite plate with connection element
CN205153464U (en) Connection structure between floor
CN204691221U (en) Aluminium-plastic composite structure hollow construction formwork
CN204715738U (en) A kind of corner for building template
CN204040859U (en) The bright frame shutter of a kind of junior unit
CN202299261U (en) Cellular stone composite plate provided with hanging piece
CN208023873U (en) A kind of honeycomb stone plate with pendant
CN209779939U (en) Interior wall with environmental protection and decorative layer
CN204001575U (en) Aluminum honeycomb panel mounting structure
CN203257024U (en) Aluminum panel strut structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120229

Termination date: 20140518