CN202131553U - Ground hardening assembly of transformer substation - Google Patents

Ground hardening assembly of transformer substation Download PDF

Info

Publication number
CN202131553U
CN202131553U CN201120191277U CN201120191277U CN202131553U CN 202131553 U CN202131553 U CN 202131553U CN 201120191277 U CN201120191277 U CN 201120191277U CN 201120191277 U CN201120191277 U CN 201120191277U CN 202131553 U CN202131553 U CN 202131553U
Authority
CN
China
Prior art keywords
brick
ground hardening
square
assembly
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120191277U
Other languages
Chinese (zh)
Inventor
孟越峰
张国喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201120191277U priority Critical patent/CN202131553U/en
Application granted granted Critical
Publication of CN202131553U publication Critical patent/CN202131553U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

The utility model discloses a ground hardening assembly of a transformer substation, which comprises a square brick and a special shaped brick. The square brick and the spherical shaped brick are matched with each other in use. An arc edge and a notch are arranged on the special shaped brick. The length and the width of the notch are identical to the length and the width of the square brick. Due to the fact that the ground hardening assembly adopts a prefabricate piece, and the ground hardening assembly can be produced and constructed at different places and can be constructed according to the unified standard during ground hardening, thereby being capable of effectively shortening construction periods.

Description

Transformer station's hardened ground assembly
Technical field
The utility model relates to a kind of constructional materials, specifically, relates to a kind of transformer station hardened ground assembly.
Background technology
During building operations, the common means of hardened ground are to adopt hardening of concrete, so just receive the restriction of execution conditions.And because the various places geological conditions is different, this just causes and can not make construction costs improve according to the unified standard construction, and construction period prolongs.
The utility model content
The technical problem that the utility model solved provides a kind of transformer station hardened ground assembly, can shorten construction period, and realizes according to the unified standard construction.
Technical scheme is following:
A kind of transformer station hardened ground assembly comprises the square brick and the special form brick of working in coordination and using, and said special form brick is provided with arc limit and breach, and the length of said breach is identical with width with the length of width and said square brick.
Further: said square brick and special form brick inside are embedded with reinforcing rib.
The utility model is owing to adopt prefabricated component, can be implemented in different places and produces and construct, and can realize during hardened ground according to the unified standard construction, so can effectively shorten construction period.
Description of drawings
Fig. 1 is the elevation of square brick in the utility model transformer station hardened ground assembly;
Fig. 2 is the sectional view of square brick in the utility model transformer station hardened ground assembly;
Fig. 3 is the elevation of special form brick in the utility model transformer station hardened ground assembly;
Fig. 4 is the sketch map after square brick and the special form brick assembly unit in the utility model.
The specific embodiment
Below with reference to exemplary preferred embodiments and reference drawings, the technical scheme of the utility model is done detailed description.
As shown in Figure 1, be the elevation of square brick in the utility model transformer station hardened ground assembly.Transformer station's hardened ground assembly comprises square brick 11 and special form brick 12, and square brick 11 is used with special form brick 12, can be assembled into different shape, to adapt to varying environment ground.
As shown in Figure 2, be the sectional view of square brick in the utility model transformer station hardened ground assembly, in order to increase the compressive strength of square brick 11, in square brick 11, be embedded with reinforcing rib 13.In the utility model, in special form brick 12, also be embedded with reinforcing rib 13.
As shown in Figure 3, be the elevation of special form brick in the utility model transformer station hardened ground assembly, as shown in Figure 4, be the sketch map after square brick 11 and special form brick 12 assembly units in the utility model.Special form brick 12 has breach and arc limit, and the size of breach is identical with square brick 11, and the effect of breach is to cooperate with square brick 11, adapts to the Different Ground shape, and is engaged through square brick 11 and special form brick 12, can strengthen the bulk strength on ground.Special form brick 12 has been emitted on turning and turning usually, and the arc limit can be used as corner.

Claims (2)

1. transformer station's hardened ground assembly is characterized in that: comprise the square brick and the special form brick of working in coordination and using, said special form brick is provided with arc limit and breach, and the length of said breach is identical with width with the length of width and said square brick.
2. transformer station as claimed in claim 1 hardened ground assembly is characterized in that: said square brick and special form brick inside are embedded with reinforcing rib.
CN201120191277U 2011-06-08 2011-06-08 Ground hardening assembly of transformer substation Expired - Fee Related CN202131553U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120191277U CN202131553U (en) 2011-06-08 2011-06-08 Ground hardening assembly of transformer substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120191277U CN202131553U (en) 2011-06-08 2011-06-08 Ground hardening assembly of transformer substation

Publications (1)

Publication Number Publication Date
CN202131553U true CN202131553U (en) 2012-02-01

Family

ID=45520326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120191277U Expired - Fee Related CN202131553U (en) 2011-06-08 2011-06-08 Ground hardening assembly of transformer substation

Country Status (1)

Country Link
CN (1) CN202131553U (en)

Similar Documents

Publication Publication Date Title
CN202131553U (en) Ground hardening assembly of transformer substation
CN204738440U (en) Environmental protection insulation block
Sui et al. Emergy analysis of Guangzhou and Shanghai urban ecosystem
CN204850520U (en) Loam wall body reinforced structure
CN202012185U (en) Face brick embedding slit control tool
CN201874137U (en) Earthquake-proof brick with mortise and tenon joint
CN205171753U (en) Steel construction unit -installment wall body and door frame wall body node thereof
CN204876193U (en) Precast reinforced concrete shear force wall wallboard
CN203514338U (en) Tower crane foundation
CN204001946U (en) A kind of " 8 " font chimney structure
CN203742055U (en) Energy-saving mould brick
CN202139597U (en) High-greening interlocking slope-protection block
CN203393900U (en) Light foam concrete hanging beam
CN204551878U (en) A kind of self-insulating light partition wall batten
CN203022358U (en) Round trowel
CN202370537U (en) Electric power tunnel
CN202831331U (en) Floor system of novel building materials
CN202416293U (en) Cement square pile
CN2679244Y (en) Spraying powder composite pile
CN203049532U (en) Fixing device of nature-simulating wetland
CN204418224U (en) Regeneration concrete cover plate
CN202280276U (en) Ground foot mechanism for spherical mixing tank
CN202787073U (en) Flat anchorage device connector
CN204174998U (en) Novel base station base
CN204569693U (en) Regeneration concrete septic tank

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Nikon smart grid equipment (Beijing) Co., Ltd.

Assignor: Meng Yuefeng

Contract record no.: 2014990000964

Denomination of utility model: Ground hardening assembly of transformer substation

Granted publication date: 20120201

License type: Exclusive License

Record date: 20141224

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120201

Termination date: 20180608

CF01 Termination of patent right due to non-payment of annual fee