CN202151986U - Large vertical sculpture - Google Patents
Large vertical sculpture Download PDFInfo
- Publication number
- CN202151986U CN202151986U CN201120216407XU CN201120216407U CN202151986U CN 202151986 U CN202151986 U CN 202151986U CN 201120216407X U CN201120216407X U CN 201120216407XU CN 201120216407 U CN201120216407 U CN 201120216407U CN 202151986 U CN202151986 U CN 202151986U
- Authority
- CN
- China
- Prior art keywords
- stone
- sculpture
- core
- plastomer
- inner support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Processing Of Stones Or Stones Resemblance Materials (AREA)
Abstract
The utility model relates to craft ornaments, and provides a large vertical sculpture, which is reasonable and firm in structure and comprises an inner supporting core and a sculpture body wrapping the inner supporting core in an inlaid manner. The inner supporting core is formed by stacking stones crosswise layer by layer, and gaps among the stones are tamped by adhesive filling materials layer by layer.
Description
Technical field
The utility model relates to the Handicraft decorative thing, particularly a kind of large-scale setting sculpture.
Background technology
At present; Large-scale setting sculpture generally wraps in the outer plastomer of inner support core by inner support core and edge and forms; The general design of said inner support core is formed by steel bar concrete water; Said plastomer is generally the stone engraving and forms, and its construction technology is: at first inner armored concrete is supported core pouring construction molding, and then after hanging on the preburied component that is welded on the inner support core through setscrew or metal suspension member edge outside stone plastomer; Use concrete (tabia) to fill the spaced slot that various materials combine at last, be integral four kinds of materials with different properties adhesions as the bonding packing material.
Its outside stone plastomer of the large-scale setting sculpture of this structure is hung through setscrew or metal suspension member edge and is welded on the preburied component of inner support core; Setscrew is after the influence that receives the weather temperature difference; The stone plastomer that setscrew periphery occurs through the regular meeting loosening phenomenon of bursting apart, and the large-scale setting sculpture of prior art its to support core be to be formed by steel bar concrete water, longest-lived also has only decades; The stone plastomer life-span of outside then can reach thousand; Both become a body life time and differ greatly too greatly, cause sculpture inner support core and outside stone plastomer not to coexist for a long time, and structure is reasonable inadequately.
The utility model content
To the problems referred to above, the utility model propose a kind of inside and outside rational in infrastructure, firm, the large-scale setting sculpture of long service life.
For solving this technical problem; The utility model is taked following scheme: a kind of large-scale setting sculpture; Comprise that inner support core and edge wrap in the outer plastomer of inner support core; Said inner support core by stone intersect each other folded of heap of stone, successively install and form, the spaced slot between said stone and the stone adopts the bonding packing material successively to tamp filling.
Further: said plastomer wraps in the support type core outer surface through green stone tenon edge and forms an integral body with supporting core, and fill through the bonding packing material in said plastomer and the gap of supporting between the core.
Through adopting the aforementioned techniques scheme; The beneficial effect of the utility model is: this novel large is erect sculpture and the reinforced concrete structure of inside is all changed into successively constructing with stone folded of heap of stone the forming of inside and outside intersection is installed; Spaced slot between stone and the stone adopts the bonding packing material successively to tamp filling again; Outside plastomer all uses the green stone tenon to be fixedly connected to form an integral body with every inner in stone; Can make inside and outside of sculpture overall structure reach the life-span in thousand simultaneously, rational in infrastructure, firm, prolonged service life of sculpture greatly.
Description of drawings
Fig. 1 is the utility model embodiment partial sectional perspective view;
Fig. 2 is the utility model embodiment sectional drawing.
The specific embodiment
Combine accompanying drawing and specific embodiment that the utility model is further specified at present.
With reference to figure 1, Fig. 2; Present embodiment discloses a kind of large-scale setting sculpture; Comprise that inner support core 2 and edge wrap in the outer stone plastomer 1 of inner support core; Said inner support core 2 by stone 21 intersect each other folded of heap of stone, successively install and form; Spaced slot between stone and the stone is filled with bonding packing material 3, and the formula rate of said bonding packing material is: like 1000 kilograms of special materials: wherein 650 kilograms in laterite, 150 kilograms of shell limes, coarse sand 120 kg, boil 40 kilograms in glutinous rice, 20 kilograms in brown sugar, 20 kilograms in clear water.This novel product has increased coarse sand in original laterite and shell-lime can play the effect of resisting the famineization loss; Mix and joined glutinous rice and glue into an integral body inside and outside can making structure; Make the structure pliability and thousand constant; And prescription to have added brown sugar mainly be to make water-fast anti-the soaking of special material, the beneficial effect of perpetuity in thousand of anti-famineization.Said stone plastomer 1 wraps in through green stone tenon 4 edges and supports core 2 outer surfaces, and passes through bonding packing material 3 and support core 2 to form an integral body.
This novel large is erect sculpture and the reinforced concrete structure of inside is all changed into successively constructing with stone folded of heap of stone the forming of inside and outside intersection is installed; Spaced slot between stone and the stone adopts the bonding packing material successively to tamp filling again; Outside plastomer all uses the green stone tenon to be fixedly connected to form an integral body with every inner in stone; Can make inside and outside of sculpture overall structure reach the life-span in thousand simultaneously, rational in infrastructure, firm, prolonged service life of sculpture greatly.
The above record is merely the embodiment that utilizes this origination techniques content, anyly is familiar with modification, the variation that this creation of this art utilization is done, and all belongs to the claim of this creation opinion, and is not limited to embodiment announcement person.
Claims (2)
1. one kind large-scale setting sculpture; Comprise that inner support core and edge wrap in the outer plastomer of inner support core; It is characterized in that: said inner support core by stone intersect each other folded of heap of stone, successively install and form, the spaced slot between said stone and the stone adopts the bonding packing material successively to tamp filling.
2. large-scale setting sculpture according to claim 1 is characterized in that: said plastomer wraps in the support type core outer surface through green stone tenon edge and forms an integral body with supporting core, and fill through the bonding packing material in said plastomer and the gap of supporting between the core.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120216407XU CN202151986U (en) | 2011-06-16 | 2011-06-16 | Large vertical sculpture |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120216407XU CN202151986U (en) | 2011-06-16 | 2011-06-16 | Large vertical sculpture |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202151986U true CN202151986U (en) | 2012-02-29 |
Family
ID=45692492
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201120216407XU Expired - Fee Related CN202151986U (en) | 2011-06-16 | 2011-06-16 | Large vertical sculpture |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202151986U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104015535A (en) * | 2014-06-12 | 2014-09-03 | 山西宾利文化艺术有限公司 | Method for duplicating and enlarging sculpture |
CN105150384A (en) * | 2015-08-07 | 2015-12-16 | 金华市源创玉业有限公司 | Jade furniture of joggle joint structure and manufacturing method for jade furniture |
-
2011
- 2011-06-16 CN CN201120216407XU patent/CN202151986U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104015535A (en) * | 2014-06-12 | 2014-09-03 | 山西宾利文化艺术有限公司 | Method for duplicating and enlarging sculpture |
CN105150384A (en) * | 2015-08-07 | 2015-12-16 | 金华市源创玉业有限公司 | Jade furniture of joggle joint structure and manufacturing method for jade furniture |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102628761A (en) | Artificial long core and preparation method thereof | |
CN103341589A (en) | Sand mixing process for molding clay green sand | |
CN102366812A (en) | Preparation method for sodium silicate sand used for casting | |
CN202151986U (en) | Large vertical sculpture | |
CN201685312U (en) | Artificial synthesized stone banding combining forming device | |
CN102303472A (en) | Large standing sculpture | |
CN207014569U (en) | A kind of Water Cutting device of stone material | |
CN104260589B (en) | The reinforcement welding of landscape sculpture pours forming technique method with cement | |
CN105035537A (en) | Foam packing case for full-automatic mahjong machine | |
CN107263734A (en) | A kind of Water Cutting device of stone material | |
CN204979743U (en) | Foam packing box of full -automatic mahjong machine | |
CN101704067A (en) | Method for solving defect on preparing dry type cylinder body water channel by using lost mould technology | |
CN104264668B (en) | Stake mould of X-shaped Model Pile and preparation method thereof | |
CN203160276U (en) | Plastic composite manhole cover support | |
CN202781401U (en) | Mould for electric smelting alumina brick | |
CN202291272U (en) | Impeller casting mud core | |
CN205935372U (en) | Straight board cavity of wall body module | |
WO2006096860A3 (en) | Composition and method of using the same to make a simulated rock climbing wall | |
CN202180512U (en) | Special-shaped brick sand mold | |
CN104553071A (en) | Forming method and cup body structure of paper cup | |
CN103711291B (en) | High brightness high-strength environment-friendly material-saving marble line and preparation method | |
CN202610675U (en) | Composite stone slab | |
CN201908314U (en) | Novel composite reinforced green slope-protecting block | |
CN207110311U (en) | A kind of artificial stone containing jade composition | |
CN205969629U (en) | Mould of production polyurethane moulding |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120229 Termination date: 20130616 |