CN202125077U - Template supporting sleeve for pouring shear wall - Google Patents

Template supporting sleeve for pouring shear wall Download PDF

Info

Publication number
CN202125077U
CN202125077U CN2011201943300U CN201120194330U CN202125077U CN 202125077 U CN202125077 U CN 202125077U CN 2011201943300 U CN2011201943300 U CN 2011201943300U CN 201120194330 U CN201120194330 U CN 201120194330U CN 202125077 U CN202125077 U CN 202125077U
Authority
CN
China
Prior art keywords
sleeve
shear wall
sleeve pipe
template supporting
shirt rim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201943300U
Other languages
Chinese (zh)
Inventor
王信义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011201943300U priority Critical patent/CN202125077U/en
Application granted granted Critical
Publication of CN202125077U publication Critical patent/CN202125077U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model belongs to the technical field of building element manufacture and in particular relates to a sleeve for supporting a template in concreting during the construction process of a shear wall. The technical scheme is that two ends of the sleeve respectively form a protruding type flange, and the space between the two flanges is in conformity with the thickness of the shear wall. The template supporting sleeve combines the functions of a sleeve, a supporting rod and a plug of the existing technology, can be applied to cementing construction of the shear wall, has the advantages of being simple and convenient to operate and simple in structure, saving building materials, lowering manufacture cost and construction cost and the like, and simultaneously facilitates recycling of split bolts.

Description

Build the template supporting sleeve that shear wall is used
Technical field
The utility model belongs to building unit manufacturing technology field, is specifically related in the work progress of shear wall, when concreting, is used for the sleeve pipe of support shuttering.
Background technology
At present, in the construction of shear wall, earlier make strut (generally adopting the cement square column at present) according to its thickness, then build template, aforementioned fagging is gone in support between the relative template in both sides, and the length of this fagging is the spacing of two side templates, also is the thickness of shear wall.Also need cross sleeve pipe between the relative template in both sides, the two ends of this sleeve pipe Screw arbor with nut at both-ends that spins respectively, Screw arbor with nut at both-ends wait parts to compress the outer wall of template through the butterfly button of screwing again, thereby when concreting, two side templates fixedly positioning, and can not squint.In addition, because of there is certain slit in the outer wall and the template of sleeve pipe, and when concreting, from then on the part cement paste is prone to the slit and flows out, thus the influence construction.In order to prevent above-mentioned situation, the contact site that generally is employed in both at present installs plug additional, to seal this slit.The defective that above-mentioned prior art exists is: not only cost is high 1, to make strut separately, and the also corresponding increase of working procedure; 2, parts are many, and scattered, when causing installed module, and troublesome poeration.
Summary of the invention
In order to solve the above-mentioned technical problem that prior art exists, the utility model discloses in a kind of shear wall construction process, during concreting, be used for the sleeve pipe of support shuttering.
The utility model is taked following technical scheme: build the template supporting sleeve that shear wall is used, the two ends of sleeve pipe respectively form the raised type shirt rim, and the spacing of two shirt rims and the thickness of shear wall are consistent.
Described template supporting sleeve, it is circular that the shirt rim is.
Described template supporting sleeve, this end end face of shirt rim and sleeve pipe keeps a determining deviation.
Described template supporting sleeve, the outer wall cross part of shirt rim and sleeve pipe forms reinforcing rib, and described reinforcing rib is in the inboard, shirt rim.
Described template supporting sleeve, reinforcing rib and shirt rim are perpendicular, and parallel with the axis of sleeve pipe.
Described template supporting sleeve, the port capping end cap of sleeve pipe.
Described template supporting sleeve, sleeve pipe is made of plastics.
The template supporting sleeve of the utility model has the function of prior art middle sleeve, strut and plug concurrently; It is applied in concreting construction of shear wall, have easy and simple to handle, simple in structure, practice thrift constructional materials, reduce advantages such as manufacturing cost and construction cost; Simultaneously, also help the recovery of Screw arbor with nut at both-ends.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Fig. 2 is the application state structure chart of the utility model.
The specific embodiment
Below in conjunction with accompanying drawing the utility model embodiment is elaborated.
As shown in Figure 1; Template supporting sleeve 1 is made of plastics; Its two ends form raised type shirt rim 11, and the end face of shirt rim 11 and sleeve pipe 1 leaves certain distance and (leaves this section sleeve pipe, in use; Can prevent that cement paste from leaking out and the bonding Screw arbor with nut at both-ends of living, thereby can make things convenient for the dismounting and the recovery of Screw arbor with nut at both-ends); Shirt rim 11 is circular, and the cross part of itself and sleeve pipe 1 outer wall forms many reinforcing ribs that are uniformly distributed with 12, and reinforcing rib 12 and shirt rim 11 are perpendicular and parallel with the axis of sleeve pipe 1, and its inboard that is in shirt rim 11 is promptly towards the other end of sleeve pipe.The two-end structure of sleeve pipe 1 is symmetrical.The spacing of shirt rim, two ends is the thickness of shear wall.
Fig. 2 has shown the molded structure that is used to build shear wall; Two side templates 7 are relative and parallel; Two side templates 7 cross sleeve pipe 1, and shirt rim 11 lateral surfaces of sleeve pipe 1 paste with the inwall of template 7 mutually, and the spacing of two side templates is two shirt rim spacings of sleeve pipe 1; 7 concretings of two templates, thus this spacing of two side templates 7 also is the thickness of shear wall.
Template 7 outer walls support the lumps of wood 6, and the lumps of wood 6 outer walls support two vertical steel pipes 3.Stretch out outside the template 7 end of sleeve pipe 1, and the butt joint screw rod 2 that spins, and the Screw arbor with nut at both-ends 2 outer ends nut 4 that spins, nut 4 compress butterfly button 5, and butterfly button 5 compresses the steel pipe 3 and the lumps of wood 6 again.Thereby two templates 7 just fixedly positioning, and can not squint.
After the typing of concreting and shear wall, remove that screw rod 2, steel pipe 3, nut 4, butterfly buckles 5, the lumps of wood 6 and template 7, and cut off and partly stretch out the sleeve pipe outside the shear wall, sleeve port can adopt and whitewash or end cap is sealed.
Because the template supporting sleeve of the utility model has the shirt rim, this shirt rim can support shuttering, thereby it has had the effect of strut in the prior art; Simultaneously, it has blocked sleeve pipe and die clearance again, thereby it has had the function of plug in the prior art again; Therefore, the sleeve pipe of the utility model has the function of prior art middle sleeve, strut and plug concurrently, and it is applied in concreting construction of shear wall, have easy and simple to handle, simple in structure, practice thrift constructional materials, reduce advantages such as manufacturing cost and construction cost; Simultaneously, also help the recovery of Screw arbor with nut at both-ends.
More than the preferred embodiment of the utility model is specified; As far as those of ordinary skill in the art; The thought that provides according to the utility model; The part that on the specific embodiment of the utility model and range of application, all can change, these change the protection domain that also should be regarded as the utility model.

Claims (7)

1. build the template supporting sleeve that shear wall is used, it is characterized in that: the two ends of said sleeve pipe respectively form the raised type shirt rim, and the spacing of two shirt rims and the thickness of shear wall are consistent.
2. template supporting sleeve as claimed in claim 1 is characterized in that: described shirt rim is circular.
3. template supporting sleeve as claimed in claim 1 is characterized in that: this end end face of said shirt rim and sleeve pipe keeps a determining deviation.
4. like each described template supporting sleeve of claim 1-3, it is characterized in that: the outer wall cross part of described shirt rim and sleeve pipe forms reinforcing rib, and described reinforcing rib is in the inboard, shirt rim.
5. template supporting sleeve as claimed in claim 4 is characterized in that: described reinforcing rib and shirt rim are perpendicular, and parallel with the axis of sleeve pipe.
6. template supporting sleeve as claimed in claim 1 is characterized in that: the port capping end cap of said sleeve pipe.
7. like claim 1-3 or 6 each described template supporting sleeves, it is characterized in that: described sleeve pipe is made of plastics.
CN2011201943300U 2011-06-10 2011-06-10 Template supporting sleeve for pouring shear wall Expired - Fee Related CN202125077U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201943300U CN202125077U (en) 2011-06-10 2011-06-10 Template supporting sleeve for pouring shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201943300U CN202125077U (en) 2011-06-10 2011-06-10 Template supporting sleeve for pouring shear wall

Publications (1)

Publication Number Publication Date
CN202125077U true CN202125077U (en) 2012-01-25

Family

ID=45488148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201943300U Expired - Fee Related CN202125077U (en) 2011-06-10 2011-06-10 Template supporting sleeve for pouring shear wall

Country Status (1)

Country Link
CN (1) CN202125077U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108131014A (en) * 2018-01-25 2018-06-08 成都市第二建筑工程公司 Stair concrete-pouring moulding template

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108131014A (en) * 2018-01-25 2018-06-08 成都市第二建筑工程公司 Stair concrete-pouring moulding template

Similar Documents

Publication Publication Date Title
CN201762991U (en) Corrugated pipe cylinder formwork
CN103912121A (en) Door and window angle bead, door and window mould and method for pouring concrete wall body with door and window holes
CN202125077U (en) Template supporting sleeve for pouring shear wall
CN204920210U (en) Dysmorphism spar template reinforced structure
CN204626966U (en) A kind of deformation joint formwork erection device
CN106194210B (en) The installation method of tunnel lining trolley, working method and pre-pouring grout pipe fixing device
CN101832025A (en) Sealing up screw
CN201704954U (en) Formwork opposite-pulling device for pouring waterproof walls
CN103089007A (en) Cast-in-place concrete floor punching pipe seal template device and using method
CN205329900U (en) Prefabricated coincide wallboard underground waterproof construction
CN213927514U (en) Plug for two end parts of oppositely-pulling screw rod of building template
CN203334678U (en) Outer wall formwork strengthening system for concrete pouring
CN205100551U (en) Pipe root box out mold stripping for concreting
CN204418670U (en) The sealing concrete pad used in a kind of building operations
CN203684653U (en) Fair-faced concrete wall insulation connection structure
CN104088453B (en) A kind of scaffold edge support structure and using method thereof
CN204626973U (en) A kind of sealing up screw for building
CN201671338U (en) Water-stop screw rod
CN203201148U (en) Combined inner support of wall template
CN201245975Y (en) Angle mould-changeable formwork support system for concrete core barrel inner wall
CN204781921U (en) Pour and use aluminum dipping form
CN204174936U (en) A kind of template support structure of outer wall of basement
CN203452377U (en) Plastic steel hollow porous internal corner template
CN204475863U (en) A kind of recoverable one-sided side bar formwork bracing means
CN203394043U (en) Shaping steel support inside corner template transverse bar

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120125

Termination date: 20120610